THURSDAY, NOVEMBER 2, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
1) |
8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open) |
|
1.1) |
Opening statement
(DAP/JTL/HJL) |
1.2) |
Items of current interest
(DAP/NFD/HJL) |
1.3) |
Priorities for preparation
of ACRS reports
(DAP/JTL/HJL) |
2) |
8:35 - 10:45 A.M. |
Revised Report of the Final Technical Study of
Spent Fuel Pool Accident Risk at Decommissioning
Nuclear Power Plants (TSK/MME/MWW) |
|
2.1) |
Remarks by the
Subcommittee Chairman |
2.2) |
Briefing by and
discussions with
representatives of the
NRC staff regarding the
revised version of the
report and the staff's
response to previous
ACRS concerns. |
Representatives of the nuclear industry will provide
their views, as appropriate. |
10:45 - 11:00 A.M. |
***BREAK*** |
3) |
11:00 - 12:30 P.M. |
Risk-Informed Regulation Implementation Plan
(RIRIP) (Open)
(GA/MTM) |
|
3.1) |
Remarks by the
Subcommittee Chairman |
3.2) |
Briefing by and
discussions with
representatives of the
NRC staff regarding the
update to the RIRIP. |
Representatives of the nuclear industry will provide
their views, as appropriate. |
12:30 - 1:30 P.M. |
***LUNCH*** |
4) |
1:30 - 2:30 P.M. |
Proposed Framework for Risk-Informed Changes to
the Technical Requirements of 10 CFR Part 50
(Open) (GA/MTM) |
|
4.1) |
Remarks by the
Subcommittee Chairman |
4.2) |
Briefing by and
discussions with
representatives of the
NRC staff regarding the
proposed NRC
framework for risk-informed changes to the
technical requirements of
10 CFR Part 50 described
in Attachment 1 to
SECY-00-0198. |
Representatives of the nuclear industry will provide
their views, as appropriate. |
5) |
2:30 - 4:30 P.M. |
Differing Professional Opinion (DPO) on Steam
Generator Tube Integrity (Open) (DAP/SD/US) |
|
5.1) |
Report by the Chairman
of the Ad Hoc
Subcommittee on DPO
Issues regarding the
outcome of the October
10-14 subcommittee
meeting, proposed
subcommittee
recommendations,
schedule for completing
the review, and related
matters. |
5.2) |
Briefing by and
discussions with the DPO
author and representatives
of the NRC staff, as
needed, on additional
information related to
DPO issues. |
6) |
4:30 - 5:30 P.M. |
Break and Preparation of Draft ACRS Reports
(Open) |
|
Cognizant ACRS members will prepare draft
reports, as needed, for consideration by the full Committee. |
7) |
5:30 - 7:00 P.M. |
Proposed ACRS Reports (Open)
Discussion of proposed ACRS reports on: |
|
7.1) |
Framework for Risk-Informed Changes to 10
CFR Part 50 (GA/MTM) |
7.2) |
Spent Fuel Pool Accident
Risk at Decommissioning
Nuclear Power Plants
(TSK/MME/MWW) |
7.3) |
Risk-Informed
Regulation
Implementation Plan
(GA/MTM) |
7.4) |
DPO on Steam Generator
Tube Integrity
(DAP/SD/US) |
FRIDAY, NOVEMBER 3, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
8) |
8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open)
(DAP/JTL) |
9) |
8:35 - 10:30 A.M. |
Performance-Based, Risk-Informed Fire Protection
Standard for LWRs and Related Issues (Open)
(JDS/DAP/AS) |
|
9.1) |
Remarks by the
Subcommittee Chairman |
9.2) |
Briefing by and
discussions with
representatives of the
NRC staff, Nuclear
Energy Institute, and
National Fire Protection
Association (NFPA) on
the revised NFPA 805
standard, post-fire safe
shutdown circuit analysis,
and other related fire
protection issues. |
10:30 - 10:45 A.M. |
***BREAK*** |
10) |
10:45 - 12:00 Noon |
ABB/CE and Siemens Digital I&C Applications
(Open) (REU/AS) |
|
Report by the Subcommittee Chairman on a
subcommittee meeting on this matter and his
recommendation regarding further review by the full
Committee. |
12:00 - 1:00 P.M. |
***LUNCH*** |
11) |
1:00 - 3:00 P.M. |
License Renewal Guidance Documents (Open)
(MVB/RLS/NFD) |
|
11.1) |
Remarks by the
Subcommittee Chairman |
11.2) |
Briefing by and
discussions with
representatives of the
NRC staff regarding
proposed Standard
Review Plan for License
Renewal, Generic Aging
Lessons Learned Report,
Regulatory Guide, and
NEI 95-10, Industry
Guidelines for
Implementing the
Requirements of the
License Renewal Rule.. |
Representatives of the nuclear industry will provide
their views, as appropriate. |
3:00 - 3:15 P.M. |
***BREAK*** |
12) |
3:15 - 4:30 P.M. |
Research Report to the Commission (Open)
(DAP/MME) |
|
Discussion of the status of the draft ACRS report on
the NRC SafetyResearch Program. Representatives
of the NRC staff will provide their views, as
appropriate. |
13) |
4:30 - 5:00 P.M. |
Future ACRS Activities/Report of the Planning and
Procedures
Subcommittee (Open) (DAP/JTL/HJL) |
|
13.1) |
Discussion of the
recommendations of the
Planning and Procedures
Subcommittee regarding
items proposed for
consideration by the full
Committee during future
ACRS meetings. |
13.2) |
Report of the Planning
and Procedures
Subcommittee on matters
related to the conduct of
ACRS business, and
organizational and
personnel matters relating
to the ACRS. |
14) |
5:00 - 5:15 P.M. |
Reconciliation of ACRS Comments and
Recommendations (Open)
(DAP, et al./HJL, et al.) |
|
Discussion of the responses from the NRC
Executive Director for Operations to comments and
recommendations included in recent ACRS reports
and letters. |
15) |
5:15 - 6:00 P.M. |
Break and Preparation of Draft ACRS Reports |
|
Cognizant ACRS members will prepare draft
reports, as needed, for consideration by the full
Committee. |
16) |
6:00 -7:30 P.M. |
Proposed ACRS Reports (Open) |
|
Discussion of proposed ACRS reports on: |
16.1) |
Framework for Risk-Informed Changes to 10
CFR Part 50 (GA/MTM) |
16.2) |
Spent Fuel Pool Accident
Risk at Decommissioning
Nuclear Power Plants
(TSK/MME/MWW) |
16.3) |
Risk-Informed
Regulation
Implementation Plan
(GA/MTM) |
16.4) |
DPO on Steam Generator
Tube Integrity
(DAP/SD/US) |
16.5) |
Performance-Based,
Risk-Informed Fire
Protection Standard
(JDS/DAP/AS) |
16.6) |
Research Report to the
Commission
(DAP/MME) |
16.7) |
License Renewal
Guidance Documents
(MVB/RLS/NFD) |
SATURDAY, NOVEMBER 4, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
17) |
8:30 - 1:00 P.M. |
Proposed ACRS Reports (Open) - The Committee
will continue its discussion and preparation of
proposed ACRS reports listed under item 16. |
18) |
1:00 - 1:30 P.M. |
Miscellaneous (Open) (DAP/JTL) |
|
Discussion of matters related to the conduct of
Committee activities and matters and specific issues
that were not completed during previous meetings,
as time and availability of information permit. |