Fermi National Laboratory


2009 Accelerator Update Archive

December 18, 2009 - December 21, 2009
The integrated luminosity for the period from 12/14/09 to 12/21/09 was 51.27 inverse picobarns.
NuMI reported receiving 6.38E18 protons on target during this same period.

- Four stores provided ~62.25 hours of luminosity
- Store 7444 had an AIL of 306E30
- BRF19 cavity suffered a vacuum failure and was removed
- The Booster West Anode Power Supply suffered some problems

December 16, 2009 - December 18, 2009
- Three stores provided ~45 hours of luminosity
- PBar kicker problem
- MI RF problems

December 14, 2009 - December 16, 2009
- Four stores provided ~42 hours of luminosity
- Recycler kicker repaired
- Booster East Anode Power Supply trips due to BRF1, 2, & 8

December 11, 2009 - December 14, 2009
- Two stores provided ~64.5 hours of luminosity
- Pelletron accessed and repaired
- Multiwires installed in MI-8 transfer line
- MI abort kicker problems
- Meson MT5E magnet installed

December 9, 2009 - December 11, 2009
- Four stores provided ~10.25 hours of luminosity
- Store #7423 aborted due to a LCW valve failure
- Store #7424 aborted due to cryo system power outage
- The TeV sector C4 LCW tripped off due to another valve problem
- The Pelletron suffered many discharges

December 7, 2009 - December 9, 2009
- Three stores provided ~44.25 hours of luminosity
- Ground-faulted magnet found in MTest beamline
- Booster ICW leak repairs
- Booster kicker problem repaired
- LRF2 problems resolved

December 4, 2009 - December 7, 2009
The integrated luminosity for the period from 11/30/09 to 12/7/09 was 49.6 inverse picobarns. NuMI reported receiving 6.65E18 protons on target for the same period.
- Six stores provided ~64.5 hours of luminosity
- MTest magnet suffers possible ground fault
- NuMI and MiniBooNE reported good running

December 2, 2009 - December 4, 2009
- Three stores provided ~45 hours of luminosity
- Recycler vacuum problem fixed
- MI kicker trips resolved

November 30, 2009 - December 2, 2009
- Four stores provide ~27.75 hours of luminosity
- Store 7407 quenched
- MTest experiment T992 begins taking beam
- Wednesday morning accesses and necessary repairs

November 25, 2009 - November 30, 2009
The integrated luminosity for the period from 11/23/09 to 11/30/09 was 46.57 inverse picobarns. NuMI reported receiving 7.6E14 protons on target during this same period.
- Seven stores provide ~83.25 hours of luminosity
- TeV quench during shot setup
- MI LCW ran without CUB due to regulation problems
- TeV dipole cause problems for CDF and D0
- Pelletron read-back problems held off stashing for short time
- MIRF2 developed LCW leak
- P1 transfer line suffered from vacuum burst
- RF personnel helped Operators bring BRF9 online
- NuMI and MiniBooNE reported good running

November 23, 2009 - November 25, 2009
- Three stores provided ~44.25 hours of luminosity
- LRF5 problems resolved
- MI-52 kicker power supply fixed
- Happy Thanksgiving

November 20, 2009 - November 23, 2009
The integrated luminosity for the period from 11/16/09 to 11/23/09 was 330.16 inverse pico barns. The total NuMI beam sum for this same time period was 6.21E14.
- Five stores provided ~ 32.75 hours of luminosity
- LRF4 and BRF9 repaired
- MI-40 abort kicker repaired
- Store 7373 aborted
- Pelletron high voltage regulation problems
- TeV quench at sector A4 during shot setup

November 18, 2009 - November 20, 2009
- One store provided ~29 hours of luminosity
- TeV sector A2 cryo leads repaired
- TeV sector A1 dipole magnet aligned
- Cryo controls power supply failure delays shot setup
- H- Source extractor repaired

November 16, 2009 - November 18, 2009
- Two stores provided ~25 hours of luminosity
- TeV sector A2 power lead problems
- P1 transfer line power supply failure
- NuMI record for protons on target set

