001 |
Underwater Inspection/Testing/Monitoring of
Offshore Structures |
322 |
Workshop on "State-of-the-Art
Development of Composite Structures for Offshore Production Platforms" |
002 |
Dynamic Response of Offshore Structures |
323 |
Workshop on "Mexico Offshore
Risk Based Technology Developments" |
003 |
Incipient Crack Detection in Offshore
Structures |
324 |
Experimental and Analytical
Study of Multi-phase Plumes in a Stratified Ocean with Application to Deep
Ocean Spills |
004 |
Cavitating Water Jet Cleaning Nozzle |
325 |
Performance Measures/Best
Practices Workshops |
005 |
Attenuating Surface Waves in a Localized
Region of the Open Ocean |
326 |
Underwater Welding Workshop |
006 |
Research Program Advisory |
327 |
Applied Gas Hydrate Research
Program |
007 |
Unmanned, Untethered Inspection Vehicle
Technology (the EAVE Program) |
328 |
OTRC Cooperative Agreement |
008 |
Blowout Prevention Procedures for Deepwater
Drilling |
329 |
Risk Assessment of Temporarily
Abandoned or Shut-in Wells |
009 |
Ultrasonic Flowmeter Evaluation |
330 |
Oil Spill Response - Performance
Review of Booms |
010 |
Subsea Inspection |
331 |
Lifetime Cost of Subsea
Production Systems |
011 |
Portable Data Recorder for USGS inspectors |
332 |
An Engineering Assessment of
Double Wall Versus Single Wall Designs for Offshore Pipelines in an Arctic
Environment |
012 |
Technology Assessment |
333 |
Field Experiments at the Ohmsett
Facility, Especially for a Newly Designed Boom System |
013 |
Fluidic Pulser for Mud Pulse Telemetry |
334 |
Ice Scour & Arctic Marine
Pipeline Workshop |
014 |
Fluidic Sensor for Hydrocarbon & Hydrogen
Sulfide Gas |
335 |
Developing an Industry-Wide
Best-Practice for the Assessment of Spans in Existing Submarine Pipelines |
015 |
Hardhat Communicator |
336 |
Appraisal and Development of
Pipeline Defect Assessment Methodologies |
016 |
Technology Assessment for Outer Continental
Shelf, Oil and Gas Operations in the Arctic Ocean |
337 |
Project Cancelled |
017 |
Fire Suppression Technology |
338 |
Biodegradation of Chemically
Dispersed Oil an Ecosystem Approach |
018 |
Overpressured Marine Sediments |
339 |
Modernization of Tubular
Collapse Performance Properties |
019 |
Hurricane - Driven Ocean Currents |
340 |
Project Cancelled |
020 |
Toxic Effects of Drill Mud on Coral |
341 |
Develop and Improved Methodology
for Pre-drill Pore Pressure and Fracture Gradient Prediction |
021 |
Underwater Acoustic Telemetry |
342 |
Project Cancelled |
022 |
Pattern Recognition Technology |
343 |
Fiber Reinforced Plastics Design
Guideline |
023 |
Incipient Structural Failure by the Random
Decrement Method |
344 |
Durability of Polyester Rope
Moorings |
024 |
Technology Assessment for Estimating
Hydrocarbons Lost During a Blowout |
345 |
Rationalization and Optimization
of Underwater Inspection Planning Consistent With API RP2A Section 14 |
025 |
Overpressures Developed by Shaped Explosive
Charges Used to Remove Wellheads |
346 |
Tailor-Designed Underwater Wet
Welding Process for Offshore Structures and Pipelines in the Gulf of Mexico |
026 |
Detection and Suppression of Wellhead Fires |
347 |
Emulsions Formed at Sea and in
Test Tanks |
027 |
Technology Assessment for Cementing Shallow
Casings |
348 |
Detection and Tracking of Oil
Under Ice |
028 |
Casing Wall Thickness Technology |
349 |
Technology Assessment of the Use
of Dispersants on Spills from MMS-Regulated OCS Facilities |
029 |
Deepwater Structures Technology Assessment |
350 |
Laboratory Study to Compare the
Effectiveness of Chemical Dispersants When Applied Dilute versus Neat |
030 |
Acoustic Imaging Technology for Underwater
Inspection |
351 |
Gas Pipeline Condensate
Allocation Measurement |
031 |
Technology Assessment for Offshore Pile Design |
352 |
Assessment of Current Pipeline
Flushing and Decommissioning Requirements - Research and Field Testing |
032 |
Recapture of Oil from Blowing Wells |
353 |
The Use of Ice Booms for the
Recovery of Oil Spills from Ice Infested Waters |
033 |
Vibration Monitoring of Offshore Structures |
354 |
International Oil and Ice
Workshop |
034 |
Nondestructive Examination (NDE) Round Robin
Test Agent |
355 |
Using Satellite Radar Imagery to
Detect Leaking Abandoned Wells on the U.S. OCS |
035 |
Gas Generator for Powering the Cavitation
Erosion Cleaning Device of Project Number 4 |
356 |
Survey of SCADA System
Technology and Reliability in the Oil and Gas Industry |
036 |
Summary of State of Louisiana's Oil Spill
Regulations and Programs For Platforms and Pipelines Located in State Waters (OPA 90) |
357 |
Assessment of Risks Associated
with Carbon Monoxide Gas During Well Perforation |
037 |
Structural Materials for Arctic Operations |
358 |
Analysis of Pipelines in the Bay
of Campeche Under Directional Seas |
038 |
Statistical Risk Analysis for Determining Best
Available and Safest Technology (BAST) |
359 |
Comparative Risk Analysis of
Deep Water Production Systems |
039 |
Cryogenic Control of Blowing Wells |
360 |
Riser Interaction Model A
Combined T/F Domain Model |
040 |
Mechanical Properties of Sea Ice |
361 |
Numerical Prediction of the
Non-Linear Hydrodynamic Forces and Responses of Flexible Offshore Structures
(VIV) |
041 |
Ultrasonic Inspection of Underwater Structural
Joints |
362 |
Deep Water Anchor Reliability |
042 |
Arctic Underwater Structure Inspection |
363 |
Interdisciplinary Design for
Composite Coiled Tubulars |
043 |
Ice Forces Against Arctic Offshore Structures |
364 |
Ultrasonic NDE of Spoolable
Composite Tubulars |
044 |
Environmental Effects of Wellhead Removal by
Explosives |
365 |
Composite Coiled Tubulars:
Effects of Viscoelasticity |
045 |
Field Study of the Dynamic Response of Single
Piles and Pile Groups in Stiff Clay |
366 |
