United States Nuclear Regulatory Commission - Protecting People and the Environment

Site Additions in 2012

On this page:

See also New on Our Site for current additions.

June

June 26, 2012

Special NRC Oversight at San Onofre Nuclear Generating Station (SONGS): Steam Generator Tube Degradation
The NRC modified its regulatory oversight of SONGS Unit 2 and Unit 3 to address unusual degradation of newly installed steam generator tubes. The purpose of this special oversight is to review the licensee's response to the initial indications of the tube leak, and verify that the licensee's actions are appropriate to ensure the integrity of the steam generators and to protect the health and safety of the public and the environment.

June 26, 2012

Sharing Information through Social Media
Social media enables the NRC to reach a broader audience and to better engage, inform, and educate the public--in real-time, through multiple channels. This new page highlights our social media offerings (NRC Blog, Twitter Feed, YouTube Channel, Flickr Gallery, and RSS Feeds) and presents metrics regarding our success in this initiative.

June 15, 2012

NUREG–2116
Safety Evaluation Report for the International Isotopes Fluorine Products, Inc. Fluorine Extraction Process and Depleted Uranium Deconversion Plant in Lea County, New Mexico

June 14, 2012

Integrated Source Management Portfolio (ISMP)
Information technology tools to support the NRC’s Radioactive Material Security Program and related radioactive materials licensing and tracking activities. The key systems that will comprise the ISMP include the National Source Tracking System (NSTS) and the future Web–Based Licensing (WBL) System and License Verification System (LVS).

June 14, 2012

NUREG/CR–7115
Performance of Metal and Polymeric O-Ring Seals in Beyond-Design-Basis Temperature Excursions

June 04, 2012

NUREG–0090, Volume 34
Report to Congress on Abnormal Occurrences – Fiscal Year 2011

May

May 25, 2012

NUREG–2125
Spent Fuel Transportation Risk Assessment

May 22, 2012

NUREG–2123
Safety Evaluation Report Related to the License Renewal of Columbia Generating Station

May 21, 2012

NUREG/CR–7002
Criteria for Development of Evacuation Time Estimate Studies

To top of page

April

April 26, 2012

NUREG/CR–7017
Preliminary, Qualitative Human Reliability Analysis for Spent Fuel Handling

April 23, 2012

NUREG/CR–7016
Human Reliability Analysis-Informed Insights on Cask Drops

April 18, 2012

NRC Open Government Plan Addendum: Activities for 2012 – 2013
With the issuance of this addendum, we invite you once again to Share Your Ideas about our evolving plan and see what others have contributed.

To top of page

March

March 29, 2012

NUREG/IA–0413
Assessment of TRACE 5.0 Against ROSA Test 3-1, Cold Leg SBLOCA

NUREG/IA–0412
Assessment of TRACE 5.0 Against ROSA Test 3-2, High Power Natural Circulation

NUREG/IA–0410
Post-Test Calculation of the ROSA/LSTF Test 3-2 using RELAP5/mod3.3

NUREG/IA–0409
Post-Test Calculation of the ROSA/LSTF Test 3-1 using RELAP5/mod3.3

To top of page

February

February 27, 2012

NUREG/CR-7028
Engineered Covers for Waste Containment: Changes in Engineering Properties and Implications for Long-Term Performance Assessment

NUREG/IA–0411
Simulation of the Experimental Series F2.2 at PKL Facility Using RELAP5/Mod 3.3

NUREG/IA–0401
Assessment of Two-Phase Critical Flow Models Performance in RELAP5 and TRACE against Marviken Critical Flow Tests

February 23, 2012

NUREG–2115, Volume 1–6
Central and Eastern United States Seismic Source Characterization for Nuclear Facilities

February 13, 2012

NUREG–1100, Volume 28
Congressional Budget Justification: Fiscal Year 2013

February 10, 2012

NUREG/CR-7110, Volumes 1 & 2
State-of-the-Art Reactor Consequence Analyses Project

NUREG-1935
State-of-the-Art Reactor Consequence Analyses (SOARCA) Report: Draft Report for Comment

NUREG/BR-0359
Modeling Potential Reactor Accident Consequences

February 6, 2012

NUREG/CR-6420
Self-Monitoring Surveillance System for Prestressing Tendons

To top of page

January

January 31, 2012

Special NRC Oversight at Fort Calhoun Station

January 13, 2012

NUREG-2113
Draft Environmental Impact Statement for the Proposed Fluorine Extraction Process and Depleted Uranium Deconversion Plant

January 6, 2012

NUREG/IA-0406
Post-Test Calculations on Steam Cool-Down Test QUENCH-04 with RELAP5, SCDAP/RELAP5, and TRACE

January 4, 2012

NUREG/IA-0403
Full Scale Loop Seal experiments with TRACE V5 Patch 1

To top of page

Page Last Reviewed/Updated Tuesday, August 28, 2012