Updated: |
5/1/2007 |
Description: |
For structures actively and exclusively used in receipt and discharge of merchandise, a Wharf Structure Registration Application must be approved.
Water related projects often require multiple permits. Please see Common Water Related Projects for information on other permits that may be required to accomplish your project. |
Statutes, Rules, Ordinances: |
OAR 141-082
|
Duration: |
5 years max., Government facilities 10 years max. |
Fees - application, exam, etc.: |
none |
Responsible Agency: |
DSL - Land Management Division |
Application Form: |
Wharf Structure Registration Application |
Service Links: |
Wharf Structure Registration Application
Agency Contact Information
|
Required Documentation: |
A. Full size assessor map (16 inches x 16 inches), scale: 1 inch = 100 feet, that contains the riparian uplands. Do not mark on this map. B. A copy of the current yearýs property tax statement, which identifies the present ownerýs name(s), land values, land size and tax account numbers of the riparian uplands. C. A separate drawing to a scale of 1 inch = 100 feet of all existing and proposed structures for the wharf registration area. Show the dimensions of the wharf each area by length and width. D. A street or highway location map with road directions to the site from the nearest main highway or road. E. Photo(s) of the existing structure or site of proposed structure. |
|
|
Agency Information
|
Please refer to the Agency Website for further details and additional information.
|
Agency Name: |
DSL - Land Management Division |
E-mail Address: |
dsl@dsl.state.or.us
|
Phone: |
503-986-5200
|
Mail Address: |
775 Summer St. NE Suite 100
Salem, OR 97301
- 1279
|
Website Information: |
http://www.oregonstatelands.us/ |