Site Profile
- Introduction
(Approved April 11, 2005)
PDF 28 KB (7 pages)
- Site
Description
(Revised October 4, 2006)
PDF 981 KB (27 pages)
Revision Includes: Approved Revision 01 to make changes according to the public
outreach meetings of 09/2004 and 11/2005 and claimant
communications. Added required language from NIOSH in the
Introduction. Incorporates internal formal review comments,
including adding the pilot plant information at the end of section 2.2.
Added a Purpose and Scope, Sections 2.1.1 and 2.1.2. Incorporates
NIOSH formal review comments. This revision results in no change
to the assigned dose.
- Occupational
Medical Dose
(Page Change Revision July 4, 2006)
PDF 102 KB (23 pages)
Page Change Revision Includes: Page change revision to incorporate introductory
language from NIOSH on pages 5 and 6 in Section 3.0. Deletes the uterus as an analogue/surrogate organ in Table 3.3.3-1 on page 13 in Section 3.3.3 as per Task 5 comment. No changes occurred as a result of formal internal review. Incorporates NIOSH formal and DOL review comments. No sections were deleted.
- Occupational
Environmental Dose
(Approved April 5, 2005)
PDF 196 KB (29 pages)
- Occupational Internal
Dose
(Approved October 7, 2005)
PDF 231 KB (31 pages)
- Occupational External Dose
(Page Change Revision November 8, 2006)
PDF 875 KB (44 pages)
Page Change Revision includes: Approved page change revision to incorporate changes according to
Task 5 comment and Task 7 amendment to page 27 and 28 in
Section 6.4.1.1. Corrects table numbering on page 28 and 29. Adds
two references to page 34. Corrects GEND references on pages 20,
24, and 32. No sections were deleted. Incorporates internal formal
review comments. Incorporates NIOSH formal review comments.
Minor editorial changes were made on pages 24 and 29. Deletes
Task 7 amendment to page 27 and 28 in Section 6.4.1.1. Corrects
Table 6-5 rows 2 and 3 on page 18. This revision results in an
increase in assigned dose and a PER is required.
Top of Page
Technical Information Bulletins (TIBs)
At the current time, there are no TIBs for the Pinellas Plant.
Top of Page
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
- PER 4: Application of Photofluorography at the Pinellas Plant
PDF 373 KB (3 pages)
Document Number: OCAS-PER-0004 Rev-00
About this Document: Describes the evaluation of the programmatic
effect of the discovery of photofluorographic examinations on dose reconstructions for employees of the Pinellas Plant.
Approved: February 15, 2005
Summary: Evidence of photofluorography as discovered in a claimant's medical records from the Pinellas Plant. As a result, photofluorography use at Pinellas is now assumed through 1959. This assumption will not change the likely compensability of any completed dose reconstruction. The relevant ORAU procedure will be modified, and photofluorography use will be assumed in the Pinellas Plant site profile.
-
PER 28: Pinellas TBD Revision
PDF 14 KB (1 page)
Document Number: OCAS-PER-028 Rev-00
About this Document: New document to determine which
previously completed claims require
evaluation for the effect of revising the
Pinellas TBD.
Approved: October 30, 2007
Summary: There were 24 Pinellas dose reconstructions completed with a probability of causation below 50% between August 3, 2006, and November 8, 2006. NIOSH will review these dose reconstructions to determine if missed photon dose was included when appropriate. NIOSH will provide DOL with the list of 24 claims as well as a determination on each claim as to whether a new Dose Estimate is required. Documentation for each claim not requiring a new dose reconstruction will provide the basis for that determination.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for the Pinellas Plant:
Top of Page
Advisory Board Work Group on the Pinellas Plant
This Work Group is responsible to review the Pinellas Plant Site Profile (as revised), to review the SC&A Review of the Pinellas Site Profile, to consider issues raised by the Board's contractor (SC&A) concerning the site profile, and to assist NIOSH and SC&A in the resolution of such issues. The Work Group may recommend to the Board changes in the site profile as appropriate.
- Work Group Members
Phillip Schofield-Chair
Bradley Clawson
John Poston
Robert Presley
Michael Gibson--Alternate
- Meeting Information
- January 8, 2009--Postponed
Meeting of the Advisory Board's Work Group on the Pinellas Plant
Cincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
(859) 586-0166
9:30 a.m. (Eastern time)
This meeting is open to the public, but without a public comment period. Teleconference call access is available for this meeting and it is limited only by the number of ports available. To access the meeting via the teleconference call access, you must dial 1-866-659-0537. To be automatically connected to the meeting, you will need to enter the following participant code: 9933701.
An agenda will be provided at a later date.