November 13, 2009 - November 16, 2009
The integrated luminosity for the period from 11/9/09 to 11/16/09 was 51.07 inverse pico barns.
- Fours stores provided ~ 43.25 hours of luminosity
- CDF required an access to repair equipment
- LRF5 filament repaired
- Recycler beam valve closure caused loss of stash

November 11, 2009 - November 13, 2009
- Three stores provided ~31.75 hours of luminosity
- Tevatron quench
- NuMI lambertson (LAM61) failed
- MI Lambertson (LAM42) failed

November 9, 2009 - November 11, 2009
- Three stores provided ~35.5 hours of luminosity
- H- Source vacuum pump repaired
- Controls finds bad Pbar repeater
- NuMI intensity lowered
- MI Lambertson (LAM42) failed

November 6, 2009 - November 9, 2009
- Five stores provided ~58.75 hour of luminosity
- 400 MeV chopper tube replaced
- LRF3 LCW leak repaired
- TeV quenched at A4 during shot setup

November 4, 2009 - November 6, 2009
- Four stores provided ~38.5 hours of luminosity
- NuMI, Booster, and MI accesses
- Pbar lithium lens trips
- Store 7323 aborted
- Booster chopper problems
- LRF3 developed LCW leak

November 2, 2009 - November 4, 2009
- Four stores provided ~42.5 hours of luminosity
- MTA conducted timeline studies
- Cryo installed new lead flow valve at A2
- MI conducted slipstacking studies
- H- Source water skid work completed
- Recycler access to check vacuum today

October 30, 2009 - November 2, 2009
The integrated luminosity for the period from 10/26/09 to 11/2/09 was 45.48 inverse pico barns.
- Five stores provided ~ 48.25 hours of luminosity
- MI-52 affected by humidity
- TeV crystal collimator studies
- H- Source out drop corrected
- Store 7307 aborted
- TeV quench during shot setup
- Pelletron failure required access and repairs
- MI vacuum front end problem discovered

October 28, 2009 - October 30, 2009
- Four stores provided ~28.25 hours of luminosity
- FESS cleaned RF pond water strainer
- MI vacuum system rebooted
- TeV sector A4 cryo system lost control power
- CAMAC front ends and TCLK required reboot

October 26, 2009 - October 28, 2009
- Three stores provided ~42 hours of luminosity
- FESS cleans TeV sector F0 pond water strainer
- CDF luminosity counter calibrated

October 23, 2009 - October 26, 2009
- Five stores provided ~57.5 hours of luminosity
- FESS cleaned the F0 pond water strainer
- P1 transfer line trips due to power supply
- Pbar autotune program rebooted

October 21, 2009 - October 23, 2009
- Three stores provided ~43.25 hour so luminosity
- Linac flushed the I- Source water resistor
- Switchyard personnel established beam to the MTest area
- Power supply caused NuMI beam permit trips

October 19, 2009 - October 21, 2009
- Three stores provided ~37 hours of luminosity
- TeV power supply (D0Q2) leak repaired
- Linac front end replaced

October 16, 2009 - October 19, 2009
- Three stores provided ~49 hour so luminosity
- Beam successfully sent to the Switchyard dump
- TeV quench during shot setup

October 14, 2009 - October 16, 2009
- Three stores provided ~40 hours of luminosity
- Switchyard and MI personnel conducted MI-52 septa studies
- Store 7270 quenched

October 12, 2009 - October 14, 2009
- Three stores provided ~35.5 hours of luminosity
- TeV studies
- Two hour access on Wednesday morning for Booster, MI, NuMI, and MiniBooNE

October 9, 2009 - October 12, 2009
The integrated luminosity for the period from 10/5/09 to 10/12/09 was 45.03 inverse pico barns.
- Five stores provided ~56.75 hours of luminosity
- Linac power supply problems
- Booster power supply problems

October 7, 2009 - October 9, 2009
- Four stores provided ~ 41.75 hours of luminosity
- Linac output problems

October 5, 2009 - October 7, 2009
- Two stores provided ~25.75 hours of luminosity
- Tevatron cyro and vacuum problems
- Tevatron B48 separator power proble

