Deepwater Research Projects |
008 |
Blowout Prevention Procedures for Deepwater
Drilling |
029 |
Deepwater Structures Technology Assessment |
036 |
Strumming of Risers |
076 |
Damage Mechanisms in the Placement and Repair of
Pipelines |
081 |
Fatigue of Selected High Strength Steels in Sea
Water |
084 |
Surface Oil Spill Containment and Cleanup |
085 |
Subsea Collection of Blowing Oil and Gas |
091 |
Underwater Subsea Production System Inspection |
094 |
Dynamic Motion Study of a Large Scale Compliant
Platform |
111 |
Development of a Method to Evaluate the Tension
Capacity of Drilled and Grouted Piles |
115 |
Hydrodynamic Effects on Design of Offshore
Platforms |
133 |
Synthetic-Fiber Mooring Lines for Deepwater
Floating Production Facilities |
147 |
Method for Predicting Hydrodynamic Damping for
Offshore Structures |
150 |
Floating Vessel Blowout Control |
165 |
Deepwater Pipeline Maintenance and Repair |
186 |
Hydrodynamic Damping and Combined Motion Loading
(HYDAMP II) |
189 |
Strengthening Modifications and Repair
Techniques |
195 |
Shallow Gas Broaching |
212 |
Deep Water Subsea Conceptual Studies, Phase I. |
216 |
SPAR Development Model Test Program |
226 |
Hydrates of Hydrocarbons--Practical Implications |
257 |
Strategy-Inhibition of Shallow Water Flows |
266 |
Support of the Offshore Technology Research
Center |
275 |
Riser Reliability Analysis |
280 |
Risk Assessment for Dry Tree Tieback
Alternatives Study |
284 |
Investigation of Hybrid Deep Water Production
Systems |
287 |
Fate and Behavior of Deepwater Subsea Oil Well
Blowouts in the Gulf of Mexico |
305 |
Highly Compliant Rigid-Pipe Riser Analysis |
311 |
Oil Spill Containment, Remote Sensing, and
Tracking from Deep Water Blowouts: Status of Existing and Emerging |
315 |
Engineers Design Guide to Deepwater Fiber
Moorings |
316 |
Reliability Study for Synthetic Moorings |
317 |
Deep Water Pipeline Repair Methods |
319 |
Reliability of Subsea Blowout Preventer Systems
for Deepwater applications--Phase II |
324 |
Experimental and Analytical Study of Multi-phase
Plumes in a Stratified Ocean with Application to Deep Ocean Spills |
327 |
Applied Gas Hydrate Research program |
328 |
OTRC Cooperative Agreement |
331 |
Lifetime Cost of Subsea Production Systems |
344 |
Durability of Polyester Rope Moorings |
359 |
Comparative Risk Analysis of Deep Water
Production Systems |
362 |
Suction Caissons & Vertically Loaded Anchors
(Part I and Part II) |
369 |
Polyester Rope Analysis Tool |
372 |
State of the Art of Removing Large Platforms Located in Deep Water |
377 |
Deep Spill |
380 |
Evaluation of the Suitability of Industry
Standards as MMS Requirements |
382 |
Experimental Validation of Well Control
Procedures in Deepwater |
383 |
Performance of Deepwater BOP Equipment During
Well Control Events |
384 |
Deepwater Riser Wear Technology |
386 |
Deepwater Dual-Density Drilling Workshop |
389 |
Characterizing Polyester Rope Installation Damage |
394 |
Interim Damage Criteria for Replacing Damaged Polyester Rope |
397 |
Severe Slugging Elimination in Ultra-Deep Water
Tiebacks and Risers |
398 |
Reliability of Pressure Signals in Offshore Pipelines Leak Detection |
402 |
Workshop on FPSO |
404 |
Project Offshore Deep slopes (PODS):
Seafloor Stability on the continental Shelf/Slope |
407 |
Damage Tolerance of Synthetic-Fiber Mooring
Ropes; Phase I: Small-Scale Experiments |
408 |
Development of a Blowout Intervention Method
and dynamic Kill Simulated for Blowouts Occurring Ultra-Deepwater |
409 |
Worldwide Assessment of Industry Leak
Detection Capabilities for Single and Multiphase Pipelines |
410 |
Deepwater Geohazards Workshop |
416 |
Damaged Polyester Rope-Large Scale
Experiment |
417 |
Deepwater Field Measurements |
418 |
Risk-Extend CRA for a SPAR-Based FPSO |
421 |
Seafloor Slope Stability Assessment |
423 |
Reliability of Mooring Systems for
Floating Production Systems |
426 |
Long Term Integrity of Deep-Water Cement
Systems |
432 |
Regional Synthesis of the Sedimentary
Thermal History and Hydrocarbon Maturation in the Deepwater Gulf of
Mexico |
