Title: Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge
Author: Wacker, J. P.; Catherman, S. C.; Winnett, R. G.
Date:
Source: (Research paper FPL ; RP-560):17 p. : ill., maps ; 28 cm.
Station ID: RP-FPL-560
Description: In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation. Performance monitoring involved gathering and analyzing data relative to the wood moisture content, force level in the stressing bars, vertical bridge creep, and behavior under static load conditions. In addition, comprehensive visual inspections were conducted to assess the condition of the overall structure. Based on field evaluations, the bridge is performing well with no structural or serviceability deficiencies.
Keywords: Bridges, Structural timbers, Laminated wood, Stress analysis, Performance, Construction technology, Stress lamination, Box beams
View and Print this Publication (814 KB)
Publication Notes:
- We recommend that you also print this page and attach it to the printout of the article, to retain the full citation information.
- This article was written and prepared by U.S. Government employees on official time, and is therefore in the public domain.
Get the latest version of the Adobe Acrobat reader or Acrobat Reader for Windows with Search and Accessibility
Citation
Wacker, J. P.; Catherman, S. C.; Winnett, R. G. . Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge . (Research paper FPL ; RP-560):17 p. : ill., maps ; 28 cm..