October 2, 2009 - October 5, 2009
The integrated luminosity for the period from 9/28/09 to 10/4/09 was 40.73 inverse pico barns.
- Three stores provided ~51.5 hours of luminosity
- Three TeV quenches during shot setup
- Power supply repairs held off NuMI
- Accumulator magnet LCW leak
- NuMI horn trips
- Backup helium compressor brought online

September 30, 2009 - October 2, 2009
- One store provided ~11.5 hours of luminosity
- TeV quadrupole power supply work completed
- NTF bend magnet power supply replaced
- The TeV quenched with no store
- TeV sector C4 Kautzky valve replaced

September 28, 2009 - September 30, 2009
- Four stores provided ~ 29.5 hours of luminosity
- Trouble with TeV quadrupole power supplies
- NuMI switched to anti-neutrino mode
- Store 7226 aborted

September 25, 2009 - September 28, 2009
The integrated luminosity for the period from 9/21 to 9/17 was 27.1 inverse pico barns.
- Three store provided !20.25 hours of luminosity
- Store 7209 aborted
- TeV sector F1 quench due to kicker trip
- Booster found problem with sextupole ramp
- Recycler stashed 454E10 or antiprotons
- TeV RF APS repaired

September 23, 2009 - September 25, 2009
- Four stores provided ~ 26.5 hours of luminosity
- MI vacuum leak repaired
- MI-52 kicker problems due to humidity
- Store 7206 aborted

September 21, 2009 - September 23, 2009
- Three stores provided ~35.25 hours of luminosity
- Pelletron turned off to fix controls, regulation, and CDC PLC problems
- MI-30 suffering from vacuum bursts
- MiniBooNE down for air conditioning work
- MI vacuum and septa problems require access

September 18, 2009 - September 21, 2009
The integrated luminosity for the period of 9/14/09 to 9/20/09 was 19.01 inverse pico barns.
- Six stores provided ~ 54.0 hours of luminosity
- MI-10 power supply PLC card replaced
- TeV quench at A1 and F4
- Operators replace TeV C1 HFU capacitor bank
- MiniBooNE off for HVAC work

September 16, 2009 - September 18, 2009
- Two stores provided ~21.75 hours of luminosity
- Booster notcher fixed
- NuMI kicker repaired
- MI-40 vacuum improving
- MiniBooNE beam will turn off on Monday morning for vacuum work

September 14, 2009 - September 16, 2009
- Store 7183 provided ~10 hours of luminosity
- Pbar stacked antiprotons
- Recycler stashed antiprotons
- NuMI horn trip
- Pbar cryo system problems halted stacking

September 11, 2009 - September 14, 2009
- Pbar began stacking
- Recycler stashes Antiprotons
- TeV startup progressing
- NuMI and MiniBooNE taking beam
- MI might access on Tuesday

September 9, 2009 - September 11, 2009
- MiniBooNE continues to take beam when available
- TeV safety system test completed
- Beam established to MI, Recycler and Pbar
- TeV and NuMI should receive beam on Friday

September 7, 2009 - September 9, 2009
- Pbar bake completed
- MI bake extended to Tuesday
- TeV cooldown continues
- Neutron Therapy Facility treating patients
- MI bake equipment will be pulled out on Wednesday

September 4, 2009 - September 7, 2009
- MiniBooNE taking beam
- TeV ground fault found
- Pbar bake completed
- MI bake continues
- TeV possibly cold Tuesday night, 9/7/09

August 28, 2009 - September 4, 2009
- Linac: Replaced attenuators and mixer for 750 KeV Line Buncher
- Booster: Tuning, improving efficiencies, and increasing beam intensity
- Pbar: Bake in progress for sectors A10, A50, and A60
- MI: Lambertson and beam pipe bake in progress
- TeV: Luminosity counter replaced at sector B0
- NuMI: Target hall work completed
- Cryo: 99.99% of all scheduled maintenance has been completed
- CDF: Detector has been closed
- D0: Ready for search and secure
- FESS: Chiller #3 work continues
- MiniBooNE: Taking beam
- Run Coordinator declares that the startup has begun

