VAP Output : 1TWRMR
Sixty Meter Tower: mixing ratio at surface, 25-m, and 60-m, 1-min average
Active Dates
1998.04.01 - 2012.09.07
Originating VAP Process
Tower Water-Vapor Mixing Ratio : TWRMR
Measurements
The measurements below provided by this product are those considered scientifically relevant.
Locations
- Southern Great Plains (SGP)
- Central Facility, Lamont, OK (C1)