Dynamic Analysis Tool for Moored
Tanker-Based FPSOs, Including Large Yaw Motions |
046 |
Behavior of Piles and Pile Groups in
Cohesionless Soils |
367 |
Soil Map of Shear Strength for
Shallow Sediments in GOM |
047 |
Study of Method of Design of Piles in Clay
Soils Under Repeated Lateral Loads |
368 |
Response of Tanker Based FPSO to
GOM Hurricanes |
048 |
A Study of Structural and Geotechnical Aspects
of Tension Leg Platforms |
369 |
Polyester Rope Analysis Tool |
049 |
Fitness-for-Service Criteria for Assessing the
Significance of Fatigue Cracks in Offshore Structures |
370 |
Crane Workshop |
050 |
Development and Testing of an Ice Sensor |
371 |
Continued Study of Paraffin
Deposition in Multiphase Flowlines |
051 |
Engineering Properties of Subsea Permafrost |
372 |
State of the Art of Removing
Large Platforms Located in Deep Water |
052 |
Dynamics and Reliability of Compliant Drilling
and Production Platforms |
373 |
Development of a Draft ASTM
Standard on Characterizing Oils for In Situ Burning |
053 |
Behavior of Concrete Offshore Structures in
Cold Regions |
374 |
Measurement of Wind Load
Resistance on Drilling Structures |
054 |
Pile Foundation Design for Ocean Structures |
375 |
Development of Dispersant Test
Protocol at Ohmsett |
055 |
Fracture Analysis and Corrosion Fatigue in
Pipelines |
376 |
Performance of Offshore
Pipelines (POP) |
056 |
Assessment of Structural Icing |
377 |
Project "Deep Spill" |
057 |
Static Lateral Load Tests on Instrumented
Piles in Sand |
378 |
Real-Time Reliability Assessment
of Pipelines |
058 |
Wave Forces on Ocean Structures |
379 |
Type Testing of Check Valves for
Pipeline Isolation Applications, Phase 2 |
059 |
Foundation Stability of Jack-up Platforms |
380 |
Evaluation of the Suitability of
Industry Standards as MMS Requirements |
060 |
Tension Pile Test, Joint Industry Project |
381 |
Identification and
Characterization of Shallow Water Flows Using Seismic Analysis Techniques |
061 |
Superstructure Icing Data Collection and
Analysis |
382 |
Experimental Validation of Well
Control Procedures in Deepwater |
062 |
Southern Bering Sea Production System Study |
383 |
Performance of Deepwater BOP
Equipment During Well Control Events |
063 |
Analytical and Experimental Investigations of
the Behavior of Tubular Frames, Phase III |
384 |
Deepwater Riser Wear Technology |
064 |
Caisson Monitoring Project |
385 |
IUTAM Symposium Scaling Laws in
Ice Mechanics and Ice Dynamics |
065 |
De-icing and Prevention of Ice Formation on
Offshore Drilling Platforms |
386 |
Deepwater Dual-Density Drilling
Workshop |
066 |
Evaluation of Structural Concepts for Norton
Sound |
387 |
Banff/2001 Pipeline Workshop,
April 2001 |
067 |
Rig Mooring Reliability |
388 |
Fire and Blast Information Group
(FABIG) |
068 |
Seafloor Seismic Data Study |
389 |
Characterizing Polyester Rope
Installation Damage |
069 |
Reliability of Gravel Mat Foundations for
Arctic Gravity Structures |
390 |
A Method to Determine Worst Case
Discharges From Facilities That Produce Or Transport Oil in the U.S. Outer
Continental Shelf (OCS) |
070 |
Trace Elements for Detecting Cracking in
Weldments |
391 |
Fire Boom Testing at Ohmsett |
071 |
Assessment of Analysis Techniques for
Compliant Structures |
392 |
International Composites
Workshop |
072 |
Torsional Evaluation of Stiffening Members in
Marine Structures |
393 |
Total Lifecycle Cost Model for
Subsea Multiphase Boosting Operations |
073 |
Soil Flow on Pipelines |
394 |
Interim Damage Criteria for
Replacing Damaged Polyester Rope |
074 |
Drag and Oscillation of Marine Risers and
Slack Cables |
395 |
Extending Temporary Storage
Capacity Offshore With Emulsion Breakers |
075 |
Remote Corrosion Monitoring of Offshore
Pipelines |
396 |
Guidelines of the Definition and
Reporting of Significant Damage to Fixed Steel Offshore Platforms |
076 |
Damage Mechanisms in the Placement and Repair
of Pipelines |
397 |
Severe Slugging Elimination in
Ultra-Deep Water Tiebacks and Risers |
077 |
Ice Stress Measurements |
398 |
Reliability of Pressure Signals
in Offshore Pipelines Leak Detection |
078 |
Structural Concepts for Lease Sale 87 |
399 |
An International Workshop on
Fire and Blast Engineering for the Offshore Industry |
079 |
Offshore Pipeline Transportation Study for
Lease Sale 87 |
400 |
Workshop for ICRARD Meeting |
080 |
Development of a New Philosophy for Effective
Underwater Inspection |
401 |
Second International Workshop on
Human Factors in Offshore Operations |
081 |
Fatigue of Selected High Strength Steels in
Sea Water |
402 |
Workshop on FPSO |
082 |
Numerical Wave Force Simulation |
403 |
Repeatability and Effectiveness
of Subsurface-Controlled Safety Valves |
083 |
Numerical Modeling of Ice-Structure
Interaction |
404 |
Project Offshore Deep slopes
(PODS): Seafloor Stability on the continental Shelf/Slope |
084 |
Surface Oil Spill Containment and Cleanup |
405 |
Determination of the Feasibility
of Thermite Sparking with Aluminum Striking Rusted Steel or Vice-Versa |
085 |
Subsea Collection of Blowing Oil and Gas |
406 |
FPSO Roll Motions |
086 |
ATOS (Antiturbidity Overflow System)
Experiment |
407 |
Damage Tolerance of
Synthetic-Fiber Mooring Ropes; Phase I: Small-Scale Experiments |
087 |
Mechanical Properties of Saline Ice |
408 |
Development of a Blowout
Intervention Method and dynamic Kill Simulated for Blowouts Occurring
Ultra-Deepwater |
088 |
Inspectibility of Tension Leg Platform Tendons |
409 |
Worldwide Assessment of Industry
Leak Detection Capabilities for Single and Multiphase Pipelines (18133) |
089 |
Wave Erosion of a Frozen Berm |
410 |
Deepwater Geohazards Workshop |
090 |
Evaluation of Short, Large-Diameter Piles for
Arctic Applications |
411 |
Manual for Sound Coiled-Tubing
Drilling Practices |