August 31, 2009 - September 2, 2009
- MI beam pipe repairs continue
- Pbar developed vacuum problem
- CUB Chiller #3 passed pressure test
- Beam to MiniBooNE today

August 28, 2009 - August 31, 2009
- Vacuum leak found on MI-40 Lambertson beam pipe
- Pbar critical devices interlocks checked
- MI hipotted
- MiniBooNE should begin taking beam 9/1/09

August 21, 2009 - August 28, 2009
- Linac: I- Source problems
- Booster: Running beam
- Pbar: Transitioning to startup
- MI: Lambertson vacuum leak
- Recycler: Failed components in Pelletron fixed
- TeV: D1 passed hipot
- NuMI: Have low intensity run plan
- Cryo: A1 heat exchangers plugged due to contamination
- FESS: Chiller #3 work continues
- Alignment: All work completed except MTA, D0, and Switchyard

August 14, 2009 - August 21, 2009
- Linac: 400 MeV beam to dump on 8/17/09
- Booster: Completed GMPS installation on Saturday
- Pbar: Accumulator kicker upgrade and Debuncher magnet replacement completed
- MI: All MI-40 kickers are in the tunnel
- Recycler: Power supplies, HLS installation, and six magnet moves all completed
- TeV: The "to do" list has gotten very small
- NuMI: Completed target survey
- Safety: Two recordable injuries, both minor

August 7, 2009 - August 14, 2009
- Linac: H- Operational
- Booster: GMPS work 95 percent complete
- Pbar: Kicker upgrade 95 percent complete
- MI: On schedule for beam on August 31st
- Recycler: should be able to close up the Pelletron by August 19th
- TEV: 10 of the 12 bad stands have been replaced
- Safety: Two back strains in the past week

July 31, 2009 - August 7, 2009
- Linac: Painting I- Source room
- Booster: Repair leaks in East Gallery LCW system
- Pbar: kicker tanks developed internal electrical problem
- MI: eCloud components ready for installation
- Recycler: ECool on track for 8/19/09 startup
- TeV: working two shifts
- NuMI: Hadron monitor fixture installed
- Controls: AD Network isolation test on 8/6/09
- FESS: Kautz Rd bus duct cleaning
- Safety: No injuries reported

July 24, 2009 - July 31, 2009
- Linac: Painting I- Source room
- Booster: Repair leaks in East Gallery LCW system
- Pbar: kicker tanks developed internal electrical problem
- MI: eCloud components ready for installation
- Recycler: ECool on track for 8/19/09 startup
- TeV: working two shifts
- NuMI: Hadron monitor fixture installed
- Controls: AD Network isolation test on 8/6/09
- FESS: Kautz Rd bus duct cleaning
- Safety: No injuries reported

July 17, 2009 - July 24, 2009
- Preaccelerator: New source and generator for H-
- Booster: All correction 36 magnets installed
- Pbar: Debuncher septum magnet repaired and passed hipot
- MI: MI-10 backfill nearly complete
- Recycler: Pelletron maintenance 50% complete
- TeV: Crystal collimator bake out nearly complete
- NuMI: Installed backup pumps and sumps for pre-target drains
- Cryogenics: Repair of 22 engines completed
- Controls: Prep for weekend control system outage due to power outage
- FESS: Casey's pond shut down on Saturday for Zebra Mussel inspection
- Safety: One injury requiring first aid

July 10, 2009 - July 17, 2009
- Proton Source GMPS upgrade 90% complete
- Pbar kicker upgrade 70% complete
- Main Injector - all cores bored in MI-10 and MI-40
- Recycler Pelletron maintenance 30% complete
- Tevatron magnet unrolls 80% complete
- NuMI horn LCW leak repair completed
- Cryo System - warming TeV sector F3 to room temperature
- Controls installed the MTA switch-box
- MTA has completed the shield work
- MSS - all work completed
- Safety - no injuries reported

