Technical Basis Document
Basis for Development of an Exposure Matrix for Huntington
Pilot Plant
(Revised January 16, 2004)
PDF 410 KB (17 pages)
Revision Includes: Revision resolves issue of exposure to electrons and make document applicable to skin cancers.
Top of Page
Technical Information Bulletins (TIBs)
At the current time, there are no TIBs for the Huntington Pilot Plant.
Top of Page
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
- PER 25: Huntington Pilot Plant TBD Revision
PDF 14 KB (1 page)
Document Number: OCAS-PER-0025 Rev-00
About this Document: New document to determine which
previously completed claims require
evaluation for the effect of revising the
Huntington Pilot Plant TBD.
Approved: September 28, 2007
Summary: There was one Huntington Pilot Plant claims completed for the above target organs with a probability of causation below 50% prior to 1/16/2004. NIOSH is requesting that this claim be returned for a new dose estimate. A new dose reconstruction will be completed using the latest revision to the Huntington Pilot Plant TBD.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for the Huntington Pilot Plant:
- January 5, 2006
Meeting with United Steelworkers of America (USW) Local 40, Huntington, West Virginia
Final Minutes
PDF 72 KB (10 pages)
Top of Page
Comments on Huntington Pilot Plant Documents
How to Submit Comments
Comments on Huntington Pilot Plant documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (017) on all comments.
Comments Received
At this time, no comments have been submitted on the Huntington Pilot Plant Technical Basis Document.
Top of Page
Previous Versions of Huntington Pilot Plant Documents
Technical Basis Document: Basis for Development of an Exposure Matrix for Huntington Pilot Plant
Approved October 31, 2003
PDF 546 KB (17 pages)
Top of Page
Page last updated: April 12, 2007
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)
|