New Pipeline Construction Reports

New pipeline construction reports are required by 16 TAC §8.115 "New Construction Commencement Report".  Generally, the required form PS-48 only pertains to transmission lines, or gathering lines inside a Class 2, 3 or 4 location, and is due 30 days before construction begins.  (They are also used for sour gas line 24 hour notice).  

NOTE:  PS-48's should be sent to the attention of Safety Division, Pipeline Permitting section.