Community Pit | Description | Location | Price (MInimum $10) | Minimum Permitted Amounts |
Community Topsoil Pit | Sandy loam used for topsoil, fill and general landscaping. | Southwestern portion of the Thousand Springs Valley. | $2.25/CY | 4 CY |
Bradbury Flat Community Pits -- and | Silty, sandy loam used for topsoil, fill and general landscaping. | Northern portion of Bradbury Flat approximately 9 miles south of Challis. | Topsoil: $2.25/CY Fill: $0.90/CY | Topsoil: 4 CY Fill: 11 CY |
Community Sand and Gravel Pit | Silt, sand and gravel used for fill and surfacing roads. | Near the mouth of the Pahsimeroi Valley at the intersection of Burstead Lane and the West Side Pahsimeroi Valley Road. | $1.50/CY | 6.7 CY |
Community Borrow Pit | Gravelly clay used for lining ponds and ditches and surfacing roads. | In upper portion of the Pahsimeroi Valley approximately ¾-mile west of Hatch Lane and ¼-mile southeast of the California Ditch. | $0.90/CY | 11 CY |
Community Borrow Pit | Andesite and welded tuff fragments used for fill and surfacing roads. | Northwest portion of Round Valley. | $1.15/CY | 8.7 CY |
Community Sand and Gravel Pit | Sand and gravel used for common borrow and production of aggregates. | Central portion of the Thousand Springs Valley. | $1.50/CY | 6.7 CY |
Community Gravel Pit | Sand and gravel used for road construction and surfacing. | In upper portion of the Pahsimeroi Valley near the intersection of Hatch Lane and the West Side Pahsimeroi Valley Road. | $1.50/CY | 6.7 CY |
Community Rip-Rap Pit | Basaltic lava used as decorative rock and small diameter rip-rap. | Southwestern portion of Thousand Springs Valley. | $1.15/CY $0.90/T | 8.7 CY 11 T |
Community Shale Pit | Calcareous shale to shaley limestone used for road surfacing. | Southwestern portion of the Thousand Springs Valley. | $1.15/CY $1.05/T | 8.7 CY 9.5 T |
Community Rip-Rap Pits (No.1-5) | Quartzite used for decorative rock and mall- and medium-sized rip-rap. | Along Morgan Creek Road commencing 3.5 miles from the intersection of Morgan Creek Road and State Route 93 South to a point 5 miles from the intersection. | $1.75/CY $1.30/T | 5.7 CY 7.7 T |
*
| Broken stone, quartzite | 10 miles southeast of May | $1.75/CY | 5.7 CY |
| Argillite (dense mudstone) used for surfacing roads. | Southwestern portion of the Thousand Springs Valley. | $1.15/CY $1.05/T | 8.7 CY 9.5 T |
| Decomposed rhyolite used for surfacing roads. | 2 miles southwest of Mackay. | $0.90/CY | 11 CY |
Rip-Rap Pit | Basaltic lava used as decorative rock and small diameter rip-rap. | Approximately ¾-mile northeast of the intersection of the Spar Canyon Road and the East Fork Salmon River Valley Road. | $1.15/CY $0.90/T | 8.7 CY 11 T |
**
| Broken stone (limestone) | 2 miles southwest of Mackay | $1.15/CY | 8.7 CY |
Community Borrow Pit | Gravelly, sandy clay used for fill and surfacing roads. | Along Morgan Creek Road near its intersection with the West Fork of Morgan Creek Road, approximately 6 miles from State Route 93 South. | $0.90/CY | 11 CY |
Maximum amounts are not listed because they vary depending on material types.
* No operations at Patterson Creek during September 15 - May 31 ** No operations at Taylor Canyon during November 15 - April 30 |