[Federal Register: December 11, 1998 (Volume 63, Number 238)] [Notices] [Page 68450-68451] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr11de98-38] ======================================================================= ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5497-7] Environmental Impact Statements; Notice of Availability RESPONSIBLE AGENCY: Office of Federal Activities, General Information (202) 564-7167 or (202) 564-7153. Weekly receipt of Environmental Impact Statements Filed November 30, 1998 [[Page 68451]] Through December 04, 1998 Pursuant to 40 CFR 1506.9. EIS No. 980488, FINAL SUPPLEMENT, EPA, LA, Atchafalaya River Bar Channel Ocean Dredged Material Disposal Site Designation, Updated Information, St. Mary Parish, LA , Due: January 11, 1999, Contact: Joe Swick (214) 665-7456 EIS No. 980489, DRAFT EIS, IBR, CA, Groundwater Replenishment System, Implementation to Repurifying Water from Orange County Water District (OCWD) Orange County Sanitation District (OCSD), Funding and COE Section 404 Permit, Orange County, CA, Due: February 01, 1999, Contact: Del Kidd (702) 293-8698 EIS No. 980490, FINAL EIS, TVA, TN, GA, MS, VA, AL, KY, NC, Shoreline Management Initiative: An Assessment of Residential Shoreline Development Impacts in the Tennessee Valley, Mainstream Tennessee River and Tributary Reservoirs in AL, KY, NC, TN, GA, MS and VA, Due: January 11, 1999, Contact: Harold M. Draper (423) 632-6889 EIS No. 980491, FINAL EIS, STA, NM, TX, Programmatic EIS--International Bridge Crossing Project, Construction and Operation, Along the United States-Mexico Border from EL Paso to Brownsville, TX, Presidential Permit, NM and TX, Due: January 11, 1999, Contact: Eric Verwers (817) 978-0202. EIS No. 980492, FINAL SUPPLEMENT, JUS, CA, Service Processing Center (SPC) for Detainees, Construction and Operation, Possible Sites, Stockton and Tracy Sites, San Joaquin Counties, CA, Due: January 11, 1999, Contact: William A. Kopitz (202) 307-1877 EIS No. 980493, DRAFT EIS, AFS, MT, Swamp Timber Sales Project, Implementation, Kootenai National Forest, Fortine Ranger District, Lincoln County, MT, Due: January 25, 1999, Contact: Robert G. Carlin (406) 882-4451. EIS No. 980494, FINAL EIS, COE, MN, WI, Duluth-Superior Harbor Phase II, Dredge Material Management Plan, Cities of Duluth, St. Louis County, MN and Douglas County, WI, January 11, 1999, Contact: Mr. Terry A. Long (313) 226-6758. EIS No. 980495, DRAFT EIS, FHW, IN, IN-641 Terre Haute Bypass, Improve access between US 41 South to I-70 East of Terre Haute, Funding and COE Section 404 Permit, Vigo County, IN, Due: March 01, 1999, Contact: Douglas N. Head (317) 226-7487. EIS No. 980496, DRAFT EIS, NPS, DC, The White House and President's Park, Comprehensive Design Plan, Implementation of a Framework for Future Management, Washington, D.C., Due: March 11, 1999, Contact: James I. McDaniel (202) 619-6344. EIS No. 980497, DRAFT EIS, FTA, WA, Central Link Light Rail Transit Project, (Sound Transit), Construct and Operate an Electric Rail Transit System, Funding and COE Section 10 and 404 Permit, In the Cities of Seattle, Sea Tac and Tukwila, King County, WA, Due: February 05, 1998, Contact: Helen Knoll (206) 220-4464. EIS No. 980498, DRAFT EIS, AFS, UT, Brighton Ski Resort Master Development Plan Updated, Implementation, Wasatch-Cache National Forest, Salt Lake City, UT, Due: January 26, 1999, Contact: Steve Scheid (801) 943-9483. Amended Notices EIS No. 980396, DRAFT EIS, COE, AL, GA, FL, Apalachicola-Chattahochee- Flint (AFC) River Basin Water Allocation, Allocation Formula Approval, AL, FL and GA, Due: February 26, 1999, Contact: Joanne Brandt (334) 690-3260. Published FR 10-09-98--Review Period extended. EIS No. 980401, DRAFT EIS, COE, AL, GA, Alabama-Coosa-Tallapoosa (ACT) River Basin Compact, Water Allocation, several counties, AL and GA, Due: February 26, 1999, Contact: Michael L. Eubank (334) 694-3861. Published FR 10-09-98 Review Period Extended. EIS No. 980435, DRAFT EIS, USA, GA, U.S. Army/Fort Benning and The Consolidated Government of Columbus Proposed Land Exchange, Muscogee and Chattahoochee Counties, GA, Due: December 14, 1998, Contact: John Brent (706) 545-4766. Published FR-10- 30-98 EIS Status. Correction. Changed from Preliminary DEIS to DEIS. EIS No. 980453, DRAFT EIS, NPS, TX, Lyndon B. Johnson National Historical Park, Package 227, General Management Plan, Implementation, Blanco and Gillespie Counties, TX, Due: December 28, 1998, Contact: Leslie Starhart (830) 868-7128 ext. 226. Published FR 11-13-98 Correction to Telephone Number. EIS No. 980460, DRAFT EIS, AFS, MT, Clancy-Unionville Vegetation Manipulation and Travel Management Project, Implementation, Helene National Forest, Helena Ranger District, Lewis and Clark and Jefferson Counties, MT, Due: February 01, 1999, Contact: Dave Turner (406) 449- 5490. Published FR-11-13-98--Review Period Extended. Dated: December 8, 1998. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 98-33004 Filed 12-10-98; 8:45 am] BILLING CODE 6560-50-P