These supplemental specifications are approved for use in the development of WFLHD projects using the FP-03. The FLH supplement specifications are included within these supplements.
To view/download specific supplemental specifications in MSWord format, select the appropriate link below for either Metric (MET) or US Customary (USC) projects.
|
Description |
Download (Modified) |
Record of Specification Changes |
MET (4/2/2009) |
USC (4/2/2009) |
Solicitation Table of Contents |
MET (1/1/2004) |
USC (1/1/2004) |
SCR's Table of Contents |
MET (12/3/2008) |
USC (12/3/2008) |
Notice to Bidders |
MET (4/2/2009) |
USC (4/2/2009) |
Section |
Description |
Download (Modified) |
101 |
Terms, Format, and Definition |
MET (6/22/2007) |
USC (6/22/2007) |
102 |
Bid, Award, and Execution of Contract |
MET (2/25/2009) |
USC (2/25/2009) |
103 |
Scope of Work |
MET (1/2/2008) |
USC (1/2/2008) |
104 |
Control of Work |
MET (5/6/2008) |
USC (5/6/2008) |
105 |
Control of Material |
MET (4/2/2009) |
USC (4/2/2009) |
106 |
Acceptance of Work |
MET (2/25/2009) |
USC (3/25/2009) |
107 |
Legal Relations and Responsibility to the Public |
MET (3/25/2009) |
USC (3/25/2009) |
108 |
Prosecution and Progress |
MET (2/13/2009) |
USC (2/13/2009) |
109 |
Measurement and Payment |
MET (9/14/2008) |
USC (9/14/2008) |
Section |
Description |
Download (Modified) |
151 |
Mobilization |
MET (6/22/2007) |
USC (6/22/2007) |
152 |
Construction Survey and Staking |
MET (6/6/2006) |
USC (6/6/2006) |
153 |
Contractor Quality Control |
MET (3/15/2007) |
USC (3/15/2007) |
154 |
Contractor Sampling and Testing |
MET (4/2/2009) |
USC (4/2/2009) |
155 |
Schedules for Construction Contracts |
MET (3/11/2008) |
USC (3/11/2008) |
156 |
Public Traffic |
MET (4/7/2006) |
USC (4/7/2006) |
157 |
Soil Erosion Control |
MET (12/13/2005) |
USC (12/13/2005) |
Section |
Description |
Download (Modified) |
201 |
Clearing and Grubbing |
MET (1/1/2004) |
USC (1/1/2004) |
203 |
Removal of Structure and Obstructions |
MET (6/4/2007) |
USC (6/4/2007) |
204 |
Excavation and Embankment |
MET (9/14/2008) |
USC (9/14/2008) |
205 |
Rock Blasting |
MET (2/20/2007) |
USC (2/20/2007) |
208 |
Structure Excavation and Backfill for Selected Major Structures |
MET (9/14/2008) |
USC (9/14/2008) |
209 |
Structure Excacation and Backfill |
MET (1/18/2008) |
USC (1/18/2008) |
213 |
Subgrade Stabilization |
MET (7/16/2004) |
|
Section |
Description |
Download (Modified) |
251 |
Riprap |
MET (10/4/2007) |
USC (10/4/2007) |
253 |
Gabions and Revet Mattresses |
MET (8/8/2005) |
USC (8/8/2005) |
255 |
Mechanically Stabilized Earth Walls |
MET (1/1/2004) |
USC (1/1/2004) |
258 |
Reinforced Concrete Retaining Walls |
MET (1/1/2004) |
USC (1/1/2004) |
270 |
Compaction Grouting |
MET (1/2/2008) |
USC (1/2/2008) |
271 |
Geotechnical Exploration |
MET (1/2/2008) |
USC (1/2/2008) |
272 |
Reinforced Concrete Retaining Walls |
MET (1/2/2008) |
USC (1/2/2008) |
Section |
Description |
Download (Modified) |
301 |
Untreated Aggregate Courses |
MET (9/14/2008) |
USC (9/14/2008) |
302 |
Treated Aggregate Courses |
MET (4/18/2008) |
USC (4/18/2008) |
304 |
Aggregate Stabilization |
MET (9/14/2008) |
USC (9/14/2008) |
305 |
Aggregate-Topsoil Course |
MET (1/1/2004) |
USC (1/1/2004) |
309 |
Emulsified Asphalt Treated Base Course |
MET (3/28/2007) |
USC (3/28/2007) |
310 |
Recycled Aggregate Course |
MET (1/1/2004) |
USC (1/1/2004) |
311 |
Stockpiled Aggregate |
MET (2/13/2007) |
USC (2/13/2007) |
312 |
Permeable Aggregate Course |
MET (1/2/2008) |
USC (1/2/2008) |
Section |
Description |
Download (Modified) |
401 |
Superpave Hot Asphalt Concrete Pavement |
MET (3/23/2009) |
USC (3/23/2009) |
402 |
Hot Asphalt Concrete Pavement By Hveem or Marshall Mix Design Method |
MET (6/16/2006) |
USC (6/16/2006) |
403 |
Hot Asphalt Concrete Pavement |
MET (9/13/2005) |
USC (9/13/2005) |
404 |
Minor Hot Asphalt Concrete |
MET (5/17/2007) |
USC (5/17/2007) |
405 |
Open-Graded Asphalt Friction Course |
MET (9/13/2005) |
USC (9/13/2005) |
409 |
Asphalt Surface Treatment |
