ROP Action Matrix Summary and Current Regulatory Oversight

Action Matrix assessments for some plants will appear different on this Web page now that the NRC has reintegrated security inspection results into the agency’s ROP assessment program. These security findings were previously identified under the separate security assessment program. As such they represent existing performance issues that have not been shown on the public Action Matrix for these plants until now. Future updates to the Action Matrix will reflect new safety and security findings.

The assessment program collects information from inspections and performance indicators (PIs) in order to enable the agency to arrive at objective conclusions about the licensee's safety performance. Based on this assessment information, the NRC determines the appropriate level of agency response, including supplemental inspection and pertinent regulatory actions ranging from management meetings up to and including orders for plant shutdown. The Action Matrix Summary listed below reflects overall plant performance and is updated regularly to reflect inputs from the most recent performance indicators and inspection findings. Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.

For those plants that are in the Regulatory Response Column, Degraded Cornerstone Column, Multiple/Repetitive Degraded Cornerstone Column, and Unacceptable Performance Column of the Action Matrix, notes are provided to explain the assessment inputs that direct the associated regulatory response. Additionally, information on the current level of inspection at each reactor unit (based on deviations from the Action Matrix, supplemental inspection status, etc.) is also found below. For any licensee in the Licensee Response Column, the expected agency inspection is the baseline program.

The substantive cross-cutting issues are available on the ROP Substantive Cross Cutting Issues Summary page for each of the plants.

Last Modified: 09-05-2012

Current Regulatory Oversight Table

Region I | Region II | Region III | Region IV | Action Matrix Summary

Top of page Region I

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Beaver Valley 1 Licensee Response Column  Baseline inspection
Beaver Valley 2 Licensee Response Column  Baseline inspection
Calvert Cliffs 1 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Calvert 1 is in Column 1.
Baseline inspection
Calvert Cliffs 2 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Calvert 2 is in Column 1.
Baseline inspection
FitzPatrick Licensee Response Column  Baseline inspection
Ginna Licensee Response Column

Baseline inspection
Hope Creek 1 Degraded Cornerstone Column

Hope Creek is in Column 3 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 1Q2012.
Baseline inspection

and

IP 95002 supplemental inspection
Indian Point 2 Licensee Response Column  Baseline inspection
Indian Point 3 Licensee Response Column  Baseline inspection
Limerick 1 Licensee Response Column  Baseline inspection
Limerick 2 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a white inspection finding under the Mitigating Systems Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Limerick 2 is in Column 1.
Baseline inspection
Millstone 2 Regulatory Response Column

Millstone 2 is in Column 2 because of a white finding in the Initiating Events Cornerstone originating in 2Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Millstone 3 Licensee Response Column  Baseline inspection
Nine Mile Point 1 Licensee Response Column  Baseline inspection
Nine Mile Point 2 Licensee Response Column  Baseline inspection
Oyster Creek Licensee Response Column  Baseline inspection
Peach Bottom 2 Licensee Response Column  Baseline inspection
Peach Bottom 3 Licensee Response Column  Baseline inspection
Pilgrim 1 Regulatory Response Column

Pilgrim 1 is in Column 2 because of one white finding in the Mitigating Systems Cornerstone originating in 3Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Salem 1 Degraded Cornerstone Column

Salem 1 is in Column 3 because of one or more greater-than-green finding(s) in the Security Systems Cornerstone originating in 1Q2012.
Baseline inspection

and

IP 95002 supplemental inspection
Salem 2 Degraded Cornerstone Column

Salem 2 is in Column 3 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 1Q2012.
Baseline inspection

and

IP 95002 supplemental inspection
Seabrook 1 Regulatory Response Column

Seabrook 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Susquehanna 1 Regulatory Response Column

Susquehanna 1 is in Column 2 because of one white finding in the Initiating Events Cornerstone originating in 3Q2010. A prior 95002 was performed because Susquehanna 1 was in Column 3 (see report ML12125A374). The inspection found that the white finding was not adequately addressed. Therefore, the finding will be held open until it is inspected satisfactorily. Note that the White Performance Indicator (Unplanned Scrams per 7000 Critical Hours) associated with Column 3 was closed during the 95002 inspection.
Baseline inspection

and

Continuation of IP 95002 supplemental inspection to address remaining white finding
Susquehanna 2 Licensee Response Column  Baseline inspection
Three Mile Island 1 Licensee Response Column  Baseline inspection
Vermont Yankee Licensee Response Column  Baseline inspection

Top of page Region II

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Browns Ferry 1 Multiple/Repetitive Degraded Cornerstone Column

Browns Ferry 1 is in Column 4 because of a red finding in the Mitigating Systems Cornerstone originating in 4Q2010.
Baseline inspection

and

IP 95003 supplemental inspection
Browns Ferry 2 Regulatory Response Column

Browns Ferry 2 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Browns Ferry 3 Regulatory Response Column

Browns Ferry 3 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012. Browns Ferry Unit 3 also has one white PI in the Initiating Events Cornerstone, Unplanned Scrams per 7000 Critical Hours, originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Brunswick 1 Regulatory Response Column

Brunswick 1 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Brunswick 2 Regulatory Response Column

