[Federal Register: October 29, 1998 (Volume 63, Number 209)] [Notices] [Page 58032-58033] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr29oc98-64] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Ready For Environmental Analysis October 23, 1998. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Major License. b. Project No.: 2620-005. c. Date Filed: March 9, 1998. d. Applicant: Lockhart Power Company. e. Name of Project: Lockhart Hydroelectric Project. f. Location: On the Broad River in Union, Chester, York, and Cherokee counties, South Carolina. g. Filed Pursuant to: Federal Power Act 16 USC Secs. 791(a)-825(r). h. Applicant Contact: Mr. Leslie Anderson, General Manager, Lockhart Power Company, 420 River Street, Lockhart, South Carolina 29364, (864) 545-2211. i. FERC Contact: Charles R. Hall, 202-219-2853, or E-mail at charles.hall@ferc.fed.us j. Deadline for comments, recommendations, terms and conditions, and prescriptions: See attached paragraph. k. Status of Environmental Analysis: The application is now ready for environmental analysis--see attached paragraph D10. l. Brief Description of Project: The existing project consists of: (1) a 16-foot-high, concrete gravity dam; (2) a 7.5-mile-long, 300-acre reservoir; (3) a 7,497-foot-long canal; (4) a powerhouse containing five turbine-generator units with a total installed capacity of 15,200 kilowatts (kW), proposed for upgrading to 18,000 kW; (5) a 1,500-foot- long tailrace; and (6) appurtenant facilities. m. This notice also consists of the following standard paragraphs: A4 and D10. n. A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at: 888 First St., NE., Room 2A, Washington, DC 20426, or by calling (202) 208- 1371. A4. Development Application--Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission's regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. D10. Filing and Service of Responsive Documents--The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions and prescriptions concerning the application be filed with the Commission within 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008. All filings must (1) bear in all capital letters the title ``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the name of the applicant and [[Page 58033]] the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Project Review, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-28938 Filed 10-28-98; 8:45 am] BILLING CODE 6717-01-M