VAP Output : 30TWRMR
Sixty meter tower: mixing ratio at surface, 25-m, and 60-m, 30-min avg
Active Dates
1998.04.01 - 2009.09.29
Originating VAP Process
Tower Water-Vapor Mixing Ratio : TWRMR
Measurements
The measurements below provided by this product are those considered scientifically relevant.
Locations
- Southern Great Plains (SGP)
- Central Facility, Lamont, OK (C1)