Brunswick 1 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Catawba 1 Licensee Response Column  Baseline inspection
Catawba 2 Licensee Response Column  Baseline inspection
Crystal River 3 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a white inspection finding under the Emergency Preparedness Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Crystal River is in Column 1.
Baseline inspection
Farley 1 Regulatory Response Column

Farley 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Farley 2 Regulatory Response Column

Farley 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Harris 1 Licensee Response Column  Baseline inspection
Hatch 1 Licensee Response Column  Baseline inspection
Hatch 2 Licensee Response Column  Baseline inspection
McGuire 1 Licensee Response Column  Baseline inspection
McGuire 2 Licensee Response Column  Baseline inspection
North Anna 1 Regulatory Response Column

North Anna 1 is in Column 2 because of one white finding in the Mitigating Systems Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
North Anna 2 Regulatory Response Column

North Anna 2 is in Column 2 because of one white finding in the Mitigating Systems Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Oconee 1 Licensee Response Column

As detailed in the inspection report 2012011 (ML12068A353) Oconee 1 has a yellow inspection finding in the Mitigating Systems Cornerstone. This finding was determined to be an old design issue, and in accordance with IMC 0305, will not aggregate in the Action Matrix with other performance indicators and inspection findings. Although the yellow finding will not aggregate in the Action Matrix, it will remain open until all IP 95002 inspection objectives have been met and verified by inspection.
Baseline inspection

and

IP 95002 supplemental inspection
Oconee 2 Licensee Response Column

As detailed in the inspection report 2012011 (ML12068A353) Oconee 2 has a yellow inspection finding in the Mitigating Systems Cornerstone. This finding was determined to be an old design issue, and in accordance with IMC 0305, will not aggregate in the Action Matrix with other performance indicators and inspection findings. Although the yellow finding will not aggregate in the Action Matrix, it will remain open until all IP 95002 inspection objectives have been met and verified by inspection.
Baseline inspection

and

IP 95002 supplemental inspection
Oconee 3 Licensee Response Column

As detailed in the inspection report 2012011 (ML12068A353) Oconee 3 has a yellow inspection finding in the Mitigating Systems Cornerstone. This finding was determined to be an old design issue, and in accordance with IMC 0305, will not aggregate in the Action Matrix with other performance indicators and inspection findings. Although the yellow finding will not aggregate in the Action Matrix, it will remain open until all IP 95002 inspection objectives have been met and verified by inspection.
Baseline inspection

and

IP 95002 supplemental inspection
Robinson 2 Licensee Response Column

Baseline inspection
Saint Lucie 1 Degraded Cornerstone Column

Saint Lucie 1 is in Column 3 because of two white Initiating Events Cornerstone PIs both originating in 1Q2012.
Baseline inspection

and

IP 95002 supplemental inspection
Saint Lucie 2 Licensee Response Column  Baseline inspection
Sequoyah 1 Licensee Response Column

Baseline inspection
Sequoyah 2 Licensee Response Column  Baseline inspection
Summer Licensee Response Column  Baseline inspection
Surry 1 Licensee Response Column  Baseline inspection
Surry 2 Licensee Response Column  Baseline inspection
Turkey Point 3 Regulatory Response Column

Turkey Point Unit 3 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Turkey Point 4 Regulatory Response Column

Turkey Point Unit 4 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Vogtle 1 Licensee Response Column  Baseline inspection
Vogtle 2 Licensee Response Column  Baseline inspection
Watts Bar 1 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Watts Bar is in Column 1.
Baseline inspection

Top of page Region III

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Braidwood 1 Licensee Response Column  Baseline inspection
Braidwood 2 Regulatory Response Column

Braidwood 2 is in Column 2 because of one white PI in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Byron 1 Licensee Response Column  Baseline inspection
Byron 2 Licensee Response Column

Baseline inspection
Clinton Licensee Response Column  Baseline inspection
D.C. Cook 1 Licensee Response Column  Baseline inspection
D.C. Cook 2 Licensee Response Column  Baseline inspection
Davis-Besse Licensee Response Column  Baseline inspection
Dresden 2 Licensee Response Column  Baseline inspection
Dresden 3 Licensee Response Column  Baseline inspection
Duane Arnold Licensee Response Column  Baseline inspection
Fermi 2 Regulatory Response Column

Fermi is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2010.
Baseline inspection

and

IP 95001 supplemental inspection
Kewaunee Licensee Response Column  Baseline inspection
La Salle 1 Licensee Response Column  Baseline inspection
La Salle 2 Licensee Response Column  Baseline inspection
Monticello Licensee Response Column  Baseline inspection
Palisades Degraded Cornerstone Column

Palisades is in Column 3 because of a yellow finding in the Initiating Events Cornerstone originating in 4Q2011. Palisades also has a white finding in the Initiating Events Cornerstone and a white finding in the Mitigating Systems Cornerstone, both originating 4Q2011.
Baseline inspection

and

IP 95002 supplemental inspection
Perry 1 Degraded Cornerstone Column

Perry 1 is in Column 3 because of one white Occupational Radiation Safety Cornerstone PI and one white finding in the Occupational Radiation Safety Cornerstone both originating in 2Q2011.
Baseline inspection

and

IP 95002 supplemental inspection
Point Beach 1 Regulatory Response Column

Point Beach 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Point Beach 2 Regulatory Response Column