June 29, 2009 - July 10, 2009
- H- Source dome cleaning in progress
- Correction element upgrade 80% complete
- Accumulator kicker upgrade 50% complete
- Pelletron maintenance 20% complete
- Tevatron has six houses to fix
- NuMI completed investigation of horn cooling leak
- Alignment has completed 456 survey
- Safety has had no shutdown related injury for this time period

June 19, 2009 - June 26, 2009
- Shutdown report

June 15, 2009 - June 19, 2009
First five days of shutdown.
- NTF treats patients
- Pbar - power was off on Thursday
- Linac, NTF, and Electron cooling personnel conduct studies

June 12, 2009 - June 15, 2009
The integrated luminosity for the period from 6/8/09 to 6/15/09 was 50.64 inverse pico barns.
- Two stores provided ~32.75 hours of luminosity
- Machine personnel conduct last minutes studies
- Pbar lithium lens trip
- ES&H and Operations personnel prepare areas for access
- Shutdown begins

June 10, 2009 - June 12, 2009
- Three stores provided ~39.5 hours of luminosity
- Booster GMPS brought online
- MiniBooNE off ahead of shutdown
- Machine experts conducting last minute studies
- Shutdown begins 6/15/09 at 8 AM

June 8, 2009 - June 10, 2009
- Four stores provided ~38.25 hours of luminosity
- Booster power supply (GMPS) work continues
- Machine studies

June 5, 2009 - June 8, 2009
The integrated luminosity for the period from 6/1/09 to 6/8/09 was 45.62 inverse pico barns.
- Four stores provided ~36.25 hours of luminosity
- Store 7119 aborted due to TeV power supply LCW leak
- Pbar held off for Debuncher power supply LCW leak repair

June 3, 2009 - June 5, 2009
- Four stores provided ~29.5 hours of luminosity
- Pelletron come back online
- Store 7106 lost due to abort
- Store 7109 terminated due to air compressor trip
- TeV quench with no store

June 1, 2009 - June 3, 2009
- Two stores provided ~46 hours of luminosity
- Pelletron developed high voltage problems
- Pbar dry engine flywheel repaired
- MTest T979 experiment ends current run

May 29, 2009 - June 1, 2009
The integrated luminosity for the period from 5/25/09 to 6/1/09 was 51.59 inverse pico barns
- Four stores provided ~37.5 hours of luminosity
- H- Source problems fixed
- Store 7097 quenched at B0
- TeV suffered a D0 quench with no beam
- TeV C4 wet engine valve replaced

May 27, 2009 - May 29, 2009
- Three stores provided ~ 25 hours and 15 minutes of luminosity
- Linac extraction power supply problems
- Tevatron Fiber Abort Repeater problems

May 25, 2009 - May 27, 2009
- Three stores provided ~36.5 hours of luminosity
- TeV quench at D0

May 22, 2009 - May 25, 2009
The integrated luminosity from 5/18/ to 5/25 was 32.5 inverse pico barns.
- Fours stores provided ~56.25 hours of luminosity
- MiniBooNE air conditioning problems fixed
- H- Source brought online

May 20, 2009 - May 22, 2009
- Two stores provided ~7.25 hours of luminosity
- MI-42 quadrupole magnet replaced

May 18, 2009 - May 20, 2009
- Three stores provided ~18.75 hours of luminosity
- Quadrupole magnet replaced at MI-42
- D0 required 8-hour access for necessary repairs
- TeV quench during shot setup

May 15, 2009 - May 18, 2009
The integrated luminosity for the period of 5/11/09 to 5/18/09 was 58.04 inverse pico barns.
- Four stores provided ~67 hours of luminosity
- Pbar Debuncher injector kicker repaired
- Meson M01 LCW trips trouble MTest
- MI Quadrupole magnet suffered ground fault

May 13, 2009 - May 15, 2009
- Three stores provided ~25.75 hours of luminosity
- MTest shut off due to LCW leak and power outage
- TeV quench during shot setup
- Linac personnel fix more LRF4 problems
- Recycler has bulk power supply trouble

May 11, 2009 - May 13, 2009
- Three stores provided 39.5 hours of luminosity
- LRF4 driver and switch tube replaced
- Recycler kicker trip
- Pbar Debuncher septum problems

