New Pipeline Construction Reports
New pipeline construction reports are required by 16 TAC §8.115 "New Construction Commencement Report". Generally, the required form PS-48 only pertains to transmission lines, or gathering lines inside a Class 2, 3 or 4 location, and is due 30 days before construction begins. (They are also used for sour gas line 24 hour notice).
NOTE: PS-48's should be sent to the attention of Safety Division, Pipeline Permitting section.