United States Nuclear Regulatory Commission - Protecting People and the Environment

Millstone 2

2Q/2012 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 1.0 0 1.0 0 0 0 0
Critical hours 2208.0 2134.5 2159.0 1408.9 1879.7 2209.0 2183.0 2184.0
                 
Indicator value 1.8 2.4 1.6 1.8 1.8 0.9 0.9 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 0 1.0 0 0 2.0 0 1.0 0
Critical hours 2208.0 2134.5 2159.0 1408.9 1879.7 2209.0 2183.0 2184.0
                 
Indicator value 0.9 0.8 0.8 0.9 2.8 1.8 2.7 2.5

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 0 0 0 1 0 0 1 0
                 
Indicator value 2 1 0 1 1 1 2 1

Licensee Comments:

2Q/11: LER 2011-001-00






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 2.25E-07 1.58E-07 1.31E-07 4.11E-08 4.14E-08 3.20E-08 2.02E-08 4.15E-08
URI (ΔCDF) 4.61E-09 3.00E-09 4.77E-10 7.10E-08 6.92E-08 -1.55E-07 -1.55E-07 -1.52E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.30E-07 1.60E-07 1.30E-07 1.10E-07 1.10E-07 -1.20E-07 -1.30E-07 -1.10E-07

Licensee Comments:

2Q/12: A condition report on the diesel was written on 6/29/12. This condition report is under review. If this event is determined to be a failure the 2nd quarter values will be updated in the 3rd quarter.

2Q/11: A PRA model change for Millstone Unit 2 was implemented during the second quarter.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -2.73E-07 -2.73E-07 -2.73E-07 -6.36E-08 -6.36E-08 -6.36E-08 -6.36E-08 -6.36E-08
URI (ΔCDF) -3.95E-08 1.17E-07 1.17E-07 1.48E-07 1.48E-07 1.46E-07 1.46E-07 1.44E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.10E-07 -1.60E-07 -1.60E-07 8.40E-08 8.40E-08 8.30E-08 8.20E-08 8.00E-08

Licensee Comments:

2Q/11: A PRA model change for Millstone Unit 2 was implemented during the second quarter.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -4.49E-08 -4.30E-08 -4.26E-08 -4.63E-08 -4.17E-08 -7.48E-08 -6.15E-08 -8.75E-08
URI (ΔCDF) -1.46E-07 -1.50E-07 -1.50E-07 -1.33E-07 -1.38E-07 -1.36E-07 -1.37E-07 -1.38E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.90E-07 -1.90E-07 -1.90E-07 -1.80E-07 -1.80E-07 -2.10E-07 -2.00E-07 -2.30E-07

Licensee Comments:

2Q/11: A PRA model change for Millstone Unit 2 was implemented during the second quarter.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -4.57E-10 -4.58E-10 -6.64E-10 -2.08E-10 -1.82E-10 -1.95E-10 -1.95E-10 -1.98E-10
URI (ΔCDF) -1.53E-08 -1.53E-08 -1.55E-08 -1.32E-08 -1.31E-08 -1.33E-08 -1.35E-08 -1.36E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.60E-08 -1.60E-08 -1.60E-08 -1.30E-08 -1.30E-08 -1.30E-08 -1.40E-08 -1.40E-08

Licensee Comments:

2Q/11: A PRA model change for Millstone Unit 2 was implemented during the second quarter.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -2.75E-08 -3.61E-08 -3.61E-08 -1.40E-09 5.34E-09 5.34E-09 5.33E-09 5.05E-09
URI (ΔCDF) 1.99E-07 -1.98E-07 -1.99E-07 -6.20E-08 -6.28E-08 -6.35E-08 -6.42E-08 -6.42E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.70E-07 -2.30E-07 -2.40E-07 -6.30E-08 -5.70E-08 -5.80E-08 -5.90E-08 -5.90E-08

Licensee Comments:

2Q/11: A PRA model change for Millstone Unit 2 was implemented during the second quarter.

1Q/11: Changed PRA Parameter(s).






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.001580 0.001630 0.001710 0.001730 0.002030 0.001930 0.002020 0.002020 0.002460 0.002130 0.000863 0.000989
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity 0.001300 0.001040 0.001040 0.001140 0.001210 0.001210 0.001250 0.001320 0.001450 0.001420 0.001430 0.001540
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 0.047 0.006 0.027 0.018 0.056 0.009 0.014 0.005 0.022 0 0.033 0.002
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.5 0.1 0.3 0.2 0.6 0.1 0.1 0.1 0.2 0 0.3 0
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage 0.013 0.028 0.054 0.180 0.037 0.021 0.055 0.045 0.031 0.061 0.034 0.060
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.1 0.3 0.5 1.8 0.4 0.2 0.6 0.5 0.3 0.6 0.3 0.6

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 24.0 41.0 31.0 41.0 43.0 27.0 34.0 32.0
Total opportunities 25.0 43.0 31.0 44.0 43.0 27.0 34.0 32.0
                 
Indicator value 96.0% 95.9% 96.9% 96.2% 96.4% 96.7% 97.2% 97.8%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 138.0 138.0 138.0 137.0 139.0 137.0 138.0 133.0
Total Key personnel 138.0 138.0 138.0 137.0 139.0 137.0 138.0 133.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests 473 553 474 553 474 553 474 473
Total sirens-tests 474 553 474 553 474 553 474 474
                 
Indicator value 98.8% 99.2% 99.6% 100.0% 100.0% 100.0% 100.0% 99.9%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: July 24, 2012