May 8, 2009 - May 11, 2009
- Four store provided ~32.5 hours of luminosity
- TeV quench during shot setup
- LRF4 repaired
- B0 QPM communication problems resolved

May 6, 2009 - May 8, 2009
- Three stores provided ~ 31 hours and 30 minutes of luminosity
- Problems with Linac RF station 4
- Problems with Booster RF

May 4, 2009 - May 6, 2009
- Three stores provided ~ 41 hours and 30 minutes of luminosity
- Problems with Linac RF station
- Problems the NuMI dehumidifiers

May 1, 2009 - May 4, 2009
- Five stores provided ~52 hours of luminosity
- Four hour access into TeV A-E
- Problems with the Klystron Debuncher

April 29, 2009 - May 1, 2009
- Fours stores provided ~43 hours of luminosity
- Pbar suffered transfer sequencer problems
- 5/1/09 - 4 PM, four hour access into TeV A-E

April 27, 2009 - April 29, 2009
- Four stores provided ~ 38.5 hours of luminosity
- NuMI autotune problems
- Tuesday day shift accesses for maintenance

April 24, 2009 - April 27, 2009
The integrated luminosity for the period from 4/20/09 to 4/27/09 was 47.42 inverse pico barns.
- Three stores provided ~9.5 hours of luminosity
- TeV quench and store 2997 lost due to cold box failure
- LRF2 repaired
- I- Source water resistor compression fitting repaired
- Recycler sets New Record Stash: 502.85E10
- Booster and MI will access on 4/28/09

April 22, 2009 - April 24, 2009
- Four stores provided ~44.5 hours of luminosity
- Recycler injector coolant pump repaired

April 20, 2009 - April 22, 2009
- Four stores provided ~40.25 hours of luminosity
- MI LCW tripped off
- Pbar controls crate power supply replaced

April 15, 2009 - April 17, 2009
- Four stores provided ~44.5 hours of luminosity
- Meson MTest experiment T971 begins taking beam
- Helium transfer line pressure drop stabilized

April 13, 2009 - April 15, 2009
- Three stores provided ~41.75 hours of luminosity
- LRF3 LCW leak fixed
- Accumulator bend bus power supply repaired
- Pbar Debuncher and Accumulator energy mismatch corrected

April 10, 2009 - April 13, 2009
The integrated luminosity from 4/6/09 to 4/13/09 was 27.08 inverse pico barns.
- Five stores provided ~ 48 hours of luminosity
- Accumulator bend bus power supply ground fault trips
- Store 6966 aborted

April 8, 2009 - April 10, 2009
- There were no stores due to a TeV cold box turbine failure
- Accelerators conducted maintenance

April 6, 2009 - April 8, 2009
- There were no stores due to a TeV cold box turbine failure
- Accelerators conducted maintenance

April 3, 2009 - April 6, 2009
The integrated luminosity for 3/30/09 to 4/6/09 was approximately 56.72 inverse pico barns
- Two stores provided ~30.25 hours of luminosity
- CHL cold box #2 turbine failed
- Pbar lithium lens failed

April 1, 2009 - April 3, 2009
- Four stores provided ~37.75 hours of luminosity
- CUB column #1 regenerated
- TeV horizontal collimation beam orbit changed

March 30, 2009 - April 1, 2009
- Four stores provided ~37.25 hours of luminosity
- No MI QF bus ground fault found
- Recycler set record stash size, 477.2E10

March 27, 2009 - March 30, 2009
- Four stores provided ~50 hours of luminosity
- Experts search for high field ground fault in MI
- TeV quench during shot setup
- TeV abort during shot setup
- Booster vacuum leak found and repaired

March 25, 2009 - March 27, 2009
- Four stores provided ~39 hours of luminosity
- FESS repairs Booster West chilled water system

March 23, 2009 - March 25, 2009
- Five stores provided ~29 hours of luminosity
- Booster West Anode Power Supply caused RF sparking
- Two TeV aborts; power supply fixed
- P1 transfer line vacuum cascade

March 20, 2009 - March 23, 2009
- Four stores provided ~46.5 hours of luminosity
- Booster ground fault fixed (BRF8)
- TeV ground fault fixed (D0Q2)
- TeV power supply repaired (QFA4)
- 400 MeV area tuned
The integrated luminosity for the period from 3/16/09 to 3/23/09 was 60.34 inverse pico barns.