Point Beach 2 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Prairie Island 1 Regulatory Response Column

Prairie Island 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Prairie Island 2 Regulatory Response Column

Prairie Island 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Quad Cities 1 Licensee Response Column  Baseline inspection
Quad Cities 2 Licensee Response Column  Baseline inspection

Top of page Region IV

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Arkansas Nuclear 1 Licensee Response Column  Baseline inspection
Arkansas Nuclear 2 Licensee Response Column  Baseline inspection
Callaway Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Callaway is in Column 1.
Baseline inspection
Columbia Generating Station Licensee Response Column  Baseline inspection
Comanche Peak 1 Licensee Response Column  Baseline inspection
Comanche Peak 2 Licensee Response Column  Baseline inspection
Cooper Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary still indicates a white inspection finding under the Mitigating Systems Cornerstone. The supplemental inspection was performed satisfactorily. As of 1Q2012, the finding is closed and Cooper is in Column 1.
Baseline inspection
Diablo Canyon 1 Licensee Response Column  Baseline inspection
Diablo Canyon 2 Licensee Response Column  Baseline inspection
Fort Calhoun Under IMC 0350

Fort Calhoun is under the oversight of inspection manual chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition due to Significant Performance and/or Operational Concerns." For more information please see the letter dated December 13, 2011 (ML113470721).
Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's regulatory activities associated with assessing the performance issues at Fort Calhoun.
Grand Gulf 1 Licensee Response Column  Baseline inspection
Palo Verde 1 Regulatory Response Column

Palo Verde 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Palo Verde 2 Regulatory Response Column

Palo Verde 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
Palo Verde 3 Regulatory Response Column

Palo Verde 3 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 4Q2011.
Baseline inspection

and

IP 95001 supplemental inspection
River Bend 1 Regulatory Response Column

River Bend is in Column 2 because of one white PI in the Initiating Events Cornerstone for Unplanned Scrams with Complications originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
San Onofre 2 Regulatory Response Column

San Onofre 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
San Onofre 3 Regulatory Response Column

San Onofre 3 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
South Texas 1 Licensee Response Column  Baseline inspection
South Texas 2 Licensee Response Column  Baseline inspection
Waterford 3 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a white inspection finding under the Occupational Radiation Safety Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Waterford is in Column 1.
Baseline inspection
Wolf Creek 1 Regulatory Response Column

Wolf Creek is in Column 2 because of a white PI in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection


Top of page  Action Matrix Summary

Licensee Response Column Regulatory Response Column Degraded Cornerstone Column Multiple/Repetitive Degraded Cornerstone Column Unacceptable Performance Column
Arkansas Nuclear 1 Braidwood 2 Hope Creek 1 Browns Ferry 1  
Arkansas Nuclear 2 Browns Ferry 2 Palisades    
Beaver Valley 1 Browns Ferry 3 Perry 1    
Beaver Valley 2 Brunswick 1 Saint Lucie 1    
Braidwood 1 Brunswick 2 Salem 1    
Byron 1 Farley 1 Salem 2    
Byron 2 Farley 2      
Callaway Fermi 2      
Calvert Cliffs 1 Millstone 2      
Calvert Cliffs 2 North Anna 1      
Catawba 1 North Anna 2      
Catawba 2 Palo Verde 1      
Clinton Palo Verde 2      
Columbia Generating Station Palo Verde 3      
Comanche Peak 1 Pilgrim 1      
Comanche Peak 2 Point Beach 1      
Cooper Point Beach 2      
Crystal River 3 Prairie Island 1      
D.C. Cook 1 Prairie Island 2      
D.C. Cook 2 River Bend 1      
Davis-Besse San Onofre 2      
Diablo Canyon 1 San Onofre 3      
Diablo Canyon 2 Seabrook 1      
Dresden 2 Susquehanna 1      
Dresden 3 Turkey Point 3      
Duane Arnold Turkey Point 4      
FitzPatrick Wolf Creek 1      
Ginna        
Grand Gulf 1        
Harris 1        
Hatch 1        
Hatch 2        
Indian Point 2        
Indian Point 3        
Kewaunee        
La Salle 1        
La Salle 2        
Limerick 1        
Limerick 2        
McGuire 1        
McGuire 2        
Millstone 3        
Monticello        
Nine Mile Point 1        
Nine Mile Point 2        
Oconee 1        
Oconee 2        
Oconee 3        
Oyster Creek        
Peach Bottom 2        
Peach Bottom 3        
Quad Cities 1        
Quad Cities 2        
Robinson 2        
Saint Lucie 2        
Sequoyah 1        
Sequoyah 2        
South Texas 1        
South Texas 2        
Summer        
Surry 1        
Surry 2        
Susquehanna 2        
Three Mile Island 1        
Vermont Yankee        
Vogtle 1        
Vogtle 2        
Waterford 3        
Watts Bar 1        

Top of pageTop of Page