Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2009
> March 6
Power Reactor Status Report for March 6, 2009
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
0 |
02/22/2009 |
REFUELING OUTAGE |
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
300 MEGAVAR LIMIT PER LOAD DISPATCHER |
* |
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
98 |
|
END OF CYCLE COASTDOWN |
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
345KV LINE #363 OUTAGE FROM 0800-1600 HRS FOR PLANNED MAINTENANCE |
* |
|
Susquehanna 1 |
94 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Susquehanna 2 |
100 |
|
|
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
02/25/2009 |
SHUTDOWN TO REPAIR RECIRC "1B" PUMP MOTOR LOWER BEARING - DAMAGED SEAL REQUIRES REPLACEMENT |
|
|
Browns Ferry 2 |
94 |
|
REDUCED POWER FOR WORK ON "B2" EXTRACTION VALVE |
* |
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
0 |
02/27/2009 |
REFUELING OUTAGE |
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Crystal River 3 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
0 |
02/08/2009 |
REFUELING OUTAGE |
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
62 |
|
REDUCED POWER DUE TO TURBINE COOLING WATER PUMP PROBLEM |
* |
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
MINIMUM GENERATION ALERT
100% ELECTRICAL CAPABILITY |
* |
|
D.C. Cook 1 |
0 |
03/02/2009 |
SEE EN #44507. |
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
17 |
|
HOLDING POWER WITH CONTROL VALVE ISSUE AND REVENUE METERING ISSUE |
* |
|
Fermi 2 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
0 |
02/22/2009 |
REFUELING OUTAGE |
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
0 |
03/05/2009 |
PLANNED MAINTENANCE OUTAGE |
* |
|
Diablo Canyon 1 |
0 |
01/25/2009 |
S/G REPLACEMENT
DEFUELED |
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
97 |
|
LIMITED BY S/G PRESSURE. |
|
|
San Onofre 3 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|