|
|||||||||||||||||||||||||||||||||||||
Water Quality |
|||||||||||||||||||||||||||||||||||||
Onsite Wastewater Management Program (Septic Systems) |
|||||||||||||||||||||||||||||||||||||
|
Approved Onsite Wastewater Treatment Products and Product Approval
Only those tank sizes and configurations that are listed on the
“List of Approved Tanks and Distribution Units” are approved for
installation currently.
The Department will conduct one review per tank application to
determine compliance with the applicable rules. After review, tank
plans and installation manuals requiring correction will be returned
to the manufacturer and engineer. All application materials returned
for correction must be re-submitted to the Department within 60 days
of notification. If there is a failure to correct all noted
deficiencies and/or the information requested is not submitted
within 60 days it will result in a new application fee assessment to
continue the approval process. Infiltrator EZ Flow ADS Alternative Treatment Technology (ATT) Products
-- IMPORTANT: Time of Transfer Inspections --After January 1, 2006, time of transfer inspections will be required for all Alternative Treatment Technologies (ATT) products. Time of sale inspections are not required for all onsite systems. However, DEQ and the Oregon Property Buyers Advisory developed by the Oregon Real Estate Agency recommends inspecting all onsite systems. Below is a copy of the rule, information on who can do an inspection, and the DEQ inspection form:
Add-on Treatment Units Lombardo Associates, Inc.
New or Innovative Technologies, Materials, or Designs for Onsite Systems |
||||||||||||||||||||||||||||||||||||
For more information about DEQ's Onsite Wastewater Management Program contact Lisa Fincher by phone at (541) 686-7905 or by e-mail.
|
|||||||||||||||||||||||||||||||||||||
Projects and Programs Publications and Forms Laws and Regulations Public Notices Permits and Licenses Databases |
|||||||||||||||||||||||||||||||||||||
About DEQ | Contact DEQ | Search | Feedback |