8/8/2007 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Believes Closure of Recommendation 2000-2 is Appropriate |
PDF |
3/27/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Issues a Reporting Requirement to DOE for a List of Vital Safety Systems at Each Site and Qualifications of Safety Personnel |
PDF |
3/3/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Oversight Programs of the Savannah River Operations Office |
PDF |
1/4/2005 |
Linton F. Brooks |
John T. Conway |
Interim Report Regarding configuration Management for Vital Safety Systems at Lawrence Livermore National Laboratory |
PDF |
11/3/2004 |
John T. Conway |
Spencer Abraham |
Board Issues a Reporting Requirement for a Report within 60 Days Addressing Vital Safety Systems and a Resource-Loaded Schedule Implementing Management Program |
PDF |
1/27/2004 |
John T. Conway |
Linton Brooks |
Application of Engineering Standards and Practices at Los Alamos National Laboratory |
PDF |
1/14/2004 |
Edward B. Blackwood |
John T. Conway |
DOE Reporting Completion of Commitment 25 in Implementation Plan for Recommendation 2000-2 |
PDF |
12/17/2003 |
Edward B. Blackwood |
John T. Conway |
DOE Reports Completion of Commitment 24, Revision and Issuance of the Nuclear Air Cleaning Handbook, in Implementation Plan 2000-2 |
PDF |
9/30/2003 |
Roy J. Schepens |
John T. Conway |
Updated Listing of DOE Personnel Serving as Subject Matter Experts (SME) for Safety System Oversight |
PDF |
9/26/2003 |
James J. Mangeno |
John T. Conway |
Revision and Re-Issuance of the Nuclear Air Cleaning Handbook Relative to Implementation Plan 2000-2 |
PDF |
8/7/2003 |
John T. Conway |
Jessie Hill Roberson |
Status of Recommendation 2000-2, Configuration Management, Vital Safety Systems, at the Hanford Site |
PDF |
6/30/2003 |
James J. Mangeno |
John T. Conway |
DOE Provides a Status Update on the Revision and Re-Issuance of the Nuclear Air Cleaning Handbook Relative to Implementation Plan 2000-2 |
PDF |
6/12/2003 |
John T. Conway |
Jesse Hill Roberson |
Quality Assurance Improvement Plan Commitment 1.1.2 to Review Phase I and Phase II Assessments |
PDF |
6/12/2003 |
John T. Conway |
Spencer Abraham |
Summary of Site Visits to Review Progress in Implementing Recommendation 2000-2, Configuration Management, Vital Safety Systems |
PDF |
6/12/2003 |
John T. Conway |
Spencer Abraham |
Summary of Site Visits to Review Progress in Implementing Recommendation 2000-2, Configuration Management, Vital Safety Systems |
PDF |
6/12/2003 |
John T. Conway |
Spencer Abraham |
Summary of Site Visits to Review Progress in Implementing Recommendation 2000-2, Configuration Management, Vital Safety Systems |
PDF |
6/12/2003 |
John T. Conway |
Spencer Abraham |
Summary of Site Visits to Review Progress in Implementing Recommendation 2000-2, Configuration Management, Vital Safety Systems |
PDF |
5/2/2003 |
Jessie Hill Roberson |
John T. Conway |
DOE Provides Status on Institutionalizaing the Periodic Safety System Assessments Relative to the 2000-2 Implementation Plan |
PDF |
4/7/2003 |
Everet H. Beckner |
John T. Conway |
NNSA Plans for Institutionalizing Safety System Assessments Relative to the 2000-2 Implementation Plan |
PDF |
12/16/2002 |
John T. Conway |
Jessie Hill Roberson |
Status of Recommendation 2000-2, Configuration Management, Vital Safety Systems, Hanford |
PDF |
12/2/2002 |
Edward B. Blackwood |
John T. Conway |
DOE Path Forward Towards Closure of Recommendation 2000-2, Configuration Management, Vital Safety System |
PDF |
10/30/2002 |
Everet H. Beckner |
John T. Conway |
DOE Initial Phase II Assessment Report from the Nevada Operations Office, Waste Examination Facility, Visual Examination and Repackaging Building, Confinement Ventilation System Relative to the 2000-2 Implementation Plan |
PDF |
10/10/2002 |
Everet Beckner |
John T. Conway |
DOE Initial Phase II Assessment Report from the Kirtland Site Operations Office Relative to the 2000-2 Implementation Plan |