091 |
Underwater Subsea Production System Inspection |
412 |
Underbalanced Drilling Training
for MMS Drilling Engineers |
092 |
A Theoretical Investigation on the Behavior of
Compliant Risers |
413 |
Assessment of the Use of
Dispersants on Marine Oil Spills in California |
093 |
Site-Response, Liquefaction and Soil-Pile
Interaction Studies Involving the Centrifuge |
414 |
3D Finite Element Analysis of
Pipe/Soil Interaction |
094 |
Dynamic Motion Study of a Large Scale
Compliant Platform |
415 |
Asian-Pacific Economic
Cooperation (APEC) Workshop |
095 |
Structural Icing Study, St. George Basin |
416 |
Damaged Polyester Rope-Large
Scale Experiment |
096 |
Probability Based Design Criteria for Ice
Loads on Fixed Structures in the Beaufort Sea |
417 |
Deepwater Field Measurements |
097 |
Engineering Properties of Multi-year Ridge Sea
Ice |
418 |
Risk-Extend CRA for a SPAR-Based
FPSO |
098 |
Punching Shear Resistance of Concrete Offshore
Structures for the Arctic |
419 |
Offloading Operability JIP-
FPSOs |
099 |
Measurement of Ice Stress Around a Caisson
Retained Island in the Beaufort Sea |
420 |
Safe-Flow JIP |
100 |
Feasibility of Production, Loading and Storage
Systems for the North Aleutian Basin |
421 |
Seafloor Slope Stability
Assessment |
101 |
Residual Strength of Offshore Structures After
Damage |
422 |
Earthquake Assessment of Subsea
Facilities/GOM |
102 |
Analysis of Oil-Slick Combustion |
423 |
Foundation/Mooring Risk of FPSOs |
103 |
Ocean Wave Simulation Model |
424 |
Assessment of Subsea Production
and Well Systems |
104 |
Damage Evaluation by System Identification
Techniques |
425 |
New Initiatives for OTRC |
105 |
Chukchi Sea Transportation Cost Comparison
Study |
426 |
Long Term Integrity of
Deep-Water Cement Systems |
106 |
Development of Inspection and Repair Programs
for Fixed Offshore Platforms |
427 |
Dispersant Effectiveness Test
Protocol Development for Ohmsett |
107 |
Offshore Structural Systems Reliability |
428 |
Procedures for Reporting Tests
of Oil Spill Containment Booms and Skimmers |
108 |
An Investigation of the Non-Linear Behavior of
Compliant Risers |
429 |
Oil Platform Removal Using
Engineered Charges: In Situ Comparison of Engineered and Bulk Explosive
Charges |
109 |
Oil Spill Response Equipment Performance
Verification |
430 |
International Offshore Pipeline
Workshop 2003 |
110 |
Response to Spray Ice Structures to Ice,
Atmospheric, and Oceanographic Forces |
431 |
Evaluation of Secondary
Intervention Methods in Well Control |
111 |
Development of a Method to Evaluate the
Tension Capacity of Drilled and Grouted Piles |
432 |
Regional Synthesis of the
Sedimentary Thermal History and Hydrocarbon Maturation in the Deepwater Gulf
of Mexico |
112 |
Project Cancelled |
433 |
Evaluation of Methods of
Detecting and Monitoring of Corrosion Damage in Risers |
113 |
Open Ocean Boom Test |
434 |
Strain-Based Design of Pipelines |
114 |
Field Evaluation of Oil Spill Chemical
Additives |
435 |
Hydrate Flow Performance |
115 |
Hydrodynamic Effects on Design of Offshore
Platforms |
436 |
Chemical Characteristics of an
oil and the Relationship to Dispersant Effectiveness |
116 |
Impact of Annual Ice with a Cable-Moored
Platform |
437 |
Reliability Analysis of
Deepwater Anchors |
117 |
Project Cancelled |
438 |
International Marine Contractors
Association |
118 |
Blast Effects Upon the Environment from the
Removal of Platform Legs by Explosives |
439 |
Multi-Lateral Drilling Seminars |
119 |
Helicopter-Borne Laser Ignition of Oil Spills |
440 |
Development and Assessment of Well Control Procedures for
Extended Reach and Multilateral Wells
Utilizing Computer Simulation |
120 |
Physical Behavior of Oil in the Ocean |
441 |
Physical and Numerical Modeling of Green Water on FPSO's |
121 |
Water Jet Barrier Containment of Oil in the
Presence of Broken Ice |
442 |
Intelligent Systems for Pipeline Infrastructure Reliability (ISPIR) |
122 |
Earthquake Response of a Platform by the
System Identification Technique |
443 |
Technology Assessment of Alternatives for Handling Associated
Gas Produced from Deepwater Oil Developments in the GOM |
123 |
Molikpaq Ice Force Measurement Program |
444 |
Integrity Monitoring for Composite Elements |
124 |
Quality Control Test for Platform Weldment
Fracture Toughness |
445 |
Workshop on Slope Stability by C-Core consultants |
125 |
Seismic Response Analysis of Offshore Pile
Supported Structures |
446 |
ROV/AUV Capabilities |
126 |
Engine Emission Control |
447 |
Qualifying Composite Tendons and Risers |
127 |
A Magneto-Optic Based Flaw Imaging Technique
for Underwater Applications |
448 |
FPSO Roll JIP |
128 |
Response of Piles to Earthquake Ground Motions |
449 |
Effects of Chemically Dispersed and Biodegraded Oils |
129 |
Methodology for Comparison of Alternative
Production Systems |
450 |
Using Dispersants to Test and Evaluate the Effectiveness of
Dispersants in Cold Water and Broken Ice |
130 |
Interference/Clearance Problem of Risers in
Floating Production Systems |
451 |
Global Challenges to Preparedness and Response Regimes
Workshop |
131 |
Erosional/Corrosional Velocity Criterion for
Sizing Multi-Phase Flow Lines |
452 |
Mid-Scale Tests to Determine the Limits to In-Situ-Burning in
Broken Ice |
132 |
Resistance of TLP Tendon Steel to the
Ripple-Load Effect on Stress-Corrosion Cracking |
453 |
Production of a White Paper and Workshop Regarding a Full
Scale Experimental Oil Release in the Barents Sea Marginal Ice Zone |
133 |
Synthetic-Fiber Mooring Lines for Deepwater
Floating Production Facilities |
454 |
Safe Design of Hot On-Bottom Pipelines with Lateral Buckling
(SAFEBUCK) |
134 |
Impact of Crushed Ice on the Ice-Structure
Interaction for Arctic Platforms |
455 |
