Project Number | 211 |
Date of Summary | March 31, 1995 |
Subject | Architect and Engineering Services |
Performing Activity | W. H. Linder and Associates, Inc. |
Principal Investigator | Mr. Barry Reed |
Contracting Agency | Minerals Management Service |
Estimated Completion | Complete |
Description | The goal of this project was to provide an independent assessment of platforms subjected to severe storm loads as a result of Hurricane Andrew. The work was provided to the American Petroleum Institute (API) task group which was given the charge to develop requalification and reassessment standards. |
Progress | Complete |
Reports |
|
AA (190 pages) | Reed, B., Celebi, E.M.,Trial Application of the Draft API RP2A-WSD Procedure for Structural Assessment of Shell West Delta 103 `A` Platform: Assessment Calculations, Book 1 of 4 of the Final Report submitted by W.H. Linder & Associates, Inc., July 1994. |
AB (267 pages) | Trial Application of the Draft API RP2A-WSD Procedure for Structural Assessment of Shell West Delta 103 `A` Platform: Design Level Analysis Output, Book 2 of 4 of the Final Report submitted by W.H. Linder & Associates, Inc., July 1994. |
AC (308 pages) | Trial Application of the Draft API RP2A-WSD Procedure for Structural Assessment of Shell West Delta 103 `A` Platform: Ultimate Strength Analysis Output, Book 3 of 4 of the Final Report submitted by W.H. Linder & Associates, Inc., July 1994. |
AD (385 pages) | Trial Application of the Draft API RP2A-WSD Procedure for Structural Assessment of Shell West Delta 103 `A` Platform: Pushover Strength Analysis Output, Book 4 of 4 of the Final Report submitted by W.H. Linder & Associates, Inc., July 1994. |