VAP Output : 30TWRMR

Sixty meter tower: mixing ratio at surface, 25-m, and 60-m, 30-min avg

Active Dates
1998.04.01 - 2009.09.29

Originating VAP Process
Tower Water-Vapor Mixing Ratio : TWRMR

Measurements

The measurements below provided by this product are those considered scientifically relevant.

Locations

  • Southern Great Plains (SGP)
    • Central Facility, Lamont, OK (C1)