Contracted
Report
0704830699
Region N, Coastal Bend 2011 Regional Water Plan Region-Specific Studies
Nueces River Authority
April 2009
- Study 1 Evaluation of Additional Potential Regional Water Supplies for Delivery through the Mary Rhodes Pipeline, Inlcuding Gulf Coast Groundwater and Garwood Project
- Study 2 Optimization and Implementation Studies for Off-Channel Reservoir
- Study 3 Implementation Analyses for Pipeline from CCR to LCC, Including Channel Loss Study Downstream of Choke Canyon Reservoir
- Study 4 Water Quality Modeling of Regional Water Supply System to Enhance Water Quality and Improve Industrial Water Conservation
- Study 5 Region-Specific Water Conservation Best Management Practices (BMPs)
|