skip to main content Public Utility Commission of Texas   Electric Division
ELECTRIC
 |  Home  |  Site Map  |  Search  |  Contact Us  |  Help  |         
 

Electric Reports

General Reports
Description / View Download
Cost-Benefit Analysis of the Deployment of Utility Infrastructure Upgrades and Storm Hardening Programs (pdf *)
March 2009
Scope of Competition in the Electric Markets of Texas
January 2009
Combined Heat and Power in Texas (pdf *)
December 10, 2008
Assessment of the Feasible and Achievable Levels of Electricity Savings from Investor Owned Utilities in Texas: 2009-2018 (pdf *)
December 23, 2008
2008 Report on the Cost and Benefits of Transition to ERCOT Nodal Market
December 2008
Need for Transmission and Generation Capacity in Texas; Renewable Energy Implementation and Costs
December 2006
Analysis of Residential Customer Switching by ZIP Code
2005
Independent Audit of Texas Energy Efficiency Programs in 2003 & 2004 - Final Report (pdf *)
ERCOT Transmission Constraint Relief Projects (pdf *)
June 2003
Fuel Cell Commercialization: Staff White Paper (pdf *)
This white paper, included as Appendix 6 of the Commission''s report to the Legislature on the scope of competition in electric markets in Texas, contains commission staff's recommendation on fuel cell commercialization.
Electric Restructuring and Air Quality Report
CFE/ERCOT Interconnection Study
- December 2003
mi_report.doc
Summary of System Benefit Fund Discounts (pdf *)
- Effective January 1, 2002
SBFCalculations.xls
Staff Report: PUC Investigation of Methods to Improve Electric and Telecommunications Infrastructure to Minimize Long Term Outages and Restoration Costs Associated with Gulf Coast Hurricanes, Project No. 32182(pdf *)
 

Recurring Reports
Description / View Download
Annual Service Quality Report
Electric Utility Rate Comparisons
Monthly Comparisons
ERCOT Market Reports
Fuel Reports
Monthly Reports
Historical Interest Rates on Customer Deposits & Over/Underbillings (pdf *)
The Commission annually sets interest rates on customer deposits and over- and underbillings. PUC Substantive Rules 25.24(g) and 25.28(c)&(d) contain the provisions relating to the payment of interest on customer deposits and over/underbillings, respectively. The Commission resets the interest rates on December 1 of each year.
HistRates.doc
Monthly Construction Progress Report
New Electric Generating Plants in Texas
Report Cards on Retail Competition and Summary of Market Share Data

Last Updated: 03/03/09

* PDF files require the use of the Adobe Acrobat Reader. Down load a free copy here.