Line | Symbol | Effective Date | Description | Tariff |
---|---|---|---|---|
2160.0000 | INDUSTRIAL SHIPYARD SERVICES |
|||
Note:
| ||||
2160.0100 | 11-DEC-02 |
Use of the travel lift for the lifting, transport, and placement of
boats up to 20 meters in length, 5.6 meters in beam, and 45 metric
tons of displacement. This tariff is applied from the moment the travel
lift initiates lifting until the boat is placed on the docking bed
or until it is refloated. |
$500.00/ Hr | |
2160.0200 | 11-DEC-02 |
Use of the small boat repair yard, which includes: a hangar for dry-docking five launches up to 20 meters in length and 5.6 meters in beam, with a 4.5 metric tons overhead crane; a covered dock for six launches of equal dimensions and an open 1,000 squared meters concrete-slab work area. This tariff is applied from the moment the launch is placed on the docking bed or the first mooring line is secured to the pier when docking, until the launch is removed from the bed or the last line is made free from the pier when undocking. (It does not include supply of electric power, water, or compressed air; it does not include design, preparation, or use of the berthing bed; it does not include shore support, the use of tools, or other equipment; and it does not include customs, immigration, or local living services.) Tariff by Length Overall (LOA) in meters per day |
$5.56M/day | |
The Industrial Shipyard Division reserves the exclusive right of drydocking all launches. | ||||
2160.0300 | 11-DEC-02 |
Use of the synchrolift and transfer tables for the extraction, launching, or transfer of vessels and other floating structures. Tons of displacement to be dried dock in metric tons for the hours of stay. This tariff applies from the moment the movement of one of the tables or the sequential movement of both is initiated until it ends. When any of the tables is used to perform inspections or repair work, this tariff is applicable only during the raising, lowering, or transfer of the vessel. During the inspection or repair work, the tariff for the use of the synchrolift work area (2160.0400) is also applicable. The synchrolift table is 48 meters x 22 meters and the transfer table is 29 meters x 13 meters. The lifting table can accommodate vessels up to 45 meters in length, 20 meters in beam, 1,700 metric tons of displacement, and a maximum draft of 6 meters. Tariff in tons per hour. (It does not include operator or divers during docking; it does not include the design, preparation, or use of the docking bed; it does not include shore support or positioning of the vessel over the table; it does not include use of tools or other equipment; and, it does not include customs, immigration, or local living services.). |
$4.65 | |
The Industrial Shipyard Division reserves the exclusive right of drydocking all vessels. | ||||
2160.0400 | 11-DEC-02 |
Use of the synchrolift working (berthing) area. The working area can dry berth up to six vessels of 35 meters in length and two of 45 meters in length simultaneously. This tariff applies during the use of this area. Daily tariff. (It does not include the supply of electrical power, potable water, or compressed air; it does not include the design, preparation, or use of the berthing bed; it does not include shore support, utilization of tools, or other equipment.). |
$ 1,010.00 | |
2160.0500 | 11-DEC-02 |
Stay in dry dock. Tons of displacement in metric tons, for the days of stay. The dry dock capacity is for ships up to 114 meters in length x 17 meters of beam with a maximum draft of six meters. The tariff is applied from the instance in which the bow or stern on the waterline crosses for the first time the center of the gate seal in entering, until it is cross last in exiting. Tariff per tons per day. (It does not include supply of electric energy, potable water, compressed air, or the service of divers in docking; it does not include design, preparation, or use of the berthing bed; it does not include shore support, preparation of the vessel for dry-docking, use of tools, or other equipment; and it does not include customs, immigration, or local living services). |
$ 3.35 | |
The Industrial Shipyard Division reserves the exclusive right of dry-docking all vessels. | ||||
2160.0600 | 11-DEC-02 | Use of piers 14 & 15. Length Overall (LOA) in meters by the hours of stay. The tariff applies from the moment the first mooring line is secured to the dock, until the last line is made free from the pier. Tariff per meters per hour. | ||
