Central Federal Lands Highway Division Central Federal Lands Highway Division
About CFLHD Projects Procurement Design Resources Technology Development Materials Central Federal Lands Highway Division
  Home > Projects > California > CA PRA YOSE 500(1) VALLEY LOOP ROAD
spacer image
Project Overview Construction Activities Driving Conditions Traffic Delays Traffic Detours Road Closures Alternate Routes Contacts

CA PRA YOSE 500(1) VALLEY LOOP ROAD
Road Construction Update

Last Revised: 4-28-2009


Road Condition Information for the period of:
The current work on Southside Drive from El Capitan Crossover to the Chapel is underway and will be completed by September 2007.
Construction Activities

Installing dry stack and mortared headwalls, riprap aprons, and grading around inlet and outlet headwalls between El Capitan Crossover and Chapel Straight along Southside Drive, and surveying for drainage structures and photo documentation of existing stonework between El Capitan Crossover and the Pohono Bridge Intersection along Northside Drive.




Planning and Design Contact Information:
Project Manager Patrick Flynn, P.E.
Mailing Address Central Federal Lands Highway Division
Attn: Patrick Flynn, P.E.
12300 West Dakota Avenue
Lakewood, CO   80228
Phone 720-963-3721
Fax 720.963.3596
E-mail patrick.flynn@fhwa.dot.gov
Construction Contact Information:
Const. Manager Leo DePaula
Mailing Address 12300 West Dakota Avenue Lakewood, CO 80228
Phone (720)963-3413
Fax (720)963-3437
E-mail Leo.Depaula@fhwa.dot.gov
Project Photos:
View photos of the project site.






 

Top of Page

Home | About CFLHD | Projects | Procurement | Design Resources | Technology Development | Contact Information

USDOT | FHWA | FLHP | EFLHD | CFLHD | WFLHD

Please send your questions or comments to CFL.Webmaster@fhwa.dot.gov