projects > phase two sub-basin-scale monitoring network for construction, instrumentation, and ten-year operation of seventeen water quality and streamflow monitoring stations for lake okeechobee watershed project
Phase Two Sub-Basin-Scale Monitoring Network for Construction, Instrumentation, and Ten-Year Operation of Seventeen Water Quality and Streamflow Monitoring Stations for Lake Okeechobee Watershed Project
The Phase Two Sub-Basin-Scale Monitoring Network includes: construction of seventeen water quality and streamflow monitoring stations, purchase and installation of monitoring equipment, initial equipment activation and calibration, data collection, processing, and reporting for year 1 through year 10. The eight tasks and their durations are based on the latest revisions and comments by the U.S. Army Corps of Engineers, South Florida Water Management District, the U.S. Geological Survey, and other members of the Project Delivery Team to the Phase One Network Design Proposal for Basin-scale Monitoring. Scope of Work |
U.S. Department of the Interior, U.S. Geological Survey
This page is: http://sofia.usgs.gov/projects/index.php?project_url=p2mon_net
Comments and suggestions? Contact: Heather Henkel - Webmaster
Last updated: 24 September 2008 @ 01:45 PM (BJM)