434 |
Strain-Based Design of Pipelines |
435 |
Hydrate Flow Performance |
437 |
Reliability Analysis of Deepwater Anchors |
443 |
Technology
Assessment of Alternatives for Handling Associated Gas Produced from
Deepwater Oil Developments in the GOM |
446 |
ROV/AUV
Capabilities |
461 |
Characterizing Natural Gas Hydrates in the
Deepwater Gulf of Mexico |
471 |
Assessment of Performance of Deepwater
Floating Production Facilities |
472 |
Project Offshore Deep Slopes (PODS) - Phase
II |
475 |
Workshop on Deepwater Drilling: Where are we
headed? by International Association of Drilling Contractors |
479 |
Deep-Sea Furrows |
480 |
An Assessment of Safety, Risks and Costs Associated with Subsea
Pipeline Removals |
481 |
Deepwater Riser VIV Project - CFD Simulation of Riser VIV |
482 |
VIM/SPAR Industry Forum |
483 |
CFD Simulation of Ocean Turbulence Interactions with Spar Platforms |
487 |
An Assessment of Magnetization Effects on
Hydrogen Cracking for Thick Walled Pipelines |
490 |
CRA for Composite Drilling and Production Risers |
491 |
Risk Assessment for Submarine Slope
Stability |
492 |
Reliability of Subsea Systems |
494 |
New Touch-Down Zone Solutions for Steel
Catenary Risers (SCRs) |
496 |
Design of Cathodic Protection Systems for
Deep Water Compliant Petroleum Production Risers |
497 |
Probabilistic Reliability and Integrity
Assessment of Large-Diameter Compliant Risers for Ultra-Deepwater
Operations |
499 |
Development of Recommended Practices for Allocation Measurement |
500 |
Risk Comparison of Subsea versus Surface Processing |
502 |
Assessment of New and / or Improved Repair
Techniques for Ageing or Damaged Structures |
509 |
Interstitially Insulated
Pipe |
510 |
Seafloor Interaction
with Steel Catenary Risers |
519 |
Drilling and Completion Gaps for High Temperature and High Pressure In
Deep Water |
521 |
Riser VIV Workshop |
522 |
Methodologies for Measuring and Monitoring Hydrogen for Safety in
Advanced High Strength Linepipe Steel Applications. |
525 |
IADC workshop on “Offshore Logistics” Conference |
530 |
SCR Flex Joint Design and
Performance JIP |
531 |
SCR Integrity Management JIP |
532 |
Deepwater GOM Pipeline Damage Characteristics and Repair Options |
536 |
Vertical Access Riser Comparative Risk Assessment |
540 |
Risk Assessment of Surface vs. Subsurface BOP's on Mobile
Offshore Drilling Units |
541 |
Application of Dual
Gradient Technology to Top Hole Drilling |
556 |
Risk Assessment of Submarine Slope Stability - Hydroplaning |
557 |
Numerical Modeling of Torpedo Anchors |
560 |
Performance of Deepwater Production Platforms |
582 |
A Probabilistic Approach
to Risk Assessment of Managed Pressure Drilling in Offshore Drilling
Applications |
583 |
Characterizing Material
Performance for Design of Sour Service HPHT Equipment in Accordance
with API RP 6HP Practices |
591 |
Evaluate Accuracy of
Polyester Subrope Damage Detection Performed by ROVs Following
Hurricanes and Other Events |
592 |
Connector Designs for Top and Bottom
Tendon Connections |
599 |
Joint Industry Project
to Quantify Risks in Deepwater Production Facilities and Flowlines
in the GOM |
602 |
Cement Fatigue and HPHT
Well Integrity with Application to Life of Well Prediction |
603 |
Stability of Tension Leg Platforms with Damaged
Tendons |
604 |
Evaluation of Fatigue Life Models and Assessment
Practice for Tension Leg Platforms (Phase 1: Tendon System Fatigue) |
605 |
Cooperative Research on Extreme Seas and
their Impact to Floating Structures |
610 |
Marco Polo JIP Extension
2008 - 2009 Full-Scale Monitoring Marco Polo TLP |
614 |
ISO 13628-12 / API RP
2RD Dynamic Risers for Floating Production Installations JIP |
622 |
Impact of Marine Growth on Pipeline Risers for Floating Facilities JIP |
623 |
Evaluation of High Integrity Pressure Protection System (HIPPS) |
630 |
Risk Assessment for Pipelines in Deepwater (RAPID) JIP |
631 |
Risk Profile of Dual Gradient Drilling |
632 |
Evaluate New Materials for Deepwater Synthetic Mooring Systems
|
639 |
Decommissioning: Fixed and Floating Platform Removal and Disposition
|