Review of Shear Ram Capabilities |
135 |
Development of the Raprenox Process of NOx
Control in Diesel Exhausts |
456 |
Techniques to Remove Dissolved Dispersant from Ohmsett Basin
Water |
136 |
Shipboard Navigational Radar as an Oil Spill
Tracking Tool |
457 |
Effect of Oil Spill Containment Boom Characteristics on Boom
Performance |
137 |
NOx Control Workshop |
458 |
Process for the Removal of Spent Oil Spill Dispersants from
Test Water at Ohmsett |
138 |
NOx Control Development Program |
459 |
Comparative Risk Assessment of the Decommissioning Options
for Large Platforms in the POCSR |
139 |
Operational RIGMOOR |
460 |
Banff/2003 Pipeline Workshop |
140 |
Wind Loads and Wind/Wave Interaction on
Compliant Offshore Structures |
461 |
Characterizing Natural Gas
Hydrates in the Deepwater Gulf of Mexico |
141 |
Nipterk Spray Ice Island-Summer Protection
Experiment |
462 |
Surface BOP Workshop |
142 |
Leak Detection and Monitoring of Pipelines |
463 |
Evaluation of Sheer Ram
Capabilities |
143 |
Testing and Evaluation of Damaged Jacket
Braces |
464 |
Development of Integrity
Methodologies for the Topsides of Offshore |
144 |
Fatigue of High Strength Steels for Innovative
Offshore Structures |
465 |
22nd International Offshore
Mechanics and Arctic Engineering Conference (OMME) |
145 |
Response Prediction Techniques for Risers in
Sheared Currents |
466 |
Validation and Calibration of
API-RP-2A Using Hurricane Lili to Update the Hurricane Andrew JIP Results
that provided the basis for API Section 17. |
146 |
Safety of Existing Steel Jacket Platforms |
467 |
Hind Cast Study of Winds, Waves,
and Currents in N. GOM in Hurricane Lili (2002) |
147 |
Method for Predicting Hydrodynamic Damping for
Offshore Structures |
468 |
Construction and Maintenance of
Ice Islands: Current practice & future research. |
148 |
Reasonably Available Control Technology (RACT)
Measures for the California Outer Continental Shelf |
469 |
Post Mortem Failure Assessment
of Drilling Rigs During Hurricane Lili |
149 |
Workshop on Reliability of Offshore Operations |
470 |
International Workshop on
Advances Research & Development of Coatings for Corrosion Protection of
Offshore Oil and Gas Facilities, Marine Pipelines and Ship Structures: Life
of coating materials, Repair of coatings and NDE. |
150 |
Floating Vessel Blowout Control |
471 |
Assessment of Performance of
Deepwater Floating Production Facilities |
151 |
Investigation of Simulated Oil Well Blowout
Fires |
472 |
Project Offshore Deep Slopes
(PODS) - Phase II |
152 |
Recovery Methods for High Viscosity Oils |
473 |
Integration of Human factors
within Safety Assessment and Management with Specific Reference to Human
Limitations in Response to Automated data inputs from Control Room
Management & Monitoring Systems |
153 |
Alaska Arctic Workshop |
474 |
Evaluation of Safety Concerns
during Well Testing from OCS Drilling Rigs by Det Norske Veritas (Houston
Branch) |
154 |
Development of Improved Oil Spill Remote
Sensing Techniques |
475 |
Workshop on Deepwater Drilling:
Where are we headed? by International Association of Drilling Contractors
|
155 |
Identification of Substitute Test Facilities
for OHMSETT |
476 |
Ohmsett 2003 Cold Water
Dispersant Effectiveness Experiments |
156 |
World Catalog of Oil Spill Response Products |
477 |
Correlating Results of
Dispersants Effectiveness at Ohmsett with Identical At-Sea Trials: Effects
of Oil Viscosity and Dispersant to Oil Ratio |
157 |
Development of an Airborne Oil Spill Thickness
Sensor |
478 |
Development of a Standard Method
for Measuring the Buoyancy-to-Weight Ratio for Oil Spill Containment Boom |
158 |
Development and Evaluation of Shoreline
Cleanup Techniques |
479 |
Deep-Sea Furrows |
159 |
Evaluation of Skimmers for Offshore and
Ice-Infested Waters |
480 |
An Assessment of Safety, Risks
and Costs Associated with Subsea Pipeline Removals |
160 |
Study of Oil Spill Chemical Treating Agents |
481 |
Deepwater Riser VIV Project |
161 |
Development of a New Generation Laser
Fluorosensor |
482 |
VIM/SPAR Industry Forum |
162 |
Development of a Portable Oil Analysis Kit for
Responders |
483 |
VIV/CFD Analysis Project |
163 |
Preparation a Test Protocol for Offshore Oil
Skimmers and Containment Booms |
484 |
Oceanic Turbulence Project
(Ocean Turbulence Loads and Effects on Offshore
Structures) |
164 |
Chukchi Sea Transportation Update Study |
485 |
VIV Pipeline Span/Riser Training
Seminar |
165 |
Deepwater Pipeline Maintenance and Repair |
486 |
Fate of Emulsion Breakers Used
for Decanting |
166 |
Seismic Response Characteristics for Topside
Facilities |
487 |
An Assessment of Magnetization
Effects on Hydrogen Cracking for Thick Walled Pipelines |
167 |
Management of Human Error in Operations of
Offshore Facilities |
488 |
Global Analysis of FPSO and
Shuttle Tanker During Offloading |
168 |
International Workshop on Pipeline Safety |
489 |
Project Cancelled |
169 |
Capacity Analysis Program for Verification of
Fixed Platforms |
490 |
CRA for Composite Drilling and
Production Risers |
170 |
Improved Means of Offshore Platform Fire
Resistance |
491 |
Risk Assessment for Submarine
Slope Stability |
171 |
International Workshop on the Seismic Design
and Requalification of Offshore Platforms |
492 |
Reliability of Subsea Systems |
172 |
Methodology for Assessing the Structural
Integrity of Existing Platforms Subject to Seismic Loading |
493 |
Understanding Oil Spill
Dispersants: Efficacy and Effects |
173 |
Methodology for Formal Safety Assessment of
the Topsides of Offshore Production Facilities |
494 |
New Touch-Down Zone Solutions
for Steel Catenary Risers (SCRs) |
174 |
Assessment of Seafloor Earthquake Ground
Motions |
495 |
Risk Assessment and Evaluation
of the Conductor Pipe Setting Depth On Shallow Water Depths |
