The goal of the OCS Civil/Criminal Penalties Program is to assure safe and clean operations on the OCS. Through the pursuit, assessment, and collection of civil penalties and referrals for the consideration of criminal penalties, the program is designed to encourage compliance with OCS statutes and regulations. 

2003 Civil/Criminal Penalties Summary
All Penalties Paid Calendar 2003
(1/1/2003 - 12/31/2003) 

Operator Name
and Case No.
 

Violation and Date(s) 

Penalty Paid and
Date Paid
 

Regulation(s) Violated
(30 CFR)
 

Tri-Union Development Corporation 

G-1999-033 

The PSH, PSL, LSH, LSL (water), and LSL (oil) for the remote well separator were bypassed at the master panel. 

05/17/99 – 05/18/99 

$30,000 

06/18/03 

30 CFR 250.803(c) 

Tri-Union Development Corporation 

(Offshore Consulting Services) 

G-1999-036 

The SCSSV for Well A-1 was bypassed. 

05/25/99 – 05/25/99 

$15,000 

06/18/03 

30 CFR 250.803(c) 

Tri-Union Development Corporation 

G-2000-003 

The PSV on the glycol separator was bypassed and not flagged properly or monitored. 

11/04/9911/08/99 

$10,000 

06/18/03 

30 CFR 250.803(c) 

Tri-Union Development Corporation 

(Offshore Consulting Services) 

G-2000-012 

This case involves 23 INC's. Two were failure to correct violations regarding hole in grating and broken handrails. The other 21 concerned improperly maintained and tested safety equipment including the ESD stations and the PSH's, PSL's, and PSV's on many production vessels. 

11/01/9803/23/99
03/16/99
03/16/99
03/18/99
03/18/99
03/18/99
03/18/99
03/18/99
03/18/99
03/18/99
03/18/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/99
03/22/02
03/22/02
03/24/99
03/24/99
05/24/98
03/22/99
05/26/98
03/22/99 

$338,800 

06/18/03 

30 CFR 250.20(c)
30 CFR 250.803(b)(1)
30 CFR 250.803(b)(1)
30 CFR 250.803(b)(1)
30 CFR 250.120(b)
30 CFR 250.803(b)(1)
30 CFR 250.803(b)(2)
30 CFR 250.803(b)(2)
30 CFR 250.803(b)(4)
30 CFR 250.803(b)(2)
30 CFR 250.803(b)(4)
30 CFR 250.803(b)(1)
30 CFR 250.120(a)
30 CFR 250.20(a)
30 CFR 250.20(a)
 

Tri-Union Development Corporation 

G-2000-013 

The PSH on Well A-3 was not tested as required.
 
 

05/15/99 - 05/25/99 

$7,500 

06/18/03 

30 CFR 250.804(a)(3) 

Tri-Union Development Corporation 

(Target Operators and Consulting, Inc.) 

G-2000-015 

The LSL on the Glycol Reboiler Surge Tank and the PSL on the Natural Draft Unit of the Reboiler were not tested for one month. 

10/23/99 - 10/23/99
10/23/99
- 10/24/99 

$24,000 

06/18/03 

30 CFR 250.804(a)(3)
30 CFR 250.804(a)(3)
 

Tri-Union Development Corporation 

(Target Operators and Consulting, Inc.) 

G-2000-016 

The LSH on the sump tank was bypassed. 

 

 

10/14/99 - 10/14/99 

$15,000 

06/18/03 

30 CFR 250.803(c) 

Tri-Union Development Corporation 

(Target Operators and Consulting, Inc.) 

G-2000-017 

Tri-Union produced on 5/25/99 while under a shut-in order pending corrective action. 

 
 

05/25/9905/25/99 

$8,000 

06/18/03 

30CFR 250.110(b)(1) 

Tri-Union Development Corporation 

(Target Operators and Consulting, Inc.) 

G-2000-018 

Failure to correct violations issued during 5/7/99 inspection concerning sustained casing pressure on Well No. 1. 

 

05/07/99 – 08/25/99 

$22,200 

06/18/03 

30 CFR 250.517(c) 

Tri-Union Development Corporation 

G-2000-019 

No record of testing PSH and PSL on MAJ-1902 (Compressor Fuel Filter) since component was installed on 8/14/99. 