March 18, 2009 - March 20, 2009
- Three stores provided ~37.25 hours of luminosity
- Vacuum experts access TeV
- Linac and Booster experts access and conduct maintenance
- FESS finds chilled water leak
- Booster off for MP03 repairs

March 16, 2009 - March 18, 2009
- Three stores provided ~43.25 hours of luminosity
- MTest experiment T988 ends and T971 begins
- NuMI condensation tank level fixed
- Recycler suffers from vacuum burst

March 13, 2009 - March 16, 2009
- Four stores provided ~39.75 hours of luminosity
- A D0 power glitch quenched the TeV; store 6891 was lost
- Pbar Lithium lens replaced
The integrated luminosity from 3/9/09 to 3/16/09 was 54.36 inverse picobarns.

March 11, 2009 - March 13, 2009
- Four stores provided ~41 hours of luminosity
- Pbar power supplies get repaired
- Linac quadrupole power supplies get repaired
- MTest T988 experiment takes beam

March 9, 2009 - March 11, 2009
- Three stores provided ~31 hours of luminosity
- Pbar power supply A:IB making lots of noise
- Problems with Linac quadrupole power supplies
- Cryo system experts busy with maintenance

March 6, 2009 - March 9, 2009
- Two stores provided ~33 hours of luminosity
- Accelerators recovered form Kautz Rd power glitch
- Linac resolves quadrupole power supply problems
- Linac switched to I- Source
- Lightning strike trips off equipment and loss of stash
- Main contactor for TeV power supply repaired
- Pbar fixes optical receiver at AP50
- TeV quench during shot setup

March 4, 2009 - March 6, 2009
- Two stores provided ~34.75 hours of luminosity
- TeV recovers from Tuesday night quench
- TeV sector A2 LCW leak repaired
- Linac quadrupole power supply problems
- Booster RF sparking problems resolved
- TeV quenches twice during Friday midnight shift

March 2, 2009 - March 4, 2009
- Three stores provided ~28 hours of luminosity
- Booster LCW pump at CUB trip
- NTF treatment resumed after power supply replaced
- TeV quench during shot setup

February 27, 2009 - March 2, 2009
- Three stores provided ~35 hours of luminosity
- Complex recovers from Kautz Rd power glitch
- Booster suffers from RF trips

February 25, 2009 - February 27, 2009
- Three stores provided ~31.75 hours of luminosity
- The Kautz Rd substation tripped off on a ComEd power glitch
- Store 6834 aborted and the stash was lost
- The TeV quenched
- Experts have been working since Thursday evening to bring the complex back up

February 23, 2009 - February 25, 2009
- Three stores provided ~26.5 hours of luminosity
- MI damper problem found and fixed
- H- source brought online
- TeV quench - store 6829 lost

February 20, 2009 - February 23, 2009
The integrated luminosity for 2/16/09 to 2/23/09 was 65.24 inverse pico barns.
- Four stores provided ~55 hours of luminosity
- Accumulator kicker and TWT problems fixed
- TeV sector A3 vacuum pump tripped off

February 18, 2009 - February 20, 2009
- Tev quench during shot setup
- Pbar access for target change

February 16, 2009 - February 18, 2009
- Three stores provided ~42.75 hours of luminosity
- MI suffered vacuum burst
- One transfer of antiprotons lost due to timing problem
- On Thursday Pbar will install new target

February 13, 2009 - February 16, 2009
- Two stores provided ~9 hours of luminosity
- New transformer connected
- More TeV dump switch damage discovered
- TeV quench
- MI vacuum burst

February 11, 2009 - February 13, 2009
- Cross Gallery transformer failure
- Loss of power caused loss of MCR controls
- TeV dump switches were damaged
- Pbar bendbus power supply cable suffered ground fault
- New transformer staged for connection