2160.0610 | Pier 15: Concrete structure with fendering with dimensions of: 270 meters in length x 12 meters in width and 10.5 meters of draft. | $0.28 | ||
2160.0620 | Pier 14: Concrete structure with fendering with dimensions of: 142 meters in length x 7 meters in width and 10.5 meters of draft. | $0.28 | ||
(It does not include supply of electric power, potable water, compressed air, or mooring for docking assistance; and it does not include customs, immigration, or local living services.) | ||||
2160.0700 | 30-JAN-03 | Complementary Tariff | ||
Fire Watchman | ||||
Fire watchman attendance - mandatory as per local safety regulations: | ||||
2160.0701 | 30-JAN-03 | - in normal daytime shifts, per man. | $ 152.00 | |
2160.0702 | 30-JAN-03 | - in continuous shifts, per man. | $ 456.00 | |
2160.0703 | 30-JAN-03 | - per normal working hour (min. 4 hours)... | $ 19.00 | |
Fire mains | ||||
Temporary connections to yard's fire mains: | ||||
2160.0704 | 30-JAN-03 | - connect / disconnect (per line). | $ 95.00 | |
2160.0705 | 30-JAN-03 | - maintaining pressure, per line (daily). | $ 52.25 | |
Shore Power | ||||
Supply, 440 V, 60 cycles: | ||||
2160.0706 | 30-JAN-03 | - connect / disconnect cable leads. | $ 237.50 | |
2160.0707 | 30-JAN-03 | - shore power supply (per kWh). | $ 0.29 | |
Shore Power | ||||
Supply, portable generator, 380 V, 50 cycles, 125 amps: | ||||
2160.0708 | 30-JAN-03 | - mobilize / demobilize per set. | $ 513.00 | |
2160.0709 | 30-JAN-03 | - rental each (daily). | $ 456.00 | |
2160.0710 | 30-JAN-03 | - power supply (per kWh). | $ 0.29 | |
Garbage Skip | ||||
Setting available garbage skip for domestic refuse only | ||||
2160.0711 | 31-JAN-03 | - rental, per each skip. | $ 42.75 | |
Note: final disposal of garbage is to be arranged by ship's local agents. | ||||
Cooling Water | ||||
Temporary cooling water connections: | ||||
2160.0712 | 31-JAN-03 | - connect / disconnect (per line). | $ 190.00 | |
2160.0713 | 31-JAN-03 | - water supply, (per line). | $ 71.25 | |
Fresh (Potable) Water Supply | ||||
2160.0714 | 30-JAN-03 | - connect / disconnect supply hoses (each)... | $ 95.00 | |
2160.0715 | 30-JAN-03 | - water supply (per ton). | $ 2.38 | |
Note: minimum charge per each occasion 10 tons. | ||||
Compressed Air | ||||
Supply, at owner's request: | ||||
2160.0716 | 30-JAN-03 | - connect / disconnect (per line)... | $ 95.00 | |
2160.0717 | 30-JAN-03 | - air supply, per line. | $ 95.00 | |
Ballast Water Supply | ||||
2160.0718 | 30-JAN-03 | - connect / disconnect (per line). | $ 95.00 | |
2160.0719 | 30-JAN-03 | - water supply (per ton). | $ 0.38 | |
Note: minimum charge per each occasion 100 tons. | ||||
Scupper Plugs | ||||
2160.0720 | 30-JAN-03 | - temporary fitting of scupper plugs (each). | $ 47.50 | |
Bottom Plugs | ||||
2160.0721 | 30-JAN-03 | - removal / afterwards refitting with new joints (no scaffolding included) (each). | $ 38.00 | |
Marine Chemist | ||||
Issuing certified marine chemist's gas free certificates as per condition of vessel upon her arrival at yard: | ||||
2160.0722 | 30-JAN-03 | - first general test (once). | $ 237.50 | |
2160.0723 | 30-JAN-03 | - additional tests/daily inspection (each). | $ 190.00 | |
2160.0724 | 30-JAN-03 | - compartment test (each).. | $ 190.00 | |
Crane | ||||
Shore crane for handling owners' stores and spares: | ||||
2160.0725 | 30-JAN-03 | - rental, including operator (per hour). | $ 71.25 | |
Note: minimum charge 1 (one) hour. | ||||
Telephone Services | ||||
2160.0726 | 30-JAN-03 | - connect / disconnect unit (each). | $ 95.00 | |
- local calls, free of charge | ||||
- long distance calls, at cost | ||||
CO2 Unit | ||||
2160.0727 | 30-JAN-03 | - temporary disconnecting, securing, and reconnecting (each). | $ 570.00 | |
Ventilation, at owners' request: | ||||
2160.0728 | 30-JAN-03 | - mob and demob of unit (per unit). | $ 95.00 | |
2160.0729 | 30-JAN-03 | - rental, including operational costs, per unit (daily) | $ 47.50 | |
Temporary Lighting | ||||
Temporary lighting, at owners' request: | ||||
2160.0730 | 30-JAN-03 | - mob and demob of unit (per unit). | $ 190.00 | |
2160.0731 | 30-JAN-03 | - rental, including operational costs, per unit (daily). | $ 95.00 | |
Protective Floor Covering | ||||
2160.0732 | 30-JAN-03 | - initial charge (once). | $ 237.50 | |
2160.0733 | 30-JAN-03 | - surcharge (m2). | $ 3.61 |