Project Number | 204 |
Date of Summary | March 31, 1995 |
Subject | Post Mortem Platform Failure Evaluation Study |
Performing Activity | PMB Engineering, Inc. |
Principal Investigator | Mr. Frank J. Puskar |
Contracting Agency | Minerals Management Service |
Estimated Completion | Complete |
Description | This is a Joint Industry Project (JIP) that used the results of Hurricane Andrew to evaluate engineering methods for predicting platform failure or survivability by comparing screening analysis and/or detailed failure analysis against actual field data (i.e. platforms that were exposed to Andrew and either survived, collapsed, or were damaged). In addition, the study will also examined the concept of a formal Offshore Platform Evaluation System as a management information system. |
Progress | Complete |
Reports |
|
AA (47 pages) | Hurricane Andrew, Effects on Offshore Platforms Final Project Meeting June 21-22 1995 PMB Engineering, Inc. |
AB (113 pages) | Hurricane Andrew, Effects on Offshore Platforms Phase II Final Project Meeting June 21-22 1995 PMB Engineering, Inc. |
AC1 (126
pages)
AC2 ( 1,032 pages) |
Benchmark Analysis - Trial Application of API RP 2A - WSD Draft Section 17, Final Report submitted by PMB Engineering, Inc., December 1994 |
AD (104 pages) | Post Mortem Platform Failure Evaluation Study: Final Report, PMB Engineering Inc., San Francisco, California, August 1994. |