Greenup (Lock and Dam)
Greenup, KY

Photo - Greenup Photos
General Information
River and Harbor Act of 3 March 1909, Sixtieth Congress, 2nd Session.

Lock Replacement $244,550,000;Dam Rehabilitation $ 46,700,000; Fish Hatchery Mitigation $13,800,000

Non-navigable, high-lift, moveable gated dam, top length 1,287ft, including 245-foot fixed weir with 223-foot open crest. Nine tainter gates, clear span 100ft between 14-foot intermediate piers and 15-foot end piers, damming height 35ft above sills, clearance above maximum high water when fully raised approximately 5ft. The dam gates are non-submergible ogee sill units.
Of 3,258 acres in the project, approximately 166 acres fee required for the lock site, 45 acres fee for the abutment sites, 96 acres fee for recreation sites, 305 acres pondage easements were assigned to the Chesapeake & Ohio Railway Company and State Highway Department and Armco Steel Corporation and the City of Ashland, Kentucky, and Stowage easements or other lesser interests over the remaining area. In addition, 11.38 acres fee reassigned from old lock and dam sites.
The City of Hamilton, Ohio operates the hydroelectric plant of the Ohio abutment of Greenup Dam. The plant includes three turbines with total capacity of 70,000 kilowatts. The Federal Energy Regulatory Commission issued License Number 2641 for the project on 29 March 1976. The project was placed in commercial operation on 7 December 1982. The entire generating structure is a watertight, steel-plate enclosure constructed in dry dock at St. Nazaire, France. The structure was shipped across the Atlantic Ocean, unloaded and towed to the site via the Mississippi and Ohio Rivers.
Ohio River, 341.0 miles below Pittsburgh, PA, and 5.0 miles below Greenup, KY. Replaced locks and dams Nos. 27,28,29 and 30 on Ohio River and No. 1 on Big Sandy River.
Two parallel locks, main lock 110ft by 1,200ft, auxiliary lock 110ft by 600ft, miter service gates, vertical-lift emergency gates.

166 acres fee at lock site, 10 acres fee at abutment site, 50 acres fee at recreation site, 1,801 acres flowage easements.

Normal upper pool elevations 515.0 feet m.s.l., upper pool length 61.8 miles to Robert C. Byrd Locks & Dam, normal upper pool surface area 11,200 acres, nominal lower pool elevation 485.0 feet m.s.l., (upper pool of Captain Anthony Meldahl Dam), normal lift 30.0 feet.
A total of 11 public recreation areas are existing.
No extensive relocations necessary, but remedial measures required to adapt certain facilities to new pool conditions. Facilities include railroad and highway drainage structures and embankment slopes, municipal sewer outtakes and water intakes, pipe lines, power and communication lines, and waterway terminals.
Construction began in October 1954. The locks were initiated in October 1955 and were placed in operation 27 November 1959. Construction of the dam began in June 1958 and the pool was raised to full height 4 June 1962.
Highway bridge across the dam is completed. Hydroelectric Plant is completed.
Lock Photos
Description
31 Photos
Last Updated Mar. 10, 2004
Search
Other Lock and Dams
Announcements
No Items Available
Navigation Info
Center of Expertise for Inalnd Navigation
How and where to purchase navigation charts
On-line navigation charts available for download. This list will grow overtime to provide all charts in the LRD division.
Navigation Data Information System
The LRD website allows you to sign up for email notifications of Nav Notices that are only applicable to the tributaries of your choosing.
Locations of vessels (boats/tows/barges) on the rivers.
Page Options

HyperLink Disclaimer: The appearance of hyperlinks does not constitute endorsement by the U.S. Army of this Web site or the information, products or services contained therein. For other than authorized activities such as military exchanges and Morale, Welfare and Recreation sites, the U.S. Army does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD Web site.

Freedom of Information Act:  The Chief Counsel's Office has developed a FOIA Requester Service Center Web Site, http://www.hq.usace.army.mil/CECI/FOIA/index.htm


LRH Operations
U.S. Army Corps of Engineers, Huntington District
502 Eighth Street
Huntington, WV 25701
(304) 399-5000
LRH.Operations@usace.army.mil
Back to Top  Page Top