Topic Indices and Site Maps Search - Bureau of Ocean Energy Management, Regulation and Enforcement Home - Bureau of Ocean Energy Management, Regulation and Enforcement Bureau of Ocean Energy Management, Regulation and Enforcement
Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEMRE)
About BOEMRE
Newsroom
FAQ
Renewable Energy Program
Offshore Energy and Minerals Management Program Home Page.
Environmental Stewardship
Research

Library
Kids' Page
Pipeline Open Access
GOMESA Revenue Sharing
Public Engagement
Contact UsSpacer ImageAlaska Region
Atlantic
Gulf of Mexico
Pacific RegionSpacer Image

Hot Topics:

Spacer Image


 Contact:
    Public Affairs

 
Navy Spacer

 

Status of Drilling Permits Subject to Enhanced Safety and Environmental Requirements in the Gulf of Mexico

In the wake of the Deepwater Horizon tragedy, the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) has put in place significant new safeguards to protect the environment beyond what has ever existed before. These new safety measures include heightened drilling safety standards to reduce the chances that a loss of well control might occur in the first place, as well as a new focus on containment capabilities in the event of an oil spill. For more information on new applicable regulations and standards for both shallow and deepwater drilling operations, see Offshore Drilling Safety Reforms.

Ongoing permitting: facts and figures (Please note that these numbers are updated daily)

  • Shallow water:  To date, 62 new shallow water well permits have been issued since the implementation of new safety and environmental standards on June 8, 2010.   Permits have averaged more than 6 per month over the past 8 months, compared to an average of 8 permits per month in 2009.  Just 3 of these permits are currently pending; with 6 having been returned to the operator for more information.

Deepwater drilling applications fall into two categories for the implementation of our new regulations. To clarify these differences, we have included the narrative below. The deepwater moratorium was lifted on October 12, 2010, and is the reference for inclusion of new rules in applications:

  • Deepwater permits requiring subsea containment: Since an applicant first successfully demonstrated containment capabilities in mid-February, we have approved 57 of these permits for 17 unique wells, with 26 permits pending, and 23 permits returned to the operator with requests for additional information, particularly information regarding containment.

  • Deepwater activities not requiring subsea containment: Since the implementation of new safety and environmental standards, 41 of these permits have been approved, with 1 currently pending. These activities include water injection wells and procedures using surface blowout preventers.

The tables below demonstrate aggregate permitting statistics for both shallow water and deepwater. The table for deepwater includes both those permits that are subject to containment requirements and those that are not.

To download copies of approved permits see the eWell Online Query.

Scroll over type of permit in the tables below for a definition of the permit.

Shallow Permits to Drill1

Data last updated on 06/29/2011 11:00 AM (CST)
and will be updated each business day.

Water Depth Less than or equal to 500 feet

Permit
Type

Submitted
prior to
June 8, 2010

Submitted
since
June 8, 2010

Returned2 Withdrawn3

Pending4

Approved
since
June 8, 2010
5

New Well

13 63 6 5 3 62

Revised New Well

9 114 1 2 2 118

Bypass

  25     1 24

Revised Bypass

  17       17

Sidetrack

16 96 8 3 7 94

Revised Sidetrack

6 105 2   1 108

Deepwater Permits to Drill6

Water Depth Greater than 500 feet

Permit
Type

Submitted
prior to
Oct 12, 2010

Submitted
since
Oct 12, 2010

Returned2 Withdrawn3

Pending7

Approved
since
Oct 12, 2010
8

New Well

15 28 15 2 17 9

Revised New Well

2 50 3 3 2 44

Bypass

  11 1     10

Revised Bypass

1 14   1 3 11

Sidetrack

4 10 2 1 4 7

Revised Sidetrack

4 17 2 1 1 17
  1. Shallow water drilling operations became subject to new rules and information requirements as of June 8, 2010.

  2. Submitted permit applications may be returned to the operator for further information or clarification. These applications are not counted as pending applications.

  3. Applications may be withdrawn by an operator at any time in the application process.

  4. Pending permit figures in this table include applications submitted before and after June 8, 2010. They do not include applications that have been returned.

  5. Approved permit figures in this table include applications submitted before and after June 8, 2010.

  6. The deepwater moratorium was lifted on October 12 and is the reference for inclusion of new rules in applications.

  7. Pending permit figures in this table include applications submitted before and after October 12, 2010. They do not include applications that have been returned.

  8. Approved permit figures in this table include applications submitted before and after October 12, 2010.


Status of Exploration and Development Plans Subject to Enhanced Safety and Environmental Requirements in the Gulf of Mexico has been moved to it's own page and can be found by clicking here.

 

Last Updated:  06/29/2011