PDF |
9/18/2002 |
John T. Conway |
Spencer Abraham |
Actions Remaining to Implement Recommendation 2000-2 |
PDF |
7/11/2002 |
Greg Rudy |
John T. Conway |
DOE Informing the Board of a Revision to the Nuclear Air Cleaning Handbook Relative to Commitment 23 of the 2000-2 Implementation Plan |
PDF |
6/25/2002 |
Edward B. Blackwood |
John T. Conway |
DOE Forwards Information Regarding the Annual Reports to the Secretary on Environment, Safety and Health Assessments of Safety Systems Related to the 2000-2 Implementation Plan |
PDF |
5/23/2002 |
Jessie Hill Roberson |
John T. Conway |
DOE Forwarding the Initial Phase II Assessment Reports from the Office of River Protection, Richland Operations Office, and Savannah River Operations Official |
PDF |
5/6/2002 |
Spencer Abraham |
John T. Conway |
DOE Ongoing Efforts to Improve the Criticality Safety within the Department |
PDF |
4/26/2002 |
Ralph E. Erickson |
John T. Conway |
DOE Initial Phase II Assessment Report from the Oak Ridge National Laboratory, Building 3019A, Cell Off-Gas Confinement Ventilation System |
PDF |
4/19/2002 |
John T. Conway |
Spencer Abraham |
Emergency Power System at the Lawrence Livermore National Laboratory’s Plutonium Facility (Building 332) |
PDF |
4/11/2002 |
Roy Schepens |
John T. Conway |
DOE Functional Area Qualification Standard Update Schedule in Relation to Commitment 19 of Implementation Plan 2000-2 |
PDF |
4/9/2002 |
Edward B. Blackwood |
John T. Conway |
DOE Commitment 8 of Implementation Plan 2000-2 |
PDF |
4/9/2002 |
Jesse Hill Roberson |
John T. Conway |
DOE Initial Phase II Assessment Report from the Rocky Flats Field Office, Implementation Plan 2000-2 |
PDF |
4/4/2002 |
Edward B. Blackwood |
John T. Conway |
DOE List of Phase II Assessments and Expected Completion Dates for Commitment 6 of Implementation Plan 2000-2 |
PDF |
3/28/2002 |
Jessie Hill Roberson |
John T. Conway |
DOE Initial Phase II Assessment Reports from Carlsbad Field Office and Idaho National Engineering and Environmental Laboratory Relative to Implementation Plan 2000-2 |
PDF |
3/21/2002 |
Spencer Abraham |
John T. Conway |
DOE Change in Implementation Plan 2000-2, Configuration Management, Vital Safety Systems |
PDF |
3/21/2002 |
Spencer Abraham |
John T. Conway |
DOE Change in Implementation Plan for Recommendation 2000-2 |
PDF |
1/24/2002 |
Roy J. Schepens |
John T. Conway |
DOE Report Documenting Completion of Commitments 17 and 18 in Implementation Plan 2000-2 |
PDF |
1/17/2002 |
Steven V. Cary |
John T. Conway |
DOE Completion of Commitment 21 for Recommendation 2000-2 |
PDF |
12/18/2001 |
John T. Conway |
Spencer Abraham |
Process for Selecting Vital Safety Systems to Be Assessed for Operability and Performance of Assessments Regarding Recommendation 2000-2 |
PDF |
12/17/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information on Deliverables 16-20, and 23 in Implementation Plan 2000-2 |
PDF |
12/7/2001 |
Mark W. Frei |
John T. Conway |
Commencement of Phase II Assessments Relative to Implementation Plan 2000-2 |
PDF |
8/14/2001 |
John T. Conway |
Steven V. Cary |
Recommendation 2000-2, Configuration Management, Vital Safety Systems Pilot Phase II Assessment of Confinement Ventilation Systems at the Savannah River Site (SRS) and the Lawrence Livermore National Laboratory (LLNL). |
PDF |
8/1/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information Concerning Commitments 2 and 5 Relative to Implementation Plan 2000-2 |
PDF |
7/19/2001 |
Steven V. Cary |
John T. Conway |
DOE Provides Information on Commitments 17,18, and 19 of Implementation Plan 2000-2 |
PDF |
7/11/2001 |
Steven V. Cary |
John T. Conway |
DOE Reports Completion of Commitment 27 of Implementation Plan 2000-2 |
PDF |
7/10/2001 |
Steven V. Cary |
John T. Conway |
DOE Reports Completion of Commitment 4 of Implementation Plan 2000-2 |
PDF |
6/4/2001 |