175 |
Assessment of New Methods for Rapid Leak
Detection in Offshore Pipelines |
496 |
Design of Cathodic Protection
Systems for Deep Water Compliant Petroleum Production Risers
|
176 |
Development of a Management and Assessment
Program for Offshore Oil and Gas Pipelines |
497 |
Probabilistic Reliability and
Integrity Assessment of Large-Diameter Compliant Risers for Ultra-Deepwater
Operations |
177 |
Offshore Platform Database and Performance
Evaluation System |
498 |
Performance Validation of API
Tubing and Casing Connections |
178 |
Large-scale Ice Fracture Experiments |
499 |
Development of Recommended
Practices for Allocation Measurement |
179 |
Raprenox Exhaust Gas Treatment Process for NOx
in Gas Turbine Engines |
500 |
Risk Comparison of Subsea versus Surface Processing |
180 |
Testing and Evaluation of Sorbents |
501 |
Wet / Gas Multiphase Flow
Measurement Testing Protocol and Reference Uncertainty Database |
181 |
Assessment of Spray Ice Technology |
502 |
Assessment of New and / or
Improved Repair Techniques for Ageing or Damaged Structures |
182 |
Testing and Evaluation of Grout Repaired
Tubular Members |
503 |
Evaluate and Compare Hurricane-Induced Damage
to Offshore Pipelines for Hurricane Lili – Rev. A |
183 |
Further Investigation into Capacity Analysis
Procedures |
504 |
Effectiveness of Spanning and VIV Mitigation
for Subsea Pipelines |
184 |
International Workshop on Pile Foundation |
505 |
Step Changes in Drilling Technology 2004 Workshop |
185 |
International Workshop on Composite Materials
for Offshore Operations |
506 |
Analysis of IFO-180 and IFO-380 Oil Properties for Dispersant Window of
Opportunity |
186 |
Hydrodynamic Damping and Combined Motion
Loading (HYDAMP II) |
507 |
Correlating Results of Ohmsett Dispersant Test with At-Sea Trials: Workshop
to Coordinate Publications and Prioritize Follow-up Research |
187 |
Analytical Simulation of Biased Loaded Tension
Piles in Earthquakes |
508 |
Workshop on Sustained Casing Remediation Practices |
188 |
Model Design Code Development for Floating
Structures |
509 |
Interstitially Insulated Pipe |
189 |
Strengthening Modifications and Repair
Techniques |
510 |
Seafloor Interaction with Steel Catenary Risers |
190 |
Fatigue Strength of Grouted Connections |
511 |
Tailored Polymeric Materials for Oil Spill Recovery in Marine Environments |
191 |
Pressure Ridge Ice Scour Experiment (PRISE) |
512 |
Transfer of Decanting Technology Research to Oil Spill Response
Organizations and Regulators |
192 |
International Workshop for Requalification of
Offshore Structures |
513 |
Laboratory Testing to Determine Dispersion Predictability of
the Baffled Flask Test (BFT) and Swirling Flask Test (SWT) |
193 |
Study and Hindcast of Wind and Wave Fields for
Hurricane Andrew |
514 |
Dispersant Effectiveness Testing on Heavy OCS Crude Oils at Ohmsett |
194 |
Calibration of Mooring Design Code for
Floating Drilling and Production Platforms |
515 |
Wave
Field Characterization at the Ohmsett Wave Test Basin |
195 |
Shallow Gas Broaching |
516 |
Development of a Method to Produce Large Quantities of Realistic
Water-In-Oil Emulsions for use in Evaluating Oil Spill Response Equipment
and Methods |
196 |
Sea Ice Scaling Effects |
517 |
New and Innovative Equipment and Technologies for the Remote
Sensing and Surveillance of Oil in and Under Ice |
197 |
Residual Strength of Dented and Corroded
Pipelines |
518 |
Workshop on the Issue of Prevention: What are the Next Challenges? |
198 |
Offshore Pipeline Abandonment Study |
519 |
Drilling and Completion Gaps for High Temperature and High Pressure In Deep
Water |
199 |
Hurricane Andrew Calibration Study |
520 |
Project Canceled
Summary Report of Activities at the Minerals Management Service Ohmsett
Facility |
200 |
Securing Procedures for Mobile Drilling Units
(MODU's) in the Gulf of Mexico |
521 |
Project Canceled
Riser VIV Workshop |
201 |
Evaluation of Hurricane Pipeline
Damage |
522 |
Methodologies for Measuring and Monitoring Hydrogen for Safety in Advanced
High Strength Linepipe Steel Applications. |
202 |
Methodologies for Platform Requalifications |
523 |
Drilling Engineering Association (DEA) Technology Workshop |
203 |
Performance of Safety and Pollution Control
Devices in the Aftermath of Hurricane Andrew (Part of the Hurricane Andrew OCS Damage
Assessment Program) |
524 |
IADC workshop on “Offshore Logistics” Conference |
204 |
Post Mortem Platform Failure Evaluation Study |
525 |
Hydrotest
Alternative JIP – For Deepwater Gas Export Pipelines |
205 |
Post Mortem Platform Failure Study |
526 |
Correlate Ohmsett Dispersant Tests with At Sea Trials; Supplemental Tests to
Complete Test Matrix |
206 |
Shallow Water Wave and Current Field Study |
527 |
The Effect of Warming Viscous Oils Prior to Discharge on Dispersant
Performance |
207 |
API/Hurricane Foundation Study |
528 |
Optimization of Oleophilic Skimmer Recovery |
208 |
Underwater Welding Development Program |
529 |
Analysis of Dispersant Effectiveness of Heavy Fuel Oils and Weathered Crude
Oils at Two Different Temperatures Using the Baffled Flask Test |
209 |
Development of Acceptance Criteria for Caisson
Structures Damaged During Hurricane Andrew |
530 |
SCR Flex Joint Design and
Performance JIP |
210 |
Hurricane Andrew Effects on Offshore Platforms |
531 |
SCR Integrity Management JIP |
211 |
Architect and Engineering Services |
532 |
Deepwater GOM Pipeline Damage Characteristics and Repair Options |
212 |
Deep Water Subsea Conceptual Studies, Phase 1 |
533 |
Development of Accurate Sampling Methods and Methods for Monitoring Water
Vapor in Natural Gas Streams |
213 |
Design and Reassessment of Tubular Joints in
Offshore Structures, Phase 4 |
534 |
