Updated: |
6/4/2008 |
Description: |
May direct, supervise, and engage in electrical work related to the testing repair, service, maintenance, installation or replacement of new or existing pump equipment for potable or irrigation water systems, sump pumps, effluent pumps and ground water pumps on residential and agricultural property. May make repairs or perform work on them without further license. Installations under this license shall be limited to branch circuit wiring provided from the load side of a disconnect means external to panel boards.
Similar Keywords: contractors, contracting, subcontractors, construction |
Statutes, Rules, Ordinances: |
ORS 479
OAR 918-282-0070
|
Duration: |
3 year cycle. Current cycle expires 7/1/2011 |
Fees - application, exam, etc.: |
$75.00 for Initial application and renewal. Application fees will not be prorated based on the date you apply. |
Responsible Agency: |
BCD - Electrical |
Examination Information: |
Examination is not required |
Continuing Ed Requirements: |
None required |
Bonding Requirements: |
As required by the CCB license |
Insurance Requirements: |
As required by the CCB license |
Prerequisites: |
- Provide and maintain a list of employees and designate an individual within the firm who will act as the signing supervisor which may be one of the following:
- General Supervising electrician, or
- General Journeyman electrician, or
- Qualified Person (QP); an individual who verifies 2000 hours (one year) of experience in residential pump installation, repair and maintenance.
- Register the business name with the Secretary of State.
- Hold an active Construction Contractor Board number.
- Employees of this contractor license need not to be licensed electricians
|
Application Form: |
Contractor / Business License Application |
Service Links: |
Application Process
Application Instructions Form 2888-A
Application Form 2888-B
Experience Verification form 2888-C
BCD Main License Search
Apply Online
Renew Online
Name Change Information
Change Address Online
Duplicate License Request
Agency Contact Information
|
Required Documentation: |
On Your application you will need
- business name(s) and the license number(s)of any BCD license(s)that you hold or have held.
- The signature of a signing supervisor(s) and their license number(s).
|
Additional Information: |
OAR 918-001-040(3)(a) - A person is not qualified to be licensed if false information is provided in an application. Persons denied licensing under this rule may not apply for any license within 12 months of the date of denial. |
|
|
Agency Information
|
Please refer to the Agency Website for further details and additional information.
|
Agency Name: |
BCD - Electrical |
E-mail Address: |
BCD.License@state.or.us
|
Phone: |
503-373-1268
|
Mail Address: |
DCBS - Building Codes Division PO BOX 14470
Salem, OR 97309
- 0404
|
Website Information: |
http://www.bcd.oregon.gov/programs/electrical.html |