Spencer Abraham |
John T. Conway |
DOE Letter Enclosing a Memorandum Regarding 100 Percent Quality Assurance Testing of HEPA Filters at the Filter Test Facility in Relation to Board Technical Report 23 and Implementation Plan 2000-2 |
PDF |
5/29/2001 |
John T. Conway |
Spencer Abraham |
Board Issues a Reporting Requirement within 60 days Regarding Two Public Meetings in February 2001 |
PDF |
5/15/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Enclosing a Deliverable for Commitment 13 of Implementation Plan 2000-2 |
PDF |
4/19/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information on Commitment 9 of Implementation Plan 2000-2 |
PDF |
4/2/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information on Deliverable 15 in Relation to Implementation Plan 2002-2 |
PDF |
3/15/2001 |
John T. Conway |
Brigadier General Thomas F. Gioconda |
Maintenance Program Review at Y-12 National Security Complex |
PDF |
3/15/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information Regarding Deliverable 20 Relative to Implementation Plan 2000-2 |
PDF |
3/14/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information on Deliverables 2 and 3 in Relation to Implementation Plan 2000-2 |
PDF |
2/21/2001 |
Steven V. Cary |
John T. Conway |
DOE Reports Completion of Commitment 14 of Implementation Plan 2000-2 |
PDF |
1/31/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding Information on Deliverables 2, 14, 27, 28, 29 under Implementation Plan 2000-2 |
PDF |
1/29/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Forwarding a Report on Initial Joint Review of Wildland Fire Safety and DOE Site |
PDF |
1/23/2001 |
Steven V. Cary |
John T. Conway |
DOE Letter Proposing Closure of Completed Commitment 1 in Implementation Plan 2000-2 |
PDF |
1/9/2001 |
Steven V. Cary |
DNFSB |
DOE Memorandum for Distribution on the Management Structure for Actions Under Implementation Plan 2000-2 |
PDF |
12/19/2000 |
Steven V. Cary |
John T. Conway |
DOE Informing the Board on the Completion of Commitment 26 in Implementation Plan 2000-2 and Proposing Closure of this Commitment |
PDF |
12/14/2000 |
John T. Conway |
Bill Richardson |
Board Accepts DOE Implementation Plan for Recommendation 2000-2 |
PDF |
12/7/2000 |
David Michaels |
John T. Conway |
DOE Relative to the Board's Technical Report 27, Fire Protection at Defense Nuclear Facilities |
PDF |
11/7/2000 |
John T. Conway |
Bill Richardson |
Safety Basis Expectations for Existing DOE Defense Nuclear Facilities and Activities |
PDF |
10/31/2000 |
Bill Richardson |
John T. Conway |
DOE Implementation Plan for Recommendation 2000-2 |
PDF |
10/31/2000 |
Bill Richardson |
John T. Conway |
DOE Initial Implementation Plan for 2000-2, Configuration Management, Vital Safety Systems |
PDF |
9/26/2000 |
John T. Conway |
Bill Richardson |
Board Commending DOE on its Initiative to Assess the Defense Nuclear Facilities of its State of Readiness and Capabilities to Deal with Fires, and Awaits the Department's plan for Recommendation 2000-2 |
PDF |
9/8/2000 |
John T. Conway |
Bill Richardson |
Board Acknowledges Notification that DOE Requires 45 More Days to Transmit Implementation Plan for Recommendation 2000-2 |
PDF |
8/21/2000 |
Bill Richardson |
John T. Conway |
DOE Request for an Additional 45 Days to Transmit the Implementation Plan for Recommendation 2000-2 |
PDF |
8/18/2000 |
John T. Conway |
Carolyn L. Huntoon |
Americium/Curium Solution Stabilization at the Savannah River Site |
PDF |
8/18/2000 |
John T. Conway |
General John A. Gordon |
Review of Fire Protection Program, Y-12 Plant |
PDF |
7/10/2000 |
John T. Conway |
Bill Richardson |
Procurement and Field Testing of HEPA Filters, Hanford Site |
PDF |
4/28/2000 |
Bill Richardson |
John T. Conway |
DOE Acknowledging Receipt of the Board's Recommendation 2000-2, Configuration Management, Vital Safety Systems and Accepting the Recommendations Contained therein |
PDF |