The purpose of this web
page describes the wire weight gage used by the National Weather Service to
measure river stage and the typical installation and maintenance procedures for
a wire weight gage. The web page also
contains a series of digital
photographs illustrating the installation process.
The web
page contains the following sections:
·
Verifying the
Check Bar Reading
·
Datum
·
Leveling
·
Re-Installation
of Wire Weight at an Established Site
·
Replacement
of a Lost Weight
·
Routine
Use/Reading of the Wire Weight
Wire Weight Gage
The Type “A” wire weight
gage (above) is one of several types of river gages used by the NWS to measure
river stage. The gage consists of a drum
wound with a single layer of stainless steel cable, a brass weight attached to
the end of the cable, a graduated disk, and a veeder counter mounted in a
locking metal box. One revolution of the
cable drum equals a one-foot length of cable.
The disk (graduated in tenths and hundredths of a foot) connects to the
veeder counter, which advances with each full revolution of the drum. The cable is made of 0.045-inch diameter
stainless steel wire, and fills the drum using a threaded sheave. The wire weights reel assembly is equipped
with a ratchet used to lock the drum and cable in any position by means of a
pawl.
Parts
identification
Return
to the Table of Contents
Hydrologic Program Managers
and Hydrometeorological Technician verify the check bar reading of an existing
wire weight gage by sliding the check bar (at the bottom of the gage) fully
forward toward the drum. When in this
position, the cable weight, when released, can rest on the check bar. The check
bar reading equals the combined reading from the veeder counter and the
number of gradations on the graduated disk when the weight is resting on the
bar with no slack in the cable.
Caution #1: Be sure you do not have
any loose items in pockets (especially keys!) that may fall out (into the river
below) when you lean over the railing.
The figures below show a
wire weight gage with the check bar forward, supporting the weight, and the
gage with the check bar back position, allowing the weight to descend to the
river.
Check
bar (forward)
Check
bar (back)
Return to the Table of Contents
Generally, wire-weight gages
mount to the upstream side of a bridge above the main channel of the river or
stream. The gages attach using several
methods. In some cases, the gage mounts
directly to the bridge with bolts. In
other cases, the gage mounts using straps to secure it to the railing. Many newer bridges have concrete barriers on
each side, necessitating hanger straps designed for the bridge. The owner of the bridge decides the method of
mounting the gage. Some bridge owners
will allow the wire weight wage to attach into the concrete.
VERY IMPORTANT…Consult with the bridge
owner for permission to install a wire weight gage.
It is good practice to check to the wire weight
gage adjustments prior to going to the bridge site.
It is common to find a new wire weight gage on which the main dial
switches from one foot to the next at a gradation other than 0.00. For instance, the dial may change from 23 ft
to 24 ft at 23.85 or 24.20. If left
unchanged, this can cause confusion for the observer. Check this in the shop if possible.
Use an Allen wrench to
loosen the small brass collar on the gage shaft near the dial. Turn the collar to re-tighten on the shaft,
and then turn the handle and viewing the new turnover point. It sometimes takes several tries to get it
right. The dial should turn over when
0.00 is read by the pointer and the dial has just
switched to the next foot.
Caution #2: Never mount a wire
weight gage on a bridge without help.
Installation of a wire weight is a two-person job. Be sure someone is available to help when
installation of a gage is scheduled.
Please note that the NWS is only responsible for
the installation and maintenance of NWS owned wire weight gages. Gages owned by other agencies are their
responsibility.
After mounting the gage on
the bridge, run level from a known elevation point to the gage. Consult with the owner of the bridge for
nearby benchmarks or reference elevations.
Often, the owner will agree to run a level for the wire-weight check
bar. The objective of running a level on
the new gage is to develop a check bar setting.
The process of determining the check bar elevation is calculated from
the "gage zero datum".
Return
to the Table of Contents
The datum of the gage may
be a recognized datum, such as mean sea level (MSL), or an arbitrary datum
chosen for convenience (so stages are a relatively low numerical value). To eliminate the possibility of negative values
of the river stage, the "gage zero" datum selected for operating
purposes is set below the elevation of zero flow on the control for all
possible conditions.
Maintain a permanent datum
so a station uses only one datum for the gage height. To maintain a permanent datum, each gaging
site requires at least two reference marks or benchmarks that are independent
of the structure on which the gage is mounted.
Periodically run levels from reference marks to maintain a fixed datum.
Reference: Bench Mark and Zero Datum
Note, in the figure above,
the "gage zero datum" is below the streambed. The next several paragraphs describe how to
calculate the "gage zero datum".
If the gage is being
installed where a gage was located previously, the previous zero datum is
usually used. If installing the gage at
a new gage site, the Hydrologic Program Manager must establish zero datum.