Development of Accurate Methods for Predicting Hydrocarbon Dew Points |
214 |
Ground Motion Attenuation Equations for Basin
Environments |
535 |
Accuracy of Liquid Level Sensors |
215 |
Study into the Strength Reliability of
Offshore Structures |
536 |
Vertical Access Riser Comparative Risk Assessment |
216 |
SPAR Development Model Test Program |
537 |
A Study of Underwater
Gaseous Explosions |
217 |
A Guide for Risk Assessment of Offshore
Platforms |
538 |
Measurement and Control Underwater Noise from Oil
Drilling and Production Operations |
218 |
International Workshop on Underwater Welding |
539 |
Eliminating Annular Flow after Cementing in Offshore Gulf of Mexico |
219 |
Application of an Engineering Model for
Ice/Soil/Pipeline Interaction |
540 |
Risk Assessment of Surface vs. Subsurface BOP's on Mobile
Offshore Drilling Units |
220 |
Study of Human Factors in
Offshore Operations |
541 |
Application of Dual
Gradient Technology to Top Hole Drilling |
221 |
Risk-Based Optimization of
Pipeline Integrity Maintenance Activities |
542 |
Dispersant Effectiveness Testing on Realistic Emulsions at Ohmsett |
222 |
Probabilistic Seismic Hazard
Analysis for Offshore Platforms in the Santa Barbara Channel |
543 |
Development of Recommended API Practice for Structural Integrity Management
of Fixed Offshore Platforms (JIP) |
223 |
An Information Management System
for the Reassessment of Offshore Platforms |
544 |
Real-time Detection of Oil Slick Thickness
Patterns with a Portable Multispectral Sensor |
224 |
Dynamic Non-linear Loading
Effects on Offshore Platforms |
545 |
Calm Sea Application of Dispersants |
225 |
Development of Evaluation
Guidelines for Offshore Platform Topsides in Seismic Regions |
546 |
Chemical Dispersibility of OCS Crude Oils in Non-Breaking Waves, Part 1
Determining the Limiting Oil Viscosity for Dispersion in Non-Breaking |
226 |
Hydrates of
Hydrocarbons--Practical Implications |
547 |
Developing New and Innovative Equipment and Technologies for the Remote
Sensing and Surveillance of Oil in and Under Ice - Phase 2 |
227 |
Development of Grouted Tubular
Joint Technology for Offshore Strengthening and Repair |
548
|
Examination and Review of Mobile Offshore Drilling Unit (MODU) Loss of
Station-keeping Ability During Hurricane Ivan and Assessment of Current
Mooring Standards and Criteria to Prevent Similar Failures |
228 |
International Workshop on Damage
to Underwater Pipelines |
549 |
Assessment of Fixed Offshore Platforms in Hurricane Ivan, Andrew and Lili |
229 |
Hurricane Andrew Effects on
Offshore Platforms (Phase II - JIP) |
550 |
A Pilot Study for Regionally-Consistent Hazard Susceptibility Mapping of
Submarine Mudslides, Offshore Gulf of Mexico |
230 |
Support for the Composites
Engineering and Applications Center (CEAC) for Petroleum Exploration and
Production |
551 |
Assessment of Drilling and Workover Rig Storm Sea Fastenings on Offshore
Floating Platforms During Hurricane Ivan |
231 |
Sea Ice Mechanics Workshop |
552 |
Mudslides during Hurricane Ivan and an Assessment of the Potential for
Future Mudslides in the Gulf of Mexico |
232 |
Investigation of New Techniques
for Abandonment of Offshore Structures |
553 |
Pipeline Damage Assessment
from Hurricane Ivan |
233 |
DNR-MMS Louisiana Offshore
Pipeline and Platform Map |
554 |
Mid-Scale Test Tank Research On Using Oil Herding Surfactants To Thicken Oil
Slicks In Broken Ice |
234 |
Lease Abandonment: Technology,
Environmental Effects and Regulation (Lease Abandonment Workshop) |
555 |
Partnering in a Workshop to Determine the Scope of an Experimental Oil Spill
in Pack Ice in Canada |
235 |
Summary of State of Louisiana's
Oil Spill Regulations and Programs For Platforms and Pipelines Located in
State Waters (OPA 90) |
556 |
Risk Assessment of Submarine Slope Stability - Hydroplaning |
236 |
Development and Testing of the FLAIM (Fire and
Life Safety Assessment Indexing Model) for Evaluating the Safety of Offshore Platforms and
Marine Loading Terminals |
557 |
Numerical Modeling of Torpedo Anchors |
237 |
Behavior of Suction Caisson Foundations |
558 |
Composite Repair Methods
for Steel Pipes |
238 |
Recommended Procedure for Design of
Drag-embedment (Fluke) Anchors |
559 |
Offshore Hurricane Readiness & Recovery Conference |
239 |
Paraffin Deposition Prediction in Multiphase
Flowlines and Wellbores |
560 |
Project Canceled
Performance of Deepwater Production Platforms |
240 |
Development of a Frequency Scanning Radiometer
to Measure Oil Slick Thickness, Phase II |
561 |
Project Canceled
LNG Process Safety Design |
241 |
Assessment of Tubular Steel Joints in Existing
Offshore Structures |
562 |
Recommended Practice on Sampling and Analysis of High Water Content Streams |
242 |
Retrofit Cathodic Protection of Marine
Pipelines Associated with Petroleum Production |
563 |
Understanding the Effects of Time and Energy on the Effectiveness of
Dispersants |
243 |
Cathodic Retrofits for Offshore Structures |
564 |
Full Scale Monitoring Marco Polo JIP |
244 |
Testing of Fire Resistant Booms in Waves and
Flames |
565 |
Guidelines for the Integrity Assessment methods of Piggable and Unpiggable
Pipelines in the Gulf of Mexico |
245 |
Homopolar Welding of Offshore Pipelines |
566 |
Assessment of the Acceptability and safety of Using Equipment, Particularly
BOP and Wellhead Components at Pressures in Excess of the Rated Working
Pressure |
246 |
Reliability-based Reassessment of Jacket
Platforms |
567 |
Synthetic Based Drilling Fluid
Droplet Survey |
247 |
Numerical Modeling of Oil Boom Behavior and
Rapid Current Boom Development |
568 |
Research at Ohmsett on the Effectiveness of Chemical Dispersants on Alaskan
Oils in Cold Water |
248 |
Programming, Digitizing, and Data Entry of