09/14/99 – 12/07/99 

$36,000 

06/18/03 

30 CFR 250.804(a)(3) 

Tri-Union Development Corporation 

(Nabors Drilling Inc.) 

G-2002-009 

During a workover operation on Well A-2, the blowout preventer system was not equipped with an operable kill line. Also, there was not a remotely controlled valve on the choke line. These violations existed for 16 days. 

07/11/0107/11/01
06/21/01
07/06/01 

$160,000 

06/30/03 

30 CFR 250.615(c)
30 CFR 250.615(c)
 

Transworld Exploration and Production, Inc. 

(Island Operators Co. Inc.)  

G-2002-021 

The firewater pump was bypassed for 2 days. 

 

 

08/22/0108/23/01 

$30,000 

05/02/03 

30 CFR 250.803(c) 

Amerada Hess Corporation 

G-2002-022 

Operating upstream a vessel with the Pressure Safety Valve and Pressure Safety High set above the maximum allowable operating pressure of the departing oil pipeline with the pressure safety valve was taken out of service (SAC’d out) on the departing oil pipeline. 

02/07/02 - 02/07/02 

$10,000 

01/29/03 

30 CFR 250.1002 

Seneca Resources Corporation 

G-2002-023 

Operations were not performed in a safe and workmanlike manner, in that, the choke line was below the bottommost rams. This was due to the incorrect size rams that were originally placed below the choke line during a workover operation. 

02/25/02 03/13/02 

$85,000 

01/30/03 

30 CFR 250.107(a) 

Union Oil company of California 

G-2002-025 

Subsurface safety devices in Wells A-2, A-3, A-5, A-6, A-7, A-8, A-10, A-11, A-21, A-22, A-23, A-25, A-26, A-27, A-29, A-31, A-33, and subsea well #1 not tested for proper operations and leakage from September 25, 2000 to May 2001. Must be tested every 6 months. Missed one test per well. 

04/01/01 – 05/02/01
04/01/01 – 05/03/01
04/01/01 – 05/03/01
04/01/01 – 05/04/01
 

$54,000 

04/01/03 

30 CFR 250.804(a)(1)
30 CFR 50.124(a)(1)(i)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
 

Kerr-McGee Oil & Gas Corporation 

G-2002-026 

The subsurface safety valves in two completions were found leaking and left in service without repairing/replacing the valves. One downhole valve was known to be leaking for 186 days; the other, 365 days. 

01/01/01 – 01/07/02
07/06/01 – 01/07/02
 

$467,950 

04/09/03 

30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
 

Union Oil Company of California 

G-2002-028 

Subsurface safety devices in Wells A-1, A-2, A-3, A-4, and A-5 not tested for proper operation and leakage from September 25, 2001 to May 19, 2002. Must be tested every 6 months. Missed one test per well. 

03/31/02 05/19/02 

$15,000 

04/01/03 

30 CFR 250.804(a)(1) 

BP Exploration & Production Inc. 

(Charlie & Demples Production (C&D Production)) 

G-2002-033 

The fire water system was operating below the minimum required 75 psi. 

 
 

06/19/02 - 06/19/02 

$70,000 

01/09/03 

30 CFR 250.803(b)(8) 

PetroQuest Energy, L.L.C. 

(Baker Energy, Inc.) 

G-2002-034 

Lessee failed to prevent pollution to the offshore water (sheen measured approximately 1/4 mile long). The pressure safety high was bypassed on the Well No. 26 flow line for 4 days. 

05/21/0205/24/02
05/24/02
05/24/02 

$61,500 

05/05/03 

30 CFR 250.803(c)
30 CFR 250.300(a)
 

Samedan Oil Corporation 

(Offshore Production Corporation) 

G-2002-036 

The C-5, C-9 and C-14D wells were bypassed on the master control panel by tie-wrapping the relays in an open position.
  

05/31/0205/31/02 

$45,000 

04/25/03 

30 CFR 250.803(c) 

Chevron U.S.A. Inc. 

(Danos & Curole Marine Contractors, Inc.) 

G-2002-037 

The pressure safety lows on the two oil charge pumps and the pressure safety highs/lows on the on the two pipeline pumps were bypassed for 7 days. 

05/09/02 - 05/15/02 

$210,000  

01/24/03 

30 CFR 250.803(c) 

BP Exploration & Production Inc.  

