FHWA > Engineering > Pavements > Publications |
Publication Details
Primary Topic: Materials-Concrete Description: This document provides guidance on details of concrete curing practice as they pertain to construction of portland cement concrete pavements. The guide is organized around the major events in curing pavements: curing immediately after placement (initial curing), curing during the period after final finishing (final curing), and termination of curing and evaluation of effectiveness of curing. Information is presented on selection of curing materials and procedures, analysis of concrete properties and jobsite conditions, and on ways to adjust curing practice to account for specific project conditions. FHWA Publication Number: FHWA-RD-02-099 Publication Year: 2005 Document Links: HTML PDF (file size: 652 kb) PDF files can be viewed with the Acrobat® Reader®
|
||||
This page last modified on 10/15/07 |