Sewer Collection System Extension Phase 3

$241,210

Town of Stanfield
103 West Stanly St
Stanfield, NC 28163

This is a major health issue for this small community and we are currently struggling to pay for the first phases of the sewer system installation that was done in 1999. They do not have the resources nor funds to fix this problem that was created before the Town had the responsibility to ensure that land could perk before allowing construction of homes. This problem was indeed inherited and is creating a health issue with fecal matter in the surrounding areas, waterways and yards.

Newsletter Sign Up

Get Congressman Kissell's email newsletter with news affecting the 8th District.

Subscribe
Made in America

Bill Search


scroll

Bill Number:
(Ex: "H.R. 1")
Word/Phrase:
(Ex: "Agriculture")

Follow Larry

Latest News

This Week in Washington
One of the most troubling and popular trends in Washington is the debate over which parts of the social safety...…
Rep. Kissell Discusses Domestic Manufacturing at Hornwood
LILESVILLE, NC – Rep. Larry Kissell (NC-08) met with Hornwood, Inc. President Chuck Horne while visiting the facility last week. Horne...…
House Approves Rep. Kissell's Effort Honoring Lions Club
WASHINGTON, DC –This week, the U.S. House of Representatives passed legislation introduced by Rep. Larry Kissell (NC-08) to honor the...…