Home > Nuclear Reactors > Operating Reactors > Licensing > Power Uprates
> Pending Applications
Pending Applications for Power Uprates
The following power uprates are currently under review by the NRC. The licensees for the following plants have not been
authorized by the NRC to operate the plants at power levels that reflect the following increases.
(TYPE -- S = Stretch; E = Extended; MUR= Measurement Uncertainty Recapture)
(TBD = To Be Determined)
NO. |
PLANT |
% UPRATE |
MWt |
SUBMITTAL DATE |
PROJECTED COMPLETION DATE |
TYPE |
1 |
Browns Ferry 2 |
15 |
494 |
06/25/2004 |
Spring 2009 |
E |
2 |
Browns Ferry 3 |
15 |
494 |
06/25/2004 |
Spring 2010 |
E |
3 |
Browns Ferry 1 |
15 |
494 |
06/28/2004 |
Spring 2009 |
E |
4 |
Calvert Cliffs 1 |
1.4 |
37 |
08/29/2008 |
March 2009 |
MUR |
5 |
Calvert Cliffs 2 |
1.4 |
37 |
08/29/2008 |
March 2009 |
MUR |
6 |
Monticello |
12.9 |
229 |
11/05/2008 |
December 2009 |
E |
|
Total MWt |
|
1785
|
|
|
|
|
Total MWe |
|
595 |
|
|
|
|