Crystal River 3
2Q/2012 Performance Summary

Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.

Action Matrix

Performance Indicators Chart
 

PI Legend
 

Inspection Findings Chart
 
 
 
 

Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process