Full-Size Electric Vehicle Special Projects

Fleet Operations

The following documents are available as Adobe Acrobat PDFs. Download Adobe Reader.

  • National Loaner Program (PDF 168 KB)
  • Federal Fleet Use of Electric Vehicles (PDF 819 KB)
  • Federal Fleet Incremental Funding - March Status Report (PDF 228 KB)
  • Federal Fleet Incremental Funding - Final Report (PDF 596 KB)

Site Operations Program

  • Field Operations Program Activities Status Report - 1997 through mid-1999 (PDF 1.8 MB)
  • Site Operator Program Final Report for FY 1992-1996 (PDF 1.0 MB)
  • Site Operation Quarterly Report for 1st Quarter - 1996 (PDF 1.7 MB)
  • Site Operation Quarterly Report for 4th Quarter - 1995 (PDF 161 KB)
  • Site Operation Quarterly Report for 3rd Quarter - 1995 (PDF 65 KB)
  • Site Operation Quarterly Report for 2nd Quarter - 1995 (PDF 68 KB)
  • Site Operation Quarterly Report for 1st Quarter - 1995 (PDF 73 KB)
  • Site Operation Quarterly Report for 4th Quarter - 1994 (PDF 36 KB)
  • Site Operation Quarterly Report for 3rd Quarter - 1994 (PDF 34 KB)

Papers and Presentations

  • U.S. Department of Energy Field Operations Program, Electric and Hybrid Vehicle Testing, presented at SAE Future Car Congress, June 2002
  • U.S. Department of Energy Field Operations Program, Electric Vehicle Field Operations Program, presented at SAE Future Car Congress, April 2000
  • Electric Vehicle Fleet Operations in the United States, presented at 31st International Symposium on Automotive Technology and Automation, Dusseldorf, Germany, June 1998 (PDF 172 KB)
  • INL-Based FreedomCar & Vehicles Technologies Program Activities - Part A, presented at IMEAC, Portland, Oregon, June 2003 (PDF 7.8 MB)
  • June 2003 INL-Based FreedomCar & Vehicles Technologies Program Activities - Part B, presented at IMEAC, Portland, Oregon, June 2003 (PDF 8.7 MB)