G-2002-038 

Bypassed Relays for the Pressure Safety High/Low for four producing wells. 

05/07/02-05/10/02 

$80,000 

01/09/03 

30 CFR 250.803(c) 

Transworld Exploration and Production, Inc. 

(Production Management Incorporated) 

G-2002-039 

The subsurface controlled subsurface safety valve (SSCSV) in Well C-1 was removed on 3/27/00; well was left with open wellbore until new valve installed on 7/13/00. Master surface safety valve (SSV) and manual master in Well C-1 leaking since 3/27/00; not repaired as of 7/10/00 inspection. The surface controlled subsurface safety valve in 

Well C-5 was tested for leakage on 6/11/00; the leakage rate was calculated as exceeding the allowable leakage rate. The well was not shut-in and the valve was not repaired; instead, the well continued to produce. It has since been determined that the calculation included an error and the rate actually did not exceed the allowable rate. 

03/27/0007/11/00
03/30/00
05/03/00 

$82,500 

12/09/03 

30 CFR 250.804(a)(4)
30 CFR 250.801(e)
 

Vastar Offshore, Inc. 

G-2002-043 

The portable High Pressure Electrical Steam Cleaner and portable vacuum machine did not use an external ground for safe operations. 

06/27/02 06/27/02 

$20,000 

04/14/03 

30 CFR 250.107(a) 

Devon Louisiana Corporation 

G-2002-044 

Surface-controlled subsurface safety valve for Well No. 10 was blocked out of service. 

07/23/02 - 07/26/02 

$40,000 

01/23/03 

30 CFR 250.803(c) 

J. M. Huber Corporation 

(Grasso Production Management) 

G-2002-045 

Surface safety valve in Well A-6 was pinned out of service; was not flagged or being monitored. Glycol system was found bypassed; relays not flagged or monitored. Crane inspections of 4/2000 and 12/2000 show critical components need to be repaired or replaced; not done as of 6/16/2001 inspection. Subsurface controlled subsurface safety valve on Well A-6 last inspected 8/17/99; missed 3 six-month inspections. 

04/11/0006/16/01
06/15/01
06/16/01
06/15/01
06/16/01
08/17/99 – 06/16/01
 

$203,750 

12/15/03 

30 CFR 250.108
30 CFR 250.803(c)
30 CFR 250.803(c)
30 CFR 250.804(a)(1)
 

Devon Louisiana Corporation 

G-2002-046 

Relays for two wells placed in the bypass mode. 

10/21/01 10/24/01 

$80,000 

04/22/03 

30 CFR 250.803(c) 

El Paso Production Oil & Gas Company 

G-2002-047 

Accident occurred involving a crane on the platform due to unworkmanlike act and there was no annual inspection performed on the crane. 

08/11/02 – 08/11/02
08/11/02 – 08/11/02
 

$50,000 

07/07/03 

30 CFR 250.107(a)
30 CFR 250.108
 

GOM Shelf LLC 

G-2002-048 

The audible alarm for the ventilation system in the classified mud pit room was found in by-pass. 

08/09/02 – 08/09/02 

$17,500 

11/25/03 

30 CFR 250.410(e)(5) 

Tri-Union Development Corporation 

G-2002-052 

Oil entered the Gulf of Mexico from the overboard water line from the flotation cell. The following safety devices were bypassed: level safety high on the flotation cell, pressure safety high and pressure safety low on the water skimmer, level safety low on the oil treater. Additional incidents constituted unsafe and unworkmanlike operations: uncontrolled discharge of oil onto top deck through the opened lower valve on the skimmer oil bucket sight glass; liquid contained in platform's pneumatic supply system; hazardous accumulation of oil on top deck; deck drain line from top deck leaking oil onto the LACT skid; hatch covers on flotation cell found open. 

08/26/02 – 08/26/02
08/26/02 – 08/26/02

08/26/02
08/26/02
08/26/02
08/26/02 

$85,000 

07/31/03 

30 CFR 250.803(c)
30 CFR 250.107(a)
30 CFR 250.803(c)
30 CFR 250.300(a)
 

J. M. Huber Corporation 

(Bottomline Operating Enterprises, Inc.) 

G-2002-053 

Several well SCSSV and Plug Test not performed along with Gas Lift Lines not tested and electrical safety issues. 

