Campus Facility Update
  Overview
 
Return to Campus Facility Update Home Button
Masterplan Button
OMCT History Button
Demolition Button
Construction Button
Gallery Button
EAD Webcam Button
PD Webcam Button


Billboard in front of construction zone

July 27
August 26, 2009 - The exterior walls start going up. (click on images to enlarge)

To accommodate our growing student body and expand our capabilities to meet the health care needs of our community, the UNT Health Science Center will add more than 300,000 square feet of floorspace to its campus over the coming years. The first step in the Health Science Center’s phased five-year plan -- the 112,000-square-foot Building A on the former Osteopathic Medical Center of Texas site -- will take our legacy of innovation to an entirely new level.

Demolition on the former Osteopathic Medical Center of Texas was completed in mid-August, and the foundation for the new building is underway. It’s scheduled to be completed and ready for use in January 2010.

Building A will feature:

  • Two 250-seat auditorium-style classrooms that can be joined into one 500-seat space, with state-of-the-art audio and visual equipment
  • Size-flexible conference and meeting facilities on the first floor, which will allow for groups as small as 25, but can also be expanded to hold larger events
  • A small café-style eating area
  • Additional classroom and meeting space, separated from the auditorium by a 35-foot atrium
  • A large osteopathic manipulative medicine training room
  • A new, state-of-the-art patient simulator training facility
  • Office space for our growing faculty

Construction imageConstruction imageConstruction image

construction hook
  UNTHSC logo Search | Work for Us | Vendor Info | Useful Links | Legal | Groupwise | my HSC
For technical problems contact the webmaster.
© 2008, University of North Texas Health Science Center at Fort Worth,
3500 Camp Bowie Blvd., Fort Worth, Texas 76107, (817)735-2000.