skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Palo Verde 2

3Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned scrams 0 0 0 0 1.0 0 1.0 0
Critical hours 1170.1 2016.8 2184.0 2208.0 2069.1 2112.0 687.6 2208.0
                 
Indicator value 0.9 0.9 0.9 0 0.8 0.8 2.0 2.0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Unplanned power changes 0 2.0 1.0 1.0 0 0 0 0
Critical hours 1170.1 2016.8 2184.0 2208.0 2069.1 2112.0 687.6 2208.0
                 
Indicator value 0 1.9 2.8 3.7 3.3 1.6 1.0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value       0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 1
                 
Indicator value 0 0 0 0 0 0 0 1

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 1.10E-07 1.80E-07 1.60E-07 1.30E-07 7.80E-08 1.20E-07 1.40E-07 1.30E-07
URI (ΔCDF) 6.70E-07 6.70E-07 4.70E-07 4.70E-07 -3.70E-07 -2.20E-07 -2.20E-07 -2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 7.80E-07 8.50E-07 6.30E-07 6.00E-07 -2.92E-07 -1.00E-07 -8.00E-08 -9.00E-08

Licensee Comments:

2Q/07: First Quarter 2007 Emergency AC Power comment resolved: Evaluation of November 2005 partial fouling of the Unit 2 B EDG fuel oil strainer did not result in a MSPI failure to run. No change to data.

1Q/07: Unreported November 2005 partial fouling of the Unit 2 B EDG fuel oil strainer is being reviewed against MSPI failure criteria.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 3.60E-08 4.70E-08 4.50E-08 4.50E-08 1.70E-08 1.50E-08 1.50E-08 2.50E-09
URI (ΔCDF) -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 -1.50E-08 -1.50E-08 -1.50E-08 -1.50E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.80E-08 -2.70E-08 -2.90E-08 -2.90E-08 2.00E-09 0.00E+00 0.00E+00 -1.25E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 2.10E-07 2.70E-07 2.90E-07 1.40E-07 6.40E-08 2.20E-08 2.00E-08 -4.70E-08
URI (ΔCDF) -6.10E-07 -6.10E-07 -6.00E-07 -6.00E-07 -2.20E-07 -2.20E-07 -2.20E-07 -2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -4.00E-07 -3.40E-07 -3.10E-07 -4.60E-07 -1.56E-07 -1.98E-07 -2.00E-07 -2.67E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 2.00E-08 1.40E-08 1.30E-08 9.90E-10 -4.40E-10 -3.30E-09 -3.10E-09 -6.90E-10
URI (ΔCDF) 1.30E-08 1.30E-08 1.30E-08 1.30E-08 9.40E-09 9.40E-09 -9.00E-09 -9.00E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 3.30E-08 2.70E-08 2.60E-08 1.40E-08 8.96E-09 6.10E-09 -1.21E-08 -9.69E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
UAI (ΔCDF) 1.20E-07 3.30E-07 7.90E-09 7.90E-09 4.20E-09 4.20E-09 4.30E-09 4.30E-09
URI (ΔCDF) -3.80E-07 -3.80E-07 -3.80E-07 -3.80E-07 -1.60E-07 -1.60E-07 -1.60E-07 -1.60E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.60E-07 -5.00E-08 -3.72E-07 -3.72E-07 -1.56E-07 -1.56E-07 -1.56E-07 -1.56E-07

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum activity N/A 0.000201 0.000209 0.000244 0.000238 0.000219 0.000226 0.000227 0.000235 0.000248 0.000711 0.000264
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value N/A 0 0 0 0 0 0 0 0 0 0.1 0
Reactor Coolant System Activity 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum activity 0.000484 0.000381 0.000443 0.000563 0.000739 0.000743 N/A N/A 0.000221 0.000238 0.000238 0.000234
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0 0 0 0.1 0.1 0.1 N/A N/A 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07 7/07 8/07 9/07
Maximum leakage N/A 0.030 0.013 0.030 0.049 0.070 0.028 0.063 0.055 0.047 0.051 0.041
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value N/A 0.3 0.1 0.3 0.5 0.7 0.3 0.6 0.6 0.5 0.5 0.4
Reactor Coolant System Leakage 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08 7/08 8/08 9/08
Maximum leakage 0.076 0.048 0.056 0.058 0.049 0.050 N/A 0.021 0.049 0.066 0.059 0.032
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.8 0.5 0.6 0.6 0.5 0.5 N/A 0.2 0.5 0.7 0.6 0.3

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful opportunities 97.0 18.0 13.0 188.0 12.0 130.0 35.0 43.0
Total opportunities 102.0 19.0 16.0 200.0 12.0 133.0 39.0 43.0
                 
Indicator value 94.6% 94.5% 94.0% 94.0% 93.0% 94.4% 94.0% 95.0%

Licensee Comments: none






Link to Notes

ERO Drill Participation 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Participating Key personnel 179.0 175.0 181.0 199.0 192.0 188.0 191.0 183.0
Total Key personnel 183.0 183.0 183.0 200.0 193.0 190.0 191.0 183.0
                 
Indicator value 97.8% 95.6% 98.9% 99.5% 99.5% 98.9% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
Successful siren-tests 792 798 798 756 882 755 756 798
Total sirens-tests 793 798 798 756 882 756 756 798
                 
Indicator value 99.1% 99.7% 99.9% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
High radiation area occurrences 1 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 1 1 1 1 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08 3Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: November 26, 2008