Hydropower - Licensing
Contents of an Application
Traditional and Alternative Licensing Processes
The contents of an application will vary depending on the type
of application:
(Note: Most of the links are to external sites and you will be leaving FERC's website)
Project Type
|
Application Requirements |
Major Unconstructed or Major Modified
(more than 5 MW) (4.40) |
4.32(a) -general
information;
4.41(a)-(h) -content of application; 16.10 -information
provided by applicants (relicenses); 4.38(f) for original licenses and 16.8(f)
for relicense-documentation of consultation |
Major Project - Existing Dam (more than 5
MW) (4.50) |
4.32(a) -general
information; 4.51(a)-(h) -content
of application; 16.10 -information
provided by applicants (relicenses); 4.38(f) for original licenses and 16.8(f) for relicense-documentation of consultation |
Minor Project (1.5 MW or less), or Major Project--Existing
Dam (5 MW or less) (4.60) |
4.32(a) -general
information; 4.61(b)-(f) -content
of application; 16.10-information
provided by applicant (relicenses); 4.38(f) for original licenses and 16.8(f) for relicense-documentation of consultation |
Major Unconstructed or Major Modified (more
than 1.5 MW but less than 5 MW) (4.60) |
4.32(a) -general
information; 4.61(b),
(c), (e), and (f) -content of application; 4.41(f) -environmental report; 16.10 -information
provided by applicant (relicenses); 4.38(f) for original licenses and 16.8(f) for relicense-documentation of consultation |
|
|
|
|
|
|
Contact Information
Timothy Welch
West, California
Telephone: 202-502-8760
Jennifer Hill
West, Northwest
Telephone: 202-502-6797
Edward Abrams
Southeast
Telephone: 202-502-8773
Vince Yearick
Northeast, Midwest
Telephone: 202-502-6174 |
|
|
|
|
|
|
|
|
Contents of an Application
|
|
|
|
|
|