Topic Indices and Site Maps Search - Bureau of Ocean Energy Management, Regulation and Enforcement Home - Bureau of Ocean Energy Management, Regulation and Enforcement Bureau of Ocean Energy Management, Regulation and Enforcement
 
 
Technology Assessment & Research (TA&R) Projects Listed by Number
Technology Assessment & Research (TA&R) Program
Technology Assessment & Research (TA&R) International Activities
Oil Spill Response Research Program
Renewable Energy Research
Renewable Energy Test Tank
Operational Safety and Engineering Research
Technology Assessment & Research (TA&R) Projects Listed by Category
Technology Assessment & Research (TA&R) Workshops
How to Request Technology Assessment & Research (TA&R) Reports
How to Submit Research Proposals
Offshore Energy and Minerals Management Homepage
5-Year OCS Leasing Program
Environmental Stewardship
ECON
GOMESA Revenue Sharing
International Activities
Coastal Impact Assistance Program (CIAP)
Jobs
Leasing
Mapping and Data
Leasing Moratorium Information
Offshore Safety
Offshore Stats & Facts
Operations
Past 5-Year Programs
Penalties
Regulatory Compliance
Renewable Energy Program
Research
Resource Evaluation
2006 National Assssment
2006 National Assessment Map
Contact Us
Navy Spacer
Alaska Region
Atlantic
Gulf of Mexico
Pacific Region
Navy Spacer
 
 Hot Topics:

   NEW Reforms


   Ocean Energy
   Safety Advisory
   Committee

   Notice to Lessees

   Well Permits and
   Plans

   Investigations and
   Review Unit

   Deepwater Horizon
   Library & Reading
   Room

 

Navy Spacer
 
 Contact:
    OEMM Web Team

 
Navy Spacer
 
Technology Assessment & Research (TA&R) Program
 
Project Number 395
Date of Summary  February 27, 2004
Subject Extending Temporary Storage Capacity Offshore with Emulsion Breakers
Performing Activity S.L. Ross Environmental Research Ltd.
Principal Investigator Mr. Ian Buist
Contracting Agency Minerals Management Service
Completion Completed
Description The purpose of the study was assess the effectiveness of chemical emulsion breakers combined with rapid decanting and treatment of recovered oil when responding to an offshore oil spill. This effort builds upon previous project entitled “Testing at Ohmsett to Determine Optimum Times to Decant to Temporary Storage Devices” Project 298, where S. L. Ross tested at Ohmsett, decanting at several different periods to determine the best time to separate excess water collected during oil spill clean-up operations. Know the proper time to decant will insure that the captured oil is not re-released in the water and it will allow the skimming vessel to remain on location longer. Adding chemicals to this operation will further aid water/oil separation and allow for more frequent and cleaner decanting.
Progress Project is complete.
Report
AA (5.5MB PDF Extending Temporary Storage Capacity Offshore with Emulsion Breakers, S.L. Ross Environmental Research , March 15, 2002.
AB (2.8MB PDF Buist, Ian, Lewis, A., Guarino, A., DeVitis, D., Nolan, K., Smith,B., Lane, J., “Extending Temporary Storage Capacity with Emulsion Breakers”, Proceedings of the 25th Arctic and Marine Oil Spill Program (AMOP) Technical Seminar, pp. 139-168, Environmental Canada, Ottawa, Ontario, 2002.
AC (1.0MB PDF Buist, Ian., Potter, S., Lewis, A., Guarino, A., DeVitis, D., Smith, B., Lane, J., “Decanting Test at Ohmsett with and without Emulsion Breakers”, Proceedings of the 2003 International Oil Spill Conference, pp. 827-831, API, Washington, D. C., 2003.
AD (1.3MB PDF Buist, I., Lewis, A., Devitis, D., Studies on Decanting Recovered Oil Spill Fluids, Proceedings of the Interspill 2004 Conference, Trondheim, Norway, 2004

Last Updated: 12/22/2010, 10:38 AM Central Time