02/01/01 – 03/05/01
02/01/01 – 12/31/01
07/01/01 – 12/31/01
05/01/00 – 06/10/01

11/01/01
11/17/01
11/01/01
11/20/01
11/01/01
11/20/01
11/01/01
11/21/01
11/01/01
11/21/01
11/01/01
11/21/01
11/01/01
11/21/01
11/01/01
11/23/01
11/01/01
11/23/01
11/01/01
11/28/01
10/01/01
11/21/01
10/01/01
11/21/01
10/01/01
11/22/01
09/01/01 – 12/10/01
09/01/01 – 09/12/01
02/07/02 – 02/07/02

01/23/02
01/24/02 

$159,000 

12/01/03 

30 CFR 250.804(a)(1)
30 CFR 250.804(a)(3)
30 CFR 250.804(a)(3)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.804(a)(1)
30 CFR 250.114(a)
30 CFR 250.107
 

Devon SFS Operating, Inc. 

G-2003-001 

Improperly secured crane, no annual inspection performed, and no load test performed resulting in a fatality and damage to the platform. 

05/05/02 – 05/05/02
05/05/02 – 05/05/02
 

$45,000 

10/27/03 

30 CFR 250.108
30 CFR 250.107(a)
 

BP America Production Company 

G-2003-002 

The Operator failed to conduct crane dismantling and removal operations in a safe and workmanlike manner, resulting in the crane falling into the Gulf of Mexico. Accident occurred due to failure to follow the procedures established in the Job Safety Analysis (JSA). 

11/02/0211/02/02 

$25,000 

11/24/03 

30 CFR 250.107(a) 

BP America Production Company 

G-2003-006 

Surface-controlled subsurface safety valve for Well No. E-18 was blocked out of service. 

01/03/03 – 01/03/03 

$20,000 

07/23/03 

30 CFR 250.803(c) 

Union Oil Company of California 

G-2003-008 

The block and bleed relays for the shut down valve on the 6" incoming high pressure pipeline were found tie-wrapped out of service. 

02/02/03 – 02/03/03 

$40,000 

08/06/03 

30 CFR 250.1004 

Nuevo Energy Company 

P-2002-002 

On 7/7/02, 9 barrels of crude leaked from Platform Edith to Elly 6" pipeline riser at Platform Elly into the ocean. 

01/01/02 – 07/07/02
07/07/02 – 07/07/02
 

$80,000 

03/24/03 

30 CFR 250.200
30 CFR 250.300(a)
 

Total Penalties Paid:01/01/2003 - 12/31/2003 

36 Cases:($2,742,700) 

The following acronyms are used in this table: 

ESD 

Emergency Shutdown Device 

INC 

Incident of Non-Compliance 

LACT 

Liquid Automatic Custody Transfer 

LSH 

Level Safety High 

LSL 

Level Safety Low 

MAWP 

Maximum Allowable Working Pressure 

NON 

Notice of Non-Compliance 

PSHL 

Pressure Safety High/Low 

PSL  

Pressure Safety Low 

PSV 

Pressure Safety Valve 

SCSSV 

Surface Controlled Subsurface Safety Valve 

SDV 

Shut Down Valve 

SSV 

Subsurface Valve 

The purpose of publishing the penalties summary is to provide information to the public on violations of special concern in OCS operations and to provide an additional incentive for safe and environmentally sound operations. 

The Oil Pollution Act (OPA 90) strengthened section 24 of the OCS Lands Act Amendments of 11038. Subtitle B of OPA 90, entitled "Penalties," increased the amount of the civil penalty from a maximum of $10,000 to a maximum of $20,000 per violation for each day of noncompliance. More importantly, in cases where a failure to comply with applicable regulations constitutes or constituted a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life); property; any mineral deposit; or the marine, coastal, or human environment; OPA 90 provided the Secretary of the Interior with the authority to assess a civil penalty without regard to the requirement of expiration of a period of time allowed for corrective action. 

On August 8, 1997, the MMS published new regulations (22 KB PDF) implementing the civil penalty provisions of the OCS Lands Act. Written in "plain English," the new question-and-answer format provides a better understanding of the OCS civil penalty process. In addition, the provisions of OPA 90 require the Secretary of the Interior to adjust the maximum civil penalty to reflect any increases in the Consumer Price Index. The new rule increased the maximum civil penalty to $25,000 per day per violation.