Project Management
Project Managers
credit istockphoto.com
 
The SDC Project Management Team is part of the Plans and Controls domain.  SDC Project Managers lead internal projects in support of the SDC mission and goals.
 
SDC Portfolio Manager
Natalie Rodgers
(503) 373-2032
 
The Project Managers and their current assignments:
 

Carol Johnson
(503) 373-1690
Enterprise Security
Network Infrastructure Implementation
E-mail Hub Replacement
Matt Massey
(503) 373-1695
UNIX Consolidation
iSeries Consolidation
 
 
Frank Kuchta
(503) 373-0841
TSM (Tivoli Storage Manager)
Implementation and Data Migration
 
 
 
 
Other SDC projects underway:
TADDM/TLCM Implementation
 

Projects
 
Enterprise Security
Project Goal: Partner with Cisco to implement a multi-layered solution to appropriately protect individual servers and the entire network.
 
 
Network Infrastructure Implementation
Project Goal: Replace old network devices that are in a problem state and those without support encryption devices.  The SDC Network Team assumes the management of all previously non-standard network devices.
 
 
E-mail Hub Replacement
Project Goal: replace the current e-mail hub with new hardware that will provide a multi-layered approach to manage the increasing e-mail volume.
 
 
UNIX Consolidation
Project Goal: Move all agency applications, databases, web servers, utilities and file data hosted on various UNIX platforms over to a common AIX p595 hardware and operating system platform. The old hardware will then be decomissoned  Doing so allows the SDC to save on power consumption, software costs, hardware maintenance costs, and provide added capacity that is needed to support agencies using the pSeries system.
 
 
iSeries Consolidation
Project Goal: Update the existing iSeries operating systems and associated hardware at the SDC by consolidating them onto a single IBM P6 Power System (model 595) platform. These IBM systems will be shared between both iSeries and pSeries LPARs which further consolidates the hardware platforms.
 
 
TSM (Tivoli Storage Manager) Implementation and Data Migration
Project Goal: complete the migration of data for state agencies not currently utilizing the IBM central tape library (ATL) as well as the deployment of TSM. TSM supports data migration and ongoing maintenance of centralized storage/back-up services.
 
 
TADDM/TLCM Implementation
Project Goal: Configure and deploy both the Tivoli Application Dependency Discovery Manager (TADDM) and Tivoli License Compliancy Manager (TLCM) packages to the SDC environment.  TADDM and TLCM will be used by the SDC to discover, monitor and support applications and software. This knowledgebase will provide information to the SDC Disaster Recovery (DR) plan.
 
 
Back to the Top

Project Resources

Portfolio Status Report
Tech Forums Held

Project Quick Links

Enterprise Security
Network Infrastructure
E-mail Hub

UNIX Consolidation
iSeries Consolidation

TSM Implementation
TADDM Implementation
TLCM Implementation