February 9, 2009 - February 11, 2009
- Three stores provided ~31.25 hours of luminosity
- Accumulator power supply LCW leak repaired
- Cross Gallery, MCR, Computer Room transformer failed
- Store 6792 and stash lost
- The TeV suffered a 6-house quench
- The complex is down until at least Thursday afternoon (2/12/09)

February 6, 2009 - February 9, 2009
- Four stores provided ~54.0 hours of luminosity
- Booster RF and Kicker problems resolved
- TeV sector F4 LCW pump trips - backup pump brought online
- Ice slows replacement of Booster beam detector

February 4, 2009 - February 6, 2009
- Three stores provided ~19 hours of luminosity.
- Two Tevatron quenches.
- Rf problems in Linac and Booster.

February 2, 2009 - February 4, 2009
- Three stores provided ~39.75 hours of luminosity
- Booster Chopper problems

January 30, 2009 - February 2, 2009
- Five stores provided ~65.75 hours of luminosity
- Booster Chopper problems
- Very good weekend for luminosity

January 28, 2009 - January 30, 2009
- Three stores provided ~35.25 hours of luminosity
- Main Injector kicker problems
- Linac RF station trip

January 26, 2009 - January 28, 2009
- Three stores provided ~38.25 hours of luminosity
- Tevatron Electron Lens #2 trips
- Two Recycler damper trips cause the loss of ~250E10 antiprotons

January 23, 2009 - January 26, 2009
- Four stores provided ~62.5 hours of luminosity
- MI kicker problems fixed
- Controls experts resolved MI TCLK problems
- MI LCW pump gasket fails
- Recycler stash lost when MI LCW tripped off
- Booster experts brought East and West Anode power supplies on after trips

January 21, 2009 - January 23, 2009
- Three stores provided ~50.75 hours of luminosity
- MI suffers from kicker problems
- Pelletron experts fix a software issue

January 19, 2009 - January 21, 2009
- Two stores provided ~22 hours of luminosity
- Tevatron Electron Lens controls problems cause TeV quenches
- MiniBooNE off due to sump pump failure
- Recycler has VSA problems

January 16, 2009 - January 19, 2009
- Five stores provided ~50.75 hours of luminosity
- Linac discovered cause of velocity meter problems
- MI suffers from kicker prefire faults
- TeV ground fault found
- Booster had RF problems

January 12, 2009 - January 14, 2009
- Two stores provided ~22.5 hours of luminosity
- TeV store 6718 lost to quench
- Diagnostics installed on KRF5
- Linac suffers from dump vacuum problems

January 9, 2009 - January 12, 2009
- Five stores provided ~62 hours of luminosity
- store 6715: second highest with an initial luminosity of 359.45E30
- Pbar fixes two transfer switches that were hindering stacking
- TeV conducts coupling study
- Pelletron VME node problems

January 7, 2009 - January 9, 2009
- Three stores provided 34.25 hours of luminosity
- Failed amplifier causes Booster RF sparking
- Cryo system experts conduct TeV wet engine maintenance
- Pbar stacking rate drops due to bad PLC

January 5, 2009 - January 7, 2009
- Four stores provided ~34.5 hours of luminosity
- Cryo experts tightened the A3 wet engine belts
- Store 6706: third highest with a luminosity of 352.15E30

December 29, 2008 - January 5, 2009
- Seven stores provided ~124.25 hours of luminosity
- A3 harmonic filter repaired
- Pelletron VME problems continue
- Recycler and MI have kicker problems
- Store 6698 aborted due to C0 shunt trip
- Pbar water-skid LCW leak fixed
- Stash lost due to beam valve failure

The Integrated Luminosity for 12/29/08 to 1/5/09 was 56.04 Pb-1.

 


Acclerator Update Archive:
2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003

More Information
For Tevatron luminosity charts and the current status of Fermilab's accelerators and detectors (live!), please go to Fermilab Now

Comments and Suggestions
What do you think about the Accelerator Updates? Please send comments and suggestions to: accelupdates@fnal.gov.


Return to Current Accelerator Update

 
last modified 12/28/2011    email Fermilab