	Advanced Arresting Gear advancing construction of the jet car track site Oct. 2, 2009 when the first jet car test site cable drum support structure is installed at Naval Air Systems Command, Lakehurst, N.J.</p>

Advanced Arresting Gear advancing construction of the jet car track site Oct. 2, 2009 when the first jet car test site cable drum support structure is installed at Naval Air Systems Command, Lakehurst, N.J.


<p>
	Naval Air Systems Command, Lakehurst, N.J., receives water twisters for the Advanced Arresting Gear Oct. 2, 2009 for installation at the jet car test site.</p>

Naval Air Systems Command, Lakehurst, N.J., receives water twisters for the Advanced Arresting Gear Oct. 2, 2009 for installation at the jet car test site.


<p>
	Testing of the Advanced Arresting Gear power conditioning system continues simultaneous to construction of the jet car test site as the starboard build-out of air lines to manifolds shown here, takes place Nov. 20, 2009 at Naval Air Systems Command, Lakehurst, N.J.</p>

Testing of the Advanced Arresting Gear power conditioning system continues simultaneous to construction of the jet car test site as the starboard build-out of air lines to manifolds shown here, takes place Nov. 20, 2009 at Naval Air Systems Command, Lakehurst, N.J.


<p>
	The Aircraft Launch and Recovery Equipment program’s Advanced Arresting Gear team accepts delivery Dec. 11, 2009 and installs the conical/cable drum assembly at the jet car test site being constructed at Naval Air Systems Command, Lakehurst, N.J.</p>

The Aircraft Launch and Recovery Equipment program’s Advanced Arresting Gear team accepts delivery Dec. 11, 2009 and installs the conical/cable drum assembly at the jet car test site being constructed at Naval Air Systems Command, Lakehurst, N.J.


<p>
	The Aircraft Launch and Recovery Equipment program’s Advanced Arresting Gear team accepts delivery Dec. 11, 2009 and installs the conical/cable drum assembly at the jet car test site being constructed at Naval Air Systems Command, Lakehurst, N.J.</p>

The Aircraft Launch and Recovery Equipment program’s Advanced Arresting Gear team accepts delivery Dec. 11, 2009 and installs the conical/cable drum assembly at the jet car test site being constructed at Naval Air Systems Command, Lakehurst, N.J.