*Categorical Exclusion Determination Documents (CX Determinations):
Date |
Title |
Reference No. |
Program |
02/01/2010 |
Receipt and Processing of TRU Soils from Nuclear Fuel Services (NFS) in Erwin, Tennessee by the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee |
CX-TWPC-09-0001 |
EM |
02/01/2010 |
Conducting Macroencapsulation Treatment in the Parking Lot of the Contact Handled Marshalling Building (CHMB) at the TRU Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee |
CX-TWPC-09-0003 |
EM |
03/02/2010
|
East Campus Parking Structure at the Oak Ridge National Laboratory (ORNL)
|
CX-3548X
|
SC
|
04/15/2010 |
Addition of a Temporary Locker Facility to the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee |
CX-TWPC-10-0002 |
EM |
05/11/2010 |
Installation and Operation of Majorana Underground Electro-forming Research Project |
CX-3561X |
SC |
05/11/2010 |
|
CX-3564X |
SC |
05/13/2010 |
Installing an Ammunition Storage Building and a Training Tower at the Central Training Facility (CTF) |
CX-ORR-10-0001 |
NNSA |
09/17/2010 |
Reconfiguration of Facilities to Support the Integrated Facilities Disposition Project |
CX-3572X |
EM |
06/29/2010 |
Storage of TRU and TRU Mixed Waste in Building 7860A at Oak Ridge National Laboratory (ORNL)
|
CX-K25-561 |
EM |
01/06/2011 |
Installation of MAXLAB Geothermal System at Oak Ridge National Laboratory (ORNL) |
CX-3618X |
SC |
03/03/2011 |
IMAGINE Neutron Instrumentation Project at Oak Ridge National Laboratory (ORNL) |
CX-3641X |
SC |
04/19/2011 |
Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) |
CX-TWPC-11-0001 |
EM |
06/30/2011 |
Modification of the Multi-Purpose Building (MPB) to Facilitate Storing Low-Level, Mixed Low Level and Transuranic Waste at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Oak Ridge, Tennessee |
CX-TWPC-11-0002 |
EM |
07/15/2011 |
Off-Site Solar-assisted Electrical Vehicle Charging Stations |
CX-3655X |
SC |
07/29/2011 |
Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Lenoir City, Tennessee (amended) |
CX-TWPC-11-0001A |
EM |
09/23/2011 |
ETTP Airport Feasibility Study |
CX-K25-562 |
EM
|
10/21/2011
|
Solar-assisted, Electrical Vehicle Charging Stations in Nashville, Tennessee
|
CX-3662X
|
SC
|
12/01/2011
|
Solar-assisted, Electrical Vehicle Charging Stations in Nashville, Tennessee
|
CX-3686X
|
SC
|
11/28/2011 |
Next-Generation Ecosystem Experiments in the Vicinity of Barrow and Council, Alaska |
CX-3656X |
SC |
03/05/2012
|
Clinch River Environmental Studies Organization (CRESO) 2012 Education/Research Program Activities
|
CX-CRESO-2012-001
|
ORR
|
03/30/2012
|
Clinch River Environmental Studies Organization (CRESO) Partners Wetland Project
|
CX-CRESO-2012-002
|
ORR
|
08/28/2012 |
Deactivation and Demolition of ORNL Buildings 3546 and 3606 |
CX-3703X |
SC |
10/24/2012 |
Building 9714 Extension of Concrete Apron |
CX-ORR-13-001 |
OST |
11/05/2012 |
Central Training Facility and Office of Secure Transportation Fence Line Maintenance |
CX-ORR-12-001 |
ORR |
11/19/2012 |
Ventilation Activities |
CX-GEN-001 |
ORR |
11/19/2012 |
Removing Items or Materials Containing Polychlorinated Biphenyls (PCBs) |
CX-GEN-002 |
ORR |
11/19/2012 |
Replacement, Removal, and Closure of Underground Storage Tanks (USTs) |
CX-GEN-003 |
ORR |
11/19/2012 |
Site Characterization, Investigation, and Environmental Monitoring Activities |
CX-GEN-004 |
ORR |
11/19/2012 |
Communications, Computing, and Data Processing Activities |
CX-GEN-005 |
ORR |
11/19/2012 |
Dike Construction and Modifications |
CX-GEN-006 |
ORR |
11/19/2012 |
Personnel Safety Enhancements |
CX-GEN-007 |
ORR |
11/19/2012 |
Asbestos Abatement Actions |
CX-GEN-008 |
ORR |
11/19/2012 |
Training Exercises and Simulation Projects |
CX-GEN-009 |
ORR |
11/19/2012 |
Fire Protection Upgrades |
CX-GEN-010 |
ORR |
11/19/2012 |
Maintenance Activities |
CX-GEN-011 |
ORR |
11/19/2012 |
Alterations to Existing Buildings, Construction of Small-Scale Support Structures, and Relocation of Machinery and Equipment |
CX-GEN-012 |
ORR |
11/19/2012 |
Waste Minimization and Reuse |
CX-GEN-013 |
ORR |
11/19/2012 |
Analytical Services and Development Support Activities |
CX-GEN-014 |
ORR |
11/19/2012 |
Cooperative Research and Development Agreement (CRADA) Activities |
CX-GEN-015 |
ORR |
11/19/2012 |
Deactivation of Facilities |
CX-GEN-016 |
ORR |
11/19/2012 |
Closure Activities Under the Resource Conservation and Recovery Act (RCRA) |
CX-GEN-017 |
ORR |
12/18/2012
|
CRESO Partners Wetland Project
|
CX-CRESO-2012-002
|
ORR
|
12/18/2012
|
Maintenance/Clearing of Vegetation by Office of Secure Transportation (OST) |
CX-ORR-13-002
|
OST
|
* Implicit in CX determinations are the following:
1. There are no extraordinary circumstances related to the proposed action that may affect the significance of the environmental effects of the proposed action
2. The proposed action is not “connected” to other actions with potentially significant impacts
3. The proposed action is not related to other proposed actions with cumulatively significant impacts
4. The proposed action is not precluded by 40 CFR 1506.1 or 10 CFR 1021.211.