Site Search
Click to Home
Right-of-Way/TxDOT Review
Right of Way
Properties being subdivided in the City or ETJ may be required to provide dedication of right-of-way for future road expansion or construction. The right-of-way width required is determined by the type of road planned for the area and may either be a City, County, or TxDOT (state) road. Especially for large projects, please discuss the concept plan with the Planning Department prior to submittal to determine whether a dedication will be required.

For future TxDOT roads, please also contact the New Braunfels TxDOT office for right-of-way widths. An approved City Thoroughfare Plan, including TxDOT roads for Comal and Guadalupe Counties, is available on this website under Planning.

TxDOT Review
Proposed plats which front TxDOT right-of-way (IH 35, SH 46, Business 35, FM 1101, FM 306, Loop 337, etc.) will also be reviewed by TxDOT. It is recommended to discuss the plat with TxDOT before submitting to the City. TxDOT will review for items such as number of driveway access points, drainage, and provide standard required notes. It is highly recommended to submit the TxDOT permit with the subdivision master plan or plat application to allow for proper platting and minimize the need for revisions.

New Braunfels TxDOT office (830) 609-0707

The Official Website of New Braunfels, TX · 424 South Castell Ave. · New Braunfels, TX 78130 · Ph: (830) 221-4000 · Fax: (830) 608-2109
Employee Intranet | Accessibility | Sitemap | Powered by CivicPlus | Copyright Notices