When installing a gage at a
new site, first measure the elevation of the deepest part of the channel along
the face of the bridge. Survey the
elevation with the rod person wading across if the stream is small and shallow.
If the water is too deep or
swift for wading, the lowest channel elevation can be determined by performing
soundings from the bridge deck.
Soundings are measurement of depth or distance from the bottom of
channel to the water surface, bridge rail, bridge deck, or other feature of
known elevation, using a cloth tape measure and attached weight. Determine the lowest elevation of the channel
by subtracting the deepest sounding from a referenced elevation. Choose a zero datum elevation two to three
feet lower than the lowest part of the channel.
That way if the channel should experience scour in the future, the water
surface during low flow will not fall below the zero of the gage. For example, if the lowest part of the
channel at the gage site was 950 ft above MSL, choose a zero datum of 947 ft
MSL.
If the channel bottom is
solid rock, there is no need to set the zero datum of the gage two to three
feet below the lowest channel bottom.
One foot would be enough.
Conversely, if the channel is composed of sandy, loose material, three
feet of may not be enough.
Please note: Try to install
the wire weight gage during low flow.
This will make it easier to get a cross-stream profile and determine the
lowest point in the channel.
Return
to the Table of Contents
A benchmark or a reference mark,
with a known elevation, is the control for the elevation of the check bar and
the zero datum of the gaging site. When
setting a wire-weight gage, perform leveling to find the elevation of the check
bar and determine the elevation of zero datum.
The figure below shows the
leveling rod sitting on the wire-weight gage check bar.
Hold
leveling rod on check bar
Return
to the Table of Contents
On occasions such as the
replacement of a bridge, a wire weight gage may need to be re-installed and new
check bar values established.
When re-installing a wire
weight gage at an established wire weight site, the gage zero is usually
already established. If this gage zero
is still valid, the re-installed gage will be set against this value. If the gage zero is no longer valid, the gage
zero must be re-established. The
established gage zero elevation is simply subtracted from the surveyed
elevation of the re-installed wire weight check bar elevation, or the distance
in feet and hundredths of a foot that the check bar is above the gage
zero. This distance becomes the check
bar reading of the newly installed gage.
Bring the gage back into
tolerance if the observed check bar reading differs by 0.03 ft or more from the
official check bar established for the station.
Official check bar values are on WS Form B-19 or B-44.
Calibrating the gage, setting the check bar to the
proper stage
The cable drum is fastened
to the handle and shaft assembly by a friction clamp. Loosen the friction clamp to set the
check bar reading. This
allows the handle and shaft attached to the veeder counter to turn
independently of the cable drum. This
also allows the observer to hold the cable, weight, and drum in place while
obtaining a check bar reading on the counter and graduated disk. (See picture above.)
Caution #3: Hold the cable drum in
place to prevent the weight from free fall after releasing the handle shaft
assembly from the drum cable assembly.
Use the procedures listed
below to set the check bar reading on the gage.
Caution #4: Tighten both screws
before letting go of the cable drum.
Handle in wrong position for closing cover
Document the new check bar
reading on the B-44 for the station.
Also, make the new check bar setting available to the Hydrologic Program
Manager, the
Return
to the Table of Contents
When a weight is lost from
a wire weight gage, consider two factors: the length of the remaining cable and
the condition of the cable. These
factors determine the correct method of repair.
Unwind and rewind the remaining cable and count the number of feet of
cable left (one revolution of the drum equals one foot of cable). Visually inspect the condition of the
remaining cable, and replace if the cable fraying or kinking is noted.
Install a new brass weight
on the existing cable if the remaining cable is in acceptable condition and
sufficient cable remains on the drum to allow the weight to extend several feet
below gage zero.
If the remaining cable on
the wire weight is unacceptable or if it is too short to extend several feet
below gage zero, replace the cable. A drum should be
near capacity (100 ft) regardless of the amount required for a reading. Having a full drum of cable allows
replacement of weights without addition of new cable.
Cable replacement follows
these steps:
Caution #5: Keep tension on the
cable while installing the new weight to prevent the cable from tangling.
Adding
the weight to the cable
Tightening
the nut on the weight
At this time, the gage
should be back in operation. Lower the weight
to water level and rewind it. Cable
should rewind evenly on the drum.
After installation of the
new cable and weight, the wire-weight check bar reading must be set as
previously described. The gage is now
operational.
Return
to the Table of Contents
During routine river stage
observations, use the following procedures:
Return
to the Table of Contents
Access a series of pictures
illustrating the steps in wire-weight gage installation by clicking here.
Return
to the Table of Contents