Please note that as part of the procedures and processes of the Advisory Board's Work Groups, several kinds of pre-decisional documents may be developed. These documents, which can include white papers, matrices, working drafts, etc., are distributed among the Work Group members as research and background tools to facilitate discussion and deliberation. The discussions during the above meeting may cover a pre-decisional document. Because these types of documents are pre-decisional in nature, may contain sensitive information, and may change over time, they are not posted on our Web site. These finalized, reviewed and redacted pre-decisional documents are also available to other interested parties through an appropriate Freedom of Information Act request. Requests for documents not in the public domain should be submitted to the CDC/ATSDR Freedom of Information Act Office at foiarequests@cdc.gov.
- June 11, 2008
Meeting of the Advisory Board's Work Group on the Pineallas
Plant
Cincinnati Airport Marriott
2395 Progress Dr.
Hebron, KY 41048
(859) 586-0166
9:00 a.m. (Eastern time)
This meeting is open to the public, but without a public comment period.
Teleconference call access is available for this meeting
and it is limited only by the number of ports available.
To access the meeting via the teleconference call access,
you must dial 1-866-659-0537. To be automatically connected
to the meeting, you will need to enter the following participant
code: 9933701.
Agenda items will be provided at a later date.
Transcript
PDF 256 KB (180 pages)
Please note that as part of the procedures and processes of the Advisory Board's Work Groups, several kinds of pre-decisional documents may be developed. These documents, which can include white papers, matrices, working drafts, etc., are distributed among the Work Group members as research and background tools to facilitate discussion and deliberation. The discussions during the above meeting may cover a pre-decisional document. Because these types of documents are pre-decisional in nature, may contain sensitive information, and may change over time, they are not posted on our Web site. These finalized, reviewed and redacted pre-decisional documents are also available to other interested parties through an appropriate Freedom of Information Act request. Requests for documents not in the public domain should be submitted to the CDC/ATSDR Freedom of Information Act Office at foiarequests@cdc.gov.
Top of Page
Miscellaneous Public Meetings
- February 28-29
NIOSH staff will be in Pinellas Park, Florida, to meet with former and current Pinellas Plant workers about the SEC Petitioning Process
Banquet Masters
8100 Park Boulevard North
Pinellas Park, Florida
Thursday, February 28: 6:30 p.m. - 9:00 p.m. (Eastern time)
Friday, February 29: 9:00 a.m. - 11:00 a.m. (Eastern time)
Please note that both meetings will be identical in format and information. Holding two meetings provides an opportunity for energy workers and other's interested in this information to attend whichever meeting is most convenient. Space is limited so please attend only one of the two meetings to allow room for others who may also be interested in attending. Attendance at these meetings is voluntary and will not affect individual claims filed under Parts B or E of EEOICPA.
These meetings are intended to provide basic information on the SEC petitioning process, and will cover topics such as (1) how to file an SEC petition, (2) who is eligible to file an SEC petition, (3) what steps SEC petitions go through, and (4) background information about the SEC.
Please note that NIOSH representatives at the meeting will not have access to information pertaining to individual dose reconstructions, and will not be equipped to answer such questions while in Pinellas Park.
Top of Page
Comments on Pinellas Plant Documents
How to Submit Comments
Comments on Pinellas Plant documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (041) on all comments.
Comments Received
Top of Page
Previous Versions of Pinellas Plant Documents
- Site Profile: Site
Description
(Approved August 5, 2005)
PDF 887 KB (23 pages)
- Site Profile: Occupational
Medical Dose
(Approved May 6, 2005)
PDF 102 KB (22 pages)
- Site Profile: Occupational External Dose
- Page Change Revision August 3, 2006
PDF 926 KB (42 pages)
Page Change Revision includes: Approved page change revision to incorporate changes according to the public outreach meetings in 09/2004 and 11/2005 and claimant communications. Updated required language on pages 6 and 7 in Section 6.1. Added Purpose and Scope Sections on page 7. Changes occurred on page 10, in Section 6.1.4, page 27 in Section 6.4.2, and on pages 29 - 32 in the Reference Section. As a result of internal formal review, changes were made to Tables 6-4, 6-5, 6-11, and 6-12 on pages 16, 17, 25, and 27, respectively in Sections 6.2.3 and 6.4.1.1 and 6.4.2. Wording was added or changed on pages 10, 15, 19, 23, 24, and 27, in Sections 6.1.1, 6.2.3, 6.2.4, 6.3, and 6.4.2.1. No sections were deleted. This revision results in a reduction in assigned dose.
- Approved September 15, 2005
PDF 584 KB (41 pages)
Top of Page
Page last updated: November 25, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)
|