MET (9/14/2008) |
USC (9/14/2008) |
410 |
Slurry Seal |
MET (6/4/2007) |
USC (6/4/2007) |
411 |
Asphalt Prime Coat |
MET (1/1/2004) |
USC (1/1/2004) |
412 |
Asphalt Tack Coat |
MET (1/1/2004) |
USC (1/1/2004) |
416 |
Continuous Cold Recycled Asphalt Base Course |
MET (8/22/2008) |
USC (8/22/2008) |
418 |
Foamed Asphalt Stabilization Course |
MET (9/14/2004) |
USC (9/14/2004) |
428 |
Flexible Pavement Restoration |
MET (1/2/2008) |
USC (1/2/2008) |
429 |
Bonded Wearing Surface |
MET (12/20/2005) |
USC (12/20/2005) |
430 |
Superpave Hot Synthetic Concrete Pavement |
MET (1/2/2008) |
USC (1/2/2008) |
431 |
Permeable Hot Asphalt Concrete Pavement |
MET (1/2/2008) |
USC (1/2/2008) |
Section |
Description |
Download (Modified) |
501 |
Rigid Pavement |
MET (2/20/2008) |
USC (2/20/2008) |
Section |
Description |
Download (Modified) |
551 |
Driven Piles |
MET (6/4/2007) |
USC (6/4/2007) |
552 |
Structural Concrete |
MET (2/21/2008) |
USC (2/21/2008) |
553 |
Prestressed Concrete |
MET (1/1/2004) |
USC (1/1/2004) |
554 |
Reinforcing Steel |
MET (6/4/2007) |
USC (6/4/2007) |
555 |
Steel Structures |
MET (6/4/2007) |
USC (6/4/2007) |
561 |
Structural Concrete Bonding |
MET (1/2/2008) |
USC (1/2/2008) |
562 |
Temporary Works |
MET (1/1/2004) |
USC (1/1/2004) |
565 |
Drilled Shafts |
MET (12/10/2008) |
USC (12/10/2008) |
569 |
Micropile |
MET (9/14/2004) |
USC (9/14/2004) |
575 |
Minor Bridge Work |
MET (12/20/2005) |
USC (12/20/2005) |
576 |
Pile Encapsulation |
MET (12/20/2005) |
USC (12/20/2005) |
577 |
Plastic Structures |
MET (1/2/2008) |
USC (1/2/2008) |
578 |
High Performance Concrete |
MET (2/21/2008) |
USC (2/21/2008) |
579 |
Latex Modified Concrete Overlay |
MET (2/21/2008) |
USC (2/21/2008) |
580 |
Alternate Bridge |
MET (2/21/2008) |
USC (2/21/2008) |
Section |
Description |
Download (Modified) |
601 |
Minor Concrete Structures |
MET (1/2/2008) |
USC (7/26/2005) |
602 |
Culverts and Drains |
MET (2/11/2008) |
USC (2/11/2008) |
605 |
Underdrains, Sheet Drains, and Pavement Edge Drains |
MET (1/1/2004) |
USC (1/1/2004) |
608 |
Paved Waterways |
MET (9/14/2008) |
USC (9/14/2008) |
609 |
Curb and Gutter |
MET (9/14/2008) |
USC (9/14/2008) |
613 |
Simulated Stone Masonry Surface |
MET (1/1/2004) |
USC (1/1/2004) |
614 |
Lean Concrete Backfill |
MET (1/1/2004) |
USC (1/1/2004) |
615 |
Sidewalks, Drive Pads, and Paved Medians |
MET (9/14/2008) |
USC (9/14/2008) |
616 |
Slope Paving |
MET (4/18/2008) |
USC (4/18/2008) |
617 |
Guardrail |
MET (3/29/2006) |
USC (3/29/2006) |
622 |
Rental Equipment |
MET (1/1/2004) |
USC (1/1/2004) |
623 |
General Labor |
MET (1/1/2004) |
USC (1/1/2004) |
625 |
Turf Establishment |
MET (1/1/2004) |
USC (1/1/2004) |
633 |
Permanent Traffic Control |
MET (1/1/2004) |
USC (1/1/2004) |
635 |
Temporary Traffic Control |
MET (6/22/2007) |
USC (6/22/2007) |
646 |
Roadside Development |
MET (9/14/2004) |
USC (9/14/2004) |
647 |
Environmental Mitigation |
MET (9/14/2004) |
USC (9/14/2004) |
648 |
Pipeline Energy Utilities |
MET (1/2/2008) |
USC (1/2/2008) |
650 |
Temporary Diversions |
MET (3/24/2005) |
USC (3/24/2005) |
651 |
Rockfall Protection |
MET (10/30/2006) |
USC (10/30/2006) |
Section |
Description |
Download (Modified) |
701 |
Cement |
MET (10/19/2007) |
USC (10/19/2007) |
702 |
Asphalt Material |
MET (2/21/2008) |
USC (2/21/2008) |
703 |
Aggregate |
MET (9/14/2008) |
USC (9/14/2008) |
704 |
Soil |
MET (10/12/2007) |
USC (10/12/2007) |
705 |
Rock |
MET (9/11/2006) |
USC (9/11/2006) |
706 |
Concrete and Plastic Pipe |
MET (6/4/2007) |
USC (6/4/2007) |
708 |
Paint |
MET (1/1/2004) |
USC (1/1/2004) |
709 |
Reinforcing Steel and Wire Rope |
MET (6/4/2007) |
USC (6/4/2007) |
712 |
Joint Material |
MET (9/21/2007) |
USC (9/21/2007) |
713 |
Roadside Improvement Material |
MET (1/1/2004) |
USC (1/1/2004) |
716 |
Material for Timber Structures |
MET (1/1/2004) |
USC (1/1/2004) |
717 |
Structural Metal |
MET (1/1/2004) |
USC (1/1/2004) |
718 |
Traffic Signing and Marking Material |
MET (7/16/2004) |
USC (7/16/2004) |