Watts Bar 1

2Q/2012 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 1.0 0 1.0 0 0 0 0
Critical hours 2208.0 2126.2 2159.0 1054.1 2208.0 2058.5 2183.0 2184.0
                 
Indicator value 0.8 1.6 1.6 1.9 1.9 0.9 0.9 0


Licensee Comments:

2Q/11: Automatic reactor trip May 29, 2011 due to turbine trip from Automatic Voltage Regulator.




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 1.0 0 0 1.0 1.0 0 0 0
Critical hours 2208.0 2126.2 2159.0 1054.1 2208.0 2058.5 2183.0 2184.0
                 
Indicator value 0.8 0.8 0.8 1.9 1.9 1.9 1.9 0.8

Licensee Comments:

2Q/11: Manual turbine trip May 23, 2011 to repair EHC weld failure. Reactor remained critical.

3Q/10: 8/15/10 Forced outage manual turbine trip - EHC leak on LP B west side reheat stop valve emergency dump line.






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 3.31E-08 3.12E-08 4.69E-07 5.10E-07 8.30E-07 9.19E-07 9.10E-07 7.43E-07
URI (ΔCDF) -9.54E-08 -9.54E-08 -2.58E-06 -2.58E-06 -2.58E-06 -2.58E-06 -3.06E-06 -3.03E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -6.20E-08 -6.40E-08 -2.10E-06 -2.10E-06 -1.70E-06 -1.70E-06 -2.10E-06 -2.30E-06

Licensee Comments:

4Q/11: Risk Cap Invoked.

3Q/11: Risk Cap Invoked.

2Q/11: Risk Cap Invoked.

1Q/11: Risk Cap Invoked. During the 4Q2010 Watts Bar issued a CAFTA PRA model. The revision changed the PRA values for the MSPI Core Damage Frequency and the unavailability and unreliability values. This change is effective 1Q2011. The details are available in the Watts Bar Basis Document.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.52E-08 -1.54E-08 -2.90E-08 -5.79E-08 -5.94E-08 -5.92E-08 -5.94E-08 -5.87E-08
URI (ΔCDF) -1.89E-07 -1.89E-07 4.34E-08 -1.36E-08 -1.37E-08 -1.39E-08 -1.40E-08 -1.42E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.00E-07 -2.00E-07 1.40E-08 -7.10E-08 -7.30E-08 -7.30E-08 -7.30E-08 -7.30E-08

Licensee Comments:

1Q/11: During Fourth quarter of 2010 Watts Bar issued a CAFTA PRA model. The revision changed the PRA values for the MSPI Core Damage Frequency, and the unavailability and unreliability values. This change is effective first quarter 2011. The details are available in Watts Bar Basis Document.

4Q/10: Changed PRA Parameter(s). During PRA update for 1Q2011 data that was initially entered caused change in this quarter which was not intended. The data was corrected (returned to previous) and record was reapproved. No change in MSPI resulted for this quarter.

3Q/10: Changed PRA Parameter(s). During PRA update for 1Q2011 data that was initially entered caused change in this quarter which was not intended. The data was corrected (retunred to previous) and record was reapproved. No change in MSPI resulted for this quarter.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 3.14E-07 3.71E-07 7.39E-07 6.84E-07 5.29E-07 4.71E-07 4.68E-07 4.27E-07
URI (ΔCDF) 2.49E-07 2.49E-07 1.22E-07 1.22E-07 -3.78E-07 -3.78E-07 -3.78E-07 -3.78E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 5.60E-07 6.20E-07 8.60E-07 8.10E-07 1.50E-07 9.30E-08 9.00E-08 4.90E-08

Licensee Comments:

2Q/11: Risk Cap Invoked.

1Q/11: Risk Cap Invoked. PRA recalculated their models and made AFW much more risk significant. Hours lost after remodeling on MDAFW Trains A and C and TDAFW Train C caused the drop close to White.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 2.83E-08 3.71E-08 2.27E-08 2.84E-08 3.91E-08 4.06E-08 4.17E-08 3.83E-08
URI (ΔCDF) -2.54E-07 -2.54E-07 -4.08E-08 -4.12E-08 -4.16E-08 -4.20E-08 -4.24E-08 -4.28E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.30E-07 -2.20E-07 -1.80E-08 -1.30E-08 -2.50E-09 -1.40E-09 -7.80E-10 -4.50E-09

Licensee Comments:

1Q/11: During Fourth quarter of 2010 Watts Bar issued a CAFTA PRA model. The revision changed the PRA values for the MSPI Core Damage Frequency, and the unavailability and unreliability values. This change is effective first quarter 2011. The details are available in Watts Bar Basis Document.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 4.80E-08 7.28E-08 4.97E-08 5.47E-08 5.02E-08 4.08E-08 3.87E-08 1.62E-07
URI (ΔCDF) 1.23E-08 2.49E-08 1.29E-08 -4.16E-08 -4.85E-08 -4.85E-08 -4.85E-08 -4.85E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 6.00E-08 9.80E-08 6.30E-08 1.30E-08 1.70E-09 -7.70E-09 -9.80E-09 1.10E-07

Licensee Comments:

1Q/11: During Fourth quarter of 2010 Watts Bar issued a CAFTA PRA model. The revision changed the PRA values for the MSPI Core Damage Frequency, and the unavailability and unreliability values. This change is effective first quarter 2011. The details are available in Watts Bar Basis Document.






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.001062 0.001066 0.001108 0.001161 0.001191 0.001186 0.001240 0.001306 0.001271 0.001073 N/A 0.000326
Technical specification limit 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
                         
Indicator value 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.4 N/A 0.1
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity 0.000338 0.000329 0.000336 0.000358 0.000360 0.000388 0.000401 0.000405 0.000417 0.000434 0.000442 0.000450
Technical specification limit 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
                         
Indicator value 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 0.010 0.010 0.010 0.010 0.030 0.020 0.020 0.030 0.030 0 0.020 0.050
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.1 0.1 0.1 0.1 0.3 0.2 0.2 0.3 0.3 0 0.2 0.5
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage 0.010 0.010 0.020 0.020 0.020 0.010 0.010 0.010 0.020 0.010 0.020 0.020
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.1 0.2 0.2

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 62.0 64.0 32.0 49.0 60.0 64.0 35.0 25.0
Total opportunities 62.0 65.0 32.0 50.0 60.0 67.0 35.0 26.0
                 
Indicator value 97.0% 97.2% 97.5% 97.3% 97.4% 97.0% 97.5% 98.5%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 79.0 78.0 78.0 74.0 74.0 70.0 69.0 71.0
Total Key personnel 79.0 78.0 78.0 74.0 74.0 70.0 69.0 71.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests 690 887 692 887 788 790 788 787
Total sirens-tests 693 891 693 891 792 792 792 790
                 
Indicator value 99.6% 99.6% 99.7% 99.6% 99.6% 99.7% 99.6% 99.6%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 