Pipelines for the Gulf of Mexico, OCS and Louisiana State Waters |
569 |
Svalbard, Norway Experimental Oil Spill To Study Spill
Detection and Oil Behavior in Ice |
249 |
Control of Natural Gas Hydrates |
570 |
Measurement of the Effect of Depth Below Mudline of Charge Placement During
EROs |
250 |
International Workshop on Use of Human &
Organizational Factors (HOF) in the Management of Safety and Environmental Hazards for
Offshore Operations and Facilities |
571 |
Loads due to Extreme Wave Crests |
251 |
International Workshop on Advanced Material
for Marine Structures |
572 |
Deepwater Riser Fatigue Life, Modeling & Standard Study |
252 |
Novel Hydrate Prediction Methods
for Drilling Fluids |
573 |
Oil Recovery with Novel Skimmer Surfaces under Cold Climate Conditions |
253 |
Blowout Preventer Study |
574 |
No MODUs Adrift
|
254 |
Pipeline Reliability Assessment |
575 |
Torpedo Piles for Gulf of Mexico Applications |
255 |
Development Studies of Mud
Converted to Cement |
576 |
Measurement of the Effect of Magnetism on Hydrogen Cracking Susceptibility
of Pipeline Steels |
256 |
ASCE Pipeline Workshop |
577 |
Design Options for Offshore Pipelines in the US Beaufort
and Chukchi Seas |
257 |
Project Cancelled |
578 |
Assessment of Fixed Offshore Platform Performance in Hurricanes Katrina and
Rita |
258 |
API Benchmark Structure |
579 |
Joint Industry Project to Study Risk-Based Restarts of Untreated Subsea Oil
and Gas Flowlines in the GOMR |
259 |
Laboratory Testing to Determine
Operational Parameters for In Situ Burning of U.S. OCS Crude Oil Spills |
580 |
Hindcast Data on Winds, Waves and Currents in Northern Gulf of Mexico in
Hurricanes Katrina and Rita (2005) |
260 |
1997 Pipeline Workshop |
581 |
Pipeline Damage Assessment from Hurricane
Katrina/Rita |
261 |
Integrity Assessment for Aging
Structures--Evaluation and Improving the Effectiveness of Ultrasonic Testing |
582 |
A Probabilistic Approach to Risk Assessment of Managed
Pressure Drilling in Offshore Drilling Applications |
262 |
Analytical and Experimental
Investigations of the Behavior of Tubular Frames, Phase III |
583 |
Characterizing Material Performance for Design of Sour Service HPHT
Equipment in Accordance with API RP 6HP Practices |
263 |
Underwater Welding Development
Program, Phase II |
584 |
Arctic Offshore Technology Assessment of Exploration and Production Options
for Cold Regions of the US Outer Continental Shelf |
264 |
Development of Improved Drill
String Safety Valve Design and Specifications |
585 |
Mitigating Oil Spills from Offshore Oil and Gas Activities by Enhancement of
Oil-Mineral Aggregate Formation |
265 |
Reliability of Corroded
Pipelines |
586 |
Planning Support for an Experimental Oil Spill in Pack Ice |
266 |
Support of the Offshore
Technology Research Center |
587 |
International Oil in Ice Workshop 2007 |
267 |
Development, Testing and
Evaluation of an Explosive Shock Wave Focusing Tool with Minimum Explosive
Weight |
588 |
Detection of Oil on and Under Ice - Phase 3 |
268 |
Second International Conference
on Composite Materials for Offshore Operations |
589 |
Investigation of the Ability to Effectively Recover Oil Following Dispersant
Application |
269 |
Assessment and Analysis of
Unsupported Subsea Pipeline Spans |
590 |
Changes with Dispersant Effectiveness with Extended Exposure
in Calm Seas |
270 |
Decommissioning of Oil and Gas
Facilities Offshore California Workshop |
591 |
Evaluate Accuracy of Polyester Subrope Damage Detection
Performed by ROVs Following Hurricanes and Other Events |
271 |
Safety and Integrity of Arctic
Marine Pipelines |
592 |
Project Cancelled |
272 |
Allowable Leakage Rates for
Safety and Pollution Prevention Equipment |
593 |
Evaluate and assess the performance of jackup rigs that were subject to
Hurricanes Katrina or Rita |
273 |
Strengthening, Modification and
Repair Techniques for Offshore Platforms--Phase II |
594 |
Development of a Portable Multispectral Aerial Sensor for Real-time Oil
Spill Thickness Mapping in Coastal and Offshore Waters |
274 |
Assessment Criteria and Reserve
Strength of Tubular Joints--Phase II |
595 |
Identification of Window of Opportunity for Chemical
Dispersants on Gulf of Mexico Crude Oils |
275 |
Riser Reliability Analysis |
596 |
Sea Spray Icing of Drilling and Production Platforms |
276 |
Mitigating the Problem of Gas
Migration After Primary Cementing |
597 |
Assessment of Superstructure Ice Protection As Applied to Offshore Oil
Operations Safety |
277 |
Structural Integrity Assessment
and Repair of Corrosion-Damaged Offshore Platform Tubulars |
598 |
Upgrade of SMART Dispersant Effectiveness Monitoring Protocol |
278 |
Natural Gas Sampling Program |
599 |
Joint Industry Project to Quantify Risks in Deepwater
Production Facilities and Flowlines in the GOM |
279 |
Assessment of the Feasibility
for the Application of Threaded Connectors in Offshore Platform Caissons |
600 |
A Review and Update of Supplemental Bonding Requirements in the Gulf of
Mexico |
280 |
Risk Assessment for Dry Tree
Tieback Alternatives Study |
601 |
Seabed Scour and Buried-Pipeline Deformation Due to Ice Ridges |
281 |
Assessment of the Effects of
Damage and Repairs of Existing Gulf of Mexico Platforms |
602 |
Cement Fatigue and HPHT Well
Integrity with Application to Life of Well Prediction |
282 |
International Workshop on Marine
Pipeline Safety Assessment and Risk Management |
603 |
Stability of Tension Leg Platforms with Damaged Tendons |
283 |
Comparative Evaluation of
Minimum Structures and Jackets |
604 |
Evaluation of Fatigue Life Models and Assessment Practice for
Tension Leg Platforms (Phase 1: Tendon System Fatigue) |
284 |
Investigation of Hybrid Deep
Water Production Systems |
605 |
Cooperative Research on Extreme Seas and their
Impact to Floating Structures |
285 |
Assessment and Reliability of
Production and Tubing Design |
606 |
Hybrid Well Riser Risk of Failure and Prevention |
286 |
Project Cancelled |
607 |
Assessing Risk and Modeling a Sudden Gas
Release Due to Gas Pipeline Ruptures |
287 |
Fate and Behavior of Deepwater
Subsea Oil Well Blowouts in the Gulf of Mexico |
608 |
Methods to Reduce Lateral Noise Propagation from Seismic Exploration Vessels |
288 |
Outdoor Wave Tank and Program of
Mid-Scale In Situ Burn Testing in Alaska |
609 |
Reliability vs. Consequence of Failure for
API RP2A Platforms Using RP2MET |
289 |
Re-Engineering of a Stainless
Steel Fireproof Boom for Using in Conjunction with Conventional Firebooms |
610 |
Marco Polo JIP Extension 2008 - 2009
Full-Scale Monitoring Marco Polo TLP |
290 |
Project Cancelled |
611 |
JIP for the Development of Standardized Testing Requirements
for HPHT Equipment |
291 |
Technology Assessment and
Concept Evaluation for Alternative Approaches to In Situ Burning of Oil in
the Marine Environment |
612 |
Analysis of Conservatism in Offshore Foundation Design |
292 |
ULTIGUIDE Phase 2 |
613 |
Development of a Training Package on the Use of Chemical Dispersants for
Ohmsett - The National Oil Spill Response Test Facility |
293 |
Scour and Arctic Marine Pipeline
Workshop |
614 |
ISO 13628-12 / API RP 2RD Dynamic Risers
for Floating Production Installations JIP |
294 |
Statistical Analysis of MMS
Inspection and Accident Data |
615 |
Chemical Dispersant Research at Ohmsett |
295 |
In Situ Clean up of Oiled
Shorelines; Svalvard Shoreline Project |
616 |
Tulsa University Drilling Projects (TUDPs) |
296 |
Chemical Response to Oil Spill:
Ecological Effects Research Forum (CROSERF) |
617 |
Employing Chemical Herders to Improve Oil Spill Response Operations |
297 |
Comprehensive Spill Response
Tactics for the Alaska North Slope-Oil in Broken Ice Spill Response
Scenarios |
618 |
Comparative Study of Offshore Wind Turbine
Generators (OWTG) Standards |
298 |
Testing at Ohmsett to Determine
Optimum Times to Decant to Temporary Storage Devices |
619 |
Subject An Interactive Met-Ocean Geographical
Information System (GIS) with Applications for Data Query and Statistical
Analysis |
299 |
Estimation of Towing Forces on
Oil Spill Containment Booms |
620 |
Collection and Archival of Environmental Data
Relevant to Design of Arctic Structures |
300 |
Coiled-Tubing and Slim-Hole
Technology, DEA-67 Phase III |
621 |
High Pressure High Temperature (HPHT) Elastomer Evaluation |
301 |
Revision of Orifice Metering
Standard |
622 |
Impact of Marine Growth on Pipeline Risers for Floating Facilities JIP |
302 |
University of Tulsa Fluid Flow
Projects (TUFFPs) |
623 |
Evaluation of High Integrity Pressure Protection System (HIPPS) |
303 |
Coriolis Massmeter Data Analysis
Program |
624 |
Beaufort and Chukchi Sea Ice Design Criteria |
304 |
Avoidance of Vibration Fatigue
Failure in Process Piping Systems |
625 |
Oil Spill Training and Response (STAR) Calculator Program |
305 |
Highly Compliant Rigid-Pipe
Riser Analysis |
626 |
Evaluation of Satellite Data in Determining Pollution Resulting from Damage
to the Oil & Gas Industry Infrastructure of the GOM |
306 |
Low Viscosity Fluids for
Plugging Microfine Fractures |
627 |
Assess/Develop Inspection Methodologies for Offshore Wind Turbine Facilities |
307 |
Optimization of Horizontal Well
Completion |
628 |
Assess the Design/Inspection Criteria/Standards for Wave
and/or Current Energy Generating Devices |
308 |
International Workshop on
Advanced Methods of Corrosion Mitigating for Marine Structures |
629 |
Assess the Design and Inspection Criteria and Standards for Wave and Current
Energy Generating Devices |
309 |
Development of an OHMSETT
Activity Summary Report |
630 |
Risk Assessment for Pipelines in Deepwater (RAPID) JIP |
310 |
Mechanical Oil Recovery in Ice
Infested Waters (MORICE) - Phase III |
631 |
Risk Profile of Dual Gradient Drilling
|
311 |
Oil Spill Containment, Remote
Sensing, and Tracking from Deep Water Blowouts Status of Existing and
Emerging Technologies |
632 |
Evaluate New Materials for Deepwater Synthetic Mooring Systems
|
312 |
Laboratory Testing to Determine
In Situ Burning Parameters for Six Additional U.S. OCS Crude Oil |
633 |
Wind Farm/Turbine Accidents and the Applicability to Risks to Personnel and Property on the OCS, and Design Standards to Ensure Structural Safety/Reliability/Survivability of Offshore Wind Farms on the OCS |
313 |
Large-Scale Modeling of Pipeline
Soil Interaction Under Lateral & Axial Loading |
634 |
Mitigation of Underwater Pile Driving Noise During Offshore Construction |
314 |
Continued Development of
Earthquake Load and Resistance Factor Design Guidelines |
635 |
Literature Review on Chemical Treating Agents in
Fresh and Brackish Water |
315 |
Engineers Design Guide to
Deepwater Fiber Moorings |
636 |
Characteristics, Behavior and Response
Effectiveness of Spilled Dielectric Insulating Oil in the Marine Environment |
316 |
Reliability Study for Synthetic
Moorings |
637 |
Validation of the Two Models Developed to
Predict the Window of Opportunity for Dispersant Use in the Gulf of Mexico |
317 |
Deep Water Pipeline Repair
Methods |
638 |
Chemical Dispersant Research at Ohmsett: Phase 2 |
318 |
Banff/99 Pipeline Workshop |
639 |
Decommissioning: Fixed and Floating Platform
Removal and Disposition |
319 |
Reliability of Subsea Blowout
Preventer Systems for Deepwater Applications--Phase II |
|
|
320 |
Risk Assessment for Ice Damage
to Seabed Facilities |
|
|
321 |
Risk Assessment and Management
Based Criteria for Requalification of Marine Pipelines |
|
|
Privacy |
Disclaimers |
Accessibility |
Topic Index | FOIA
Last Updated:
04/07/2009,
08:34 AM
|