Be Your Own Power Company

Be Your Own Power Company graphicby David Morris

Rodale Press, 1982. Copyright Institute for Local Self-Reliance.

319 pages

Contents

  • Introduction (308K .pdf)
  • Chapter I: The Electric Revolution (1.4 MB .pdf)
    Edison and the Rise of the Modern Utility
    The New Deal Electrifies the Nation
    The Pendulum Swings Back: Decentralized Power
  • Chapter II: How the Electric System Works (1.4 MB .pdf)
    The Modern Steam Plant
    Case Study: Boston Edison
    System Reliability
    Utility Planning
  • Chapter III: PURPA (2.3 MB .pdf)
    Qualifying for PURPA
    Utility Avoided Costs Data
    Purchase Prices and Avoided Costs: A Brief History
    Avoided Capacity Costs
    As Available Capacity Credits
    Excess Capacity
    When Utility Purchases Are Not Required
    All-Requirements Utilities and Wheeling
    Wheeling
  • Chapter IV: Interconnecting with the Grid (1 MB .pdf)
    Protecting the Worker, the Customer and the Network
    Generators, Inverters, Self-Excitation and Power Factors
  • Chapter V: Getting the Best Deal (1.3 MB .pdf)
    The Regulatory Process
    The Negotiation Process
    Force Majeure and Interruption of Power
    Paying Interconnection Costs
  • Chapter VI: Electric Generation Technologies (1.8 MB .pdf)
    Wind Power
    Hydropower
    Photovoltaics
    Cogeneration
  • Chapter VII: Economics (1 MB .pdf)
    A Simplified Guide to Energy Economics
    Opportunity Costs
    Case Study: Wind Power
    Hydropower
    Cogenerators
    Photovoltaics
  • Appendix 1: PURPA Sections 201 and 210 (230K .pdf)
  • Appendix 2: Federal Energy Regulatory Commission Regulations Implementing PURPA Sections 201 and 210 (699K .pdf)
  • Appendix 3: Electricity Generated by Oil (38K .pdf)
  • Appendix 4: Twenty-five Most Expensive and Twenty Five Least Expensive Service Territories (56K .pdf)
  • Appendix 5: Cost-of-Service Data for Selected Utilities (67K .pdf)
  • Appendix 6: Source List: Equipment and Publications (178K .pdf)
  • Appendix 7: States' Cogeneration Rate-Setting under PURPA (249K .pdf)
  • Notes (152K .pdf)
  • Bibliography (111 K .pdf)