Hondo Field / Santa Ynez Unit |
PLATFORM
HONDO |
(Lease OCS-P 0188) |
Installed:
06-23-76 |
Well Slots: 28 |
Location:
Santa Barbara Channel |
Water Depth: 842' |
First Production:
04-02-81 |
|
Cum. Oil Production: 167,391,696 bbls |
Cum. Gas Production: 344,264,897 mcf |
District:
California |
Distance to Land: 5.1 miles |
PLATFORM
HARMONY |
(Lease OCS-P 0190) |
Installed:
06-21-89 |
Slots: 60 |
Location:
Santa Barbara Channel |
Water Depth: 1,198' |
First Production:
12-30-93 |
|
Cum. Oil Production: 76,846,139 bbls |
Cum. Gas Production: 136,645,596 mcf |
District:
California |
Distance to Land: 6.4 miles |
SANTA YNEZ OS&T |
(Lease OCS-P 0188) |
Installed:
03-03-81 |
Slots: N/A |
Removed:
06-03-94 |
Water Depth: 500' |
Location:
Santa Barbara Channel |
First Production:
N/A |
|
Cum. Oil Production:
N/A |
Cum. Gas Production:
N/A |
District:
California |
Distance to Land: 3.9 miles |
Note: This vessel processed crude from Platform
Hondo until the installation
of the Las Flores onshore processing plant. |
Pescado Field / Santa Ynez Unit |
PLATFORM HERITAGE |
(Lease OCS-P 0182) |
Installed:
10-07-89 |
Well Slots: 60 |
Location:
Santa Barbara Channel |
Water Depth: 1,075' |
First Production:
12-18-93 |
|
Cum. Oil Production: 105,712,220 bbls |
Cum. Gas Production: 135,709,208 mcf |
District:
California |
Distance to Land: 8.2 miles |
|
* The cumulative production listed in this
table is as of March 2003. |