Northern
Rockies Competitive EERA Solicitation Plan
EERA Solicitation
Calendar
Information Required
at Check-In
Performance
Rating for Water Handling Equipment (ICS-224)
Performance
Rating for all other Contract Equipment
New
>> Contractor
Performance System (CPS) Registration <<
New
2008
Wage Determination
VIPR
(Virtual Incident PRocurement)
New
>> eAuthentication
- Upgrading from a Level 1 to Level 2 Account <<
New
USFS
Region 1 Final Agreements Engine & Water Tender
USFS Region 1 Final Award
Information Engine & Water Tender
** It is important to note that this
information does not guarantee that you will be hired. The
number, size and complexity of fires varies by season as does
the need for contract equipment. Additionally, you should
be aware that in most cases not all types of equipment are
needed for all emergencies. The equipment that is used/hired
is solely dependent on the nature of the emergency and the
factors (such as terrain, weather, and safety factors) that